Show Job Controls
Bid Cobra

KAUFMAN US 175 (0197-05-059)

Items: 124

County: KAUFMAN
Length: N/A
Highway: US 175
District: DALLAS
Control Number: 0197-05-059
DBE Goal: N/A
Project: C 197-5-59
Guaranty: N/A
Time: 330 WORKING DAYS
Engineer's Estimate: $35,917,861.53
Date: 06/28/2023 (2 years ago)
Contract Number: N/A
Type: REHABILITATE EXISTING ROADWAY
Mail/Deliver Bids To: N/A
LANE SELMAN
NICHOLAS WADLINGTON
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$35,917,861.53
$36,849,199.79
Over/Under Est: 2.59% $931,338.26
Over/Under Est: 19.07% $6,851,194.25
Amt Left: 16.07% $5,919,855.99
Subcontractor Percentage Amount
JM YANEZ CONSTRUCTION, INC. 4.35% $1,579,995.40
O. TREVINO CONSTRUCTION, LLC 3.81% $1,383,858.04
TRP CONSTRUCTION GROUP, LLC 3.01% $1,093,284.17
VANN/ELLI, INC. 2.79% $1,013,376.36
DUSTROL, INC. 2.38% $864,457.25
A. E. MOORE CONSTRUCTION, INC. 1.43% $519,400.79
SYNERGY SIGNS & SERVICES LLC 1.09% $395,906.89
RESONANT MACHINES 1.01% $366,849.51
RMI WORLDWIDE LLC 1.01% $366,849.51
FORTSON CONTRACTING, INC. 0.70% $254,252.13
CANDJ TREE LLC 0.51% $185,240.84
HIGHWAY TRAFFIC CONTROL & SERVICES, LLC 0.14% $50,850.43
TRAFFIC HIGHWAY MAINTENANCE, LLC 0.14% $50,850.43
TEXAS TRAFFIC AND BARRICADE, LLC 0.10% $36,321.73
SURFACE PREPARATION TECHNOLOGIES, LLC 0.06% $21,793.04
ACT SAW CUTTING & REMOVAL 0.02% $7,264.35
HDZ CONSTRUCTION 0.00% $0.00
ACT SAW CUTTING & REMOVAL 0.00% $0.00
Total: 22.55% $8,190,550.87

Bid Items & Bid Tabulations

124 Total 0 of 124
KAUFMAN  |  US 175  |  DALLAS  |  0197-05-059  |  06/28/2023  |  $35,917,861.53  |  C 197-5-59  |  REHAB EXIST ROADWAY  |  330 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TEXAS MATERIALS GROUP, INC.
GRANITE CONSTRUCTION COMPANY
PREPARING ROW
STA 568.200 $8,000.000 $1,500.000 $7,550.000
REMOVING CONC (DRIVEWAYS)
SY 1,990.000 $22.000 $32.000 $10.000
REMOVING CONCRETE(MOW STRIP)
LF 3,208.000 $15.000 $11.000 $1.500
REMOVING STAB BASE & ASPH PAV (0-6")
SY 17,437.000 $15.000 $5.350 $2.060
REMOVING STAB BASE & ASPH PAV(12"-27")
SY 140.000 $15.000 $8.350 $17.860
BACKFILL (TY A OR B)
STA 568.200 $250.000 $345.000 $230.000
ROAD GRADER WORK (ORD COMP)
STA 568.200 $150.000 $212.000 $210.000
COMPOST MANUF TOPSOIL (4")
SY 153,359.000 $1.000 $1.100 $1.350
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 153,359.000 $0.250 $0.180 $0.170
DRILL SEED (TEMP)(WARM OR COOL)
SY 51,124.000 $0.250 $0.130 $0.120
VEGETATIVE WATERING
MG 30,425.000 $5.000 $0.010 $26.510
FLEX PAVEMENT STRUCTURE REPAIR(4"-12")
SY 37,180.000 $80.000 $118.000 $133.000
PLANE ASPH CONC PAV(0" TO 3")
SY 46,780.000 $4.000 $4.250 $1.000
PLANE CONC PAV(0" TO 3")
SY 24,677.000 $6.000 $4.250 $1.750
FULL-DEPTH REPAIR CPCD (11"-13")
SY 3,250.000 $300.000 $425.000 $250.000
DRILL SHAFT (SIGN MTS) (24 IN)
LF 110.000 $220.000 $320.000 $200.000
RIPRAP (MOW STRIP)(4 IN)
CY 1,380.000 $690.000 $600.000 $600.000
CLEANING AND SEALING EXISTING JOINTS
LF 182.000 $25.000 $16.000 $8.000
RC PIPE (CL III)(18 IN)
LF 2,068.000 $75.000 $75.000 $50.000
RC PIPE (CL III)(24 IN)
LF 2,196.000 $133.000 $86.000 $65.000
RC PIPE (CL III)(42 IN)
LF 118.000 $200.000 $210.000 $200.000
RC PIPE (CL III)(48 IN)
LF 62.000 $265.000 $265.000 $280.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 72.000 $1,200.000 $1,100.000 $1,000.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 88.000 $1,500.000 $1,650.000 $2,000.000
SET (TY II) (42 IN) (RCP) (6: 1) (P)
EA 2.000 $2,300.000 $10,000.000 $7,500.000
SET (TY II) (48 IN) (RCP) (6: 1) (P)
EA 2.000 $2,600.000 $11,000.000 $10,000.000
REMOV STR (SET)
EA 161.000 $600.000 $180.000 $400.000
REMOV STR (PIPE)
EA 86.000 $1,300.000 $355.000 $400.000
MOBILIZATION
LS 1.000 $3,189,975.080 $2,800,987.000 $4,000,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 20.000 $40,000.000 $24,312.000 $20,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 3,955.000 $33.000 $41.000 $40.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 490.000 $55.000 $67.000 $60.000
ROCK FILTER DAMS (REMOVE)
LF 4,445.000 $11.000 $11.000 $10.150
TEMP SEDMT CONT FENCE (INSTALL)
LF 4,652.000 $3.000 $3.450 $5.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 4,652.000 $0.600 $0.616 $0.510
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 18,885.000 $5.000 $6.000 $6.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 18,885.000 $1.300 $0.550 $0.510
DRIVEWAYS (ACP)
SY 17,454.000 $70.000 $68.000 $82.000
DRIVEWAYS (CONC) (HES)
SY 1,990.000 $150.000 $190.000 $200.000
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 171,995.000 $0.300 $0.120 $0.150
MTL W-BEAM GD FEN (TIM POST)
LF 7,950.000 $22.000 $23.000 $21.820
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 32.000 $1,900.000 $2,300.000 $1,889.380
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 3.000 $1,075.000 $1,150.000 $1,064.440
MTL BM GD FEN TRANS (31"-28")
EA 6.000 $770.000 $900.000 $819.620
REMOVE METAL BEAM GUARD FENCE
LF 7,950.000 $5.500 $2.850 $2.660
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 2.000 $200.000 $90.000 $79.840
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 32.000 $215.000 $235.000 $212.890
CABLE BARRIER SYSTEM (TL-4)
LF 19,377.000 $17.000 $19.000 $20.000
CABLE BARRIER TERMINAL SECTION (TL-4)
EA 34.000 $4,700.000 $4,200.000 $4,500.000
REMOVE CABLE BARRIER
LF 26,875.000 $17.000 $5.750 $5.000
REMOVE CABLE BARRIER TERMINAL SECTION
EA 38.000 $1,200.000 $575.000 $500.000
GUARDRAIL END TREATMENT (INSTALL)
EA 37.000 $3,000.000 $3,200.000 $2,953.810
GUARDRAIL END TREATMENT (REMOVE)
EA 38.000 $300.000 $285.000 $266.110
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 18.000 $350.000 $290.000 $239.900
ALUMINUM SIGNS (TY A)
SF 18.750 $30.000 $40.000 $33.330
ALUMINUM SIGNS (TY G)
SF 1,392.500 $40.000 $33.000 $33.330
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 198.000 $730.000 $725.000 $585.860
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 30.000 $900.000 $825.000 $909.090
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 63.000 $845.000 $1,100.000 $656.570
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 3.000 $1,180.000 $1,075.000 $808.080
IN SM RD SN SUP&AM TY10BWG(2)SA(P-EXAL)
EA 5.000 $2,000.000 $1,900.000 $1,717.170
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 19.000 $1,125.000 $1,250.000 $909.090
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 16.000 $1,100.000 $1,250.000 $909.090
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
EA 1.000 $1,200.000 $1,500.000 $1,010.100
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 8.000 $1,400.000 $1,500.000 $1,010.100
IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL)
EA 1.000 $2,700.000 $2,700.000 $1,767.680
REMOVE LRSA
EA 7.000 $1,300.000 $3,350.000 $959.600
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 68.000 $28.000 $17.000 $6.850
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 66.000 $28.000 $17.000 $6.850
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 71.000 $28.000 $31.000 $21.320
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 46.000 $28.000 $31.000 $21.320
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
EA 182.000 $95.000 $51.000 $60.610
INSTL DEL ASSM (D-SY)SZ 1(YFLX)GND
EA 32.000 $120.000 $51.000 $60.610
INSTL DEL ASSM (D-DW)SZ 1(WFLX)GND
EA 12.000 $120.000 $57.000 $60.610
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 113.000 $70.000 $62.000 $60.610
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 19,934.000 $0.500 $0.700 $0.570
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 231,006.000 $0.500 $0.590 $0.500
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 21,338.000 $0.550 $1.050 $0.750
WK ZN PAV MRK NON-REMOV (W)(ARROW)
EA 45.000 $120.000 $210.000 $129.240
WK ZN PAV MRK NON-REMOV(W)(WORD)
EA 45.000 $120.000 $245.000 $170.600
WK ZN PAV MRK NON-REMOV(W)36"(YLD TRI)
EA 10.000 $25.000 $90.000 $74.440
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 225,605.000 $0.500 $0.590 $0.500
WK ZN PAV MRK REMOV (W)6"(BRK)
LF 803.000 $0.800 $1.300 $2.580
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 13,324.000 $0.500 $1.300 $1.600
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 13,014.000 $0.800 $1.300 $1.600
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 6,387.000 $1.500 $1.200 $1.240
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 22,975.000 $1.250 $1.550 $1.240
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 1,401.000 $3.500 $6.000 $4.650
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 1,406.000 $8.000 $10.350 $8.270
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 72.000 $155.000 $210.000 $162.330
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 72.000 $170.000 $250.000 $193.340
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
EA 5.000 $75.000 $86.000 $129.240
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
LF 6,990.000 $6.000 $11.000 $7.550
REFL PAV MRK TY II (W) 6" (SLD)
LF 86,004.000 $0.300 $0.330 $0.410
REFL PAV MRK TY II (Y) 6" (SLD)
LF 86,004.000 $0.400 $0.330 $0.410
PAVEMENT SEALER 6"
LF 20,640.000 $0.300 $0.280 $0.260
PAVEMENT SEALER 8"
LF 961.000 $0.500 $0.420 $0.470
PAVEMENT SEALER (ARROW)
EA 2.000 $30.000 $40.000 $46.530
PAVEMENT SEALER (WORD)
EA 2.000 $30.000 $50.000 $59.970
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 29,027.000 $0.800 $1.140 $0.860
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 119,329.000 $0.800 $1.040 $0.780
REF PROF PAV MRK TY I(Y)6"(SLD)(100MIL)
LF 117,058.000 $0.800 $1.650 $1.270
REFL PAV MRKR TY II-A-A
EA 269.000 $5.000 $5.950 $4.910
REFL PAV MRKR TY II-C-R
EA 2,612.000 $5.000 $5.950 $4.650
ELIM EXT PAV MRK & MRKS (4")
LF 181,705.000 $0.500 $0.500 $0.470
ELIM EXT PAV MRK & MRKS (6")
LF 300,550.000 $0.500 $0.500 $0.620
ELIM EXT PAV MRK & MRKS (8")
LF 25,995.000 $1.000 $1.000 $0.930
ELIM EXT PAV MRK & MRKS (12")
LF 891.000 $1.500 $2.550 $2.330
ELIM EXT PAV MRK & MRKS (24")
LF 80.000 $4.000 $5.000 $4.140
ELIM EXT PAV MRK & MRKS (36")(YLD TRI)
EA 10.000 $20.000 $51.000 $33.090
PAV SURF PREP FOR MRK (6")
LF 20,640.000 $0.200 $0.022 $0.160
PAV SURF PREP FOR MRK (8")
LF 961.000 $0.500 $0.100 $0.250
PAV SURF PREP FOR MRK (ARROW)
EA 2.000 $25.000 $19.000 $31.020
PAV SURF PREP FOR MRK (WORD)
EA 2.000 $25.000 $21.000 $88.920
FULL - WIDTH MOWING
CYC 6.000 $8,000.000 $3,075.000 $4,800.000
CAM (ASPHALT) PG(76-22)
TON 1,163.000 $200.000 $230.000 $280.000
CAM (AGGREGATE)
TON 14,456.000 $200.000 $230.000 $280.000
RUBBILIZING EXISTING CONCRETE PAVEMENT
SY 194,574.000 $4.000 $3.350 $3.500
SP MIXES SP-C SAC-B PG64-22
TON 33,573.000 $110.000 $145.000 $150.000
SP MIXES SP-C SAC-B PG70-22
TON 66,389.000 $115.000 $152.000 $156.000
TACK COAT
GAL 52,171.000 $3.750 $4.450 $0.300
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $15,000.000 $22,000.000 $20,818.610
TMA (STATIONARY)
DAY 330.000 $150.000 $300.000 $145.000
TMA (MOBILE OPERATION)
DAY 50.000 $200.000 $300.000 $490.420
Totals: $35,917,861.530 $36,849,199.792 $42,769,055.792