PREPARING ROW
|
STA
|
568.200
|
$8,000.000
|
$1,500.000
|
$7,550.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
1,990.000
|
$22.000
|
$32.000
|
$10.000
|
|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
3,208.000
|
$15.000
|
$11.000
|
$1.500
|
|
|
REMOVING STAB BASE & ASPH PAV (0-6")
|
SY
|
17,437.000
|
$15.000
|
$5.350
|
$2.060
|
|
|
REMOVING STAB BASE & ASPH PAV(12"-27")
|
SY
|
140.000
|
$15.000
|
$8.350
|
$17.860
|
|
|
BACKFILL (TY A OR B)
|
STA
|
568.200
|
$250.000
|
$345.000
|
$230.000
|
|
|
ROAD GRADER WORK (ORD COMP)
|
STA
|
568.200
|
$150.000
|
$212.000
|
$210.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
153,359.000
|
$1.000
|
$1.100
|
$1.350
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
153,359.000
|
$0.250
|
$0.180
|
$0.170
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
51,124.000
|
$0.250
|
$0.130
|
$0.120
|
|
|
VEGETATIVE WATERING
|
MG
|
30,425.000
|
$5.000
|
$0.010
|
$26.510
|
|
|
FLEX PAVEMENT STRUCTURE REPAIR(4"-12")
|
SY
|
37,180.000
|
$80.000
|
$118.000
|
$133.000
|
|
|
PLANE ASPH CONC PAV(0" TO 3")
|
SY
|
46,780.000
|
$4.000
|
$4.250
|
$1.000
|
|
|
PLANE CONC PAV(0" TO 3")
|
SY
|
24,677.000
|
$6.000
|
$4.250
|
$1.750
|
|
|
FULL-DEPTH REPAIR CPCD (11"-13")
|
SY
|
3,250.000
|
$300.000
|
$425.000
|
$250.000
|
|
|
DRILL SHAFT (SIGN MTS) (24 IN)
|
LF
|
110.000
|
$220.000
|
$320.000
|
$200.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
1,380.000
|
$690.000
|
$600.000
|
$600.000
|
|
|
CLEANING AND SEALING EXISTING JOINTS
|
LF
|
182.000
|
$25.000
|
$16.000
|
$8.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
2,068.000
|
$75.000
|
$75.000
|
$50.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
2,196.000
|
$133.000
|
$86.000
|
$65.000
|
|
|
RC PIPE (CL III)(42 IN)
|
LF
|
118.000
|
$200.000
|
$210.000
|
$200.000
|
|
|
RC PIPE (CL III)(48 IN)
|
LF
|
62.000
|
$265.000
|
$265.000
|
$280.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
72.000
|
$1,200.000
|
$1,100.000
|
$1,000.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
88.000
|
$1,500.000
|
$1,650.000
|
$2,000.000
|
|
|
SET (TY II) (42 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$2,300.000
|
$10,000.000
|
$7,500.000
|
|
|
SET (TY II) (48 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$2,600.000
|
$11,000.000
|
$10,000.000
|
|
|
REMOV STR (SET)
|
EA
|
161.000
|
$600.000
|
$180.000
|
$400.000
|
|
|
REMOV STR (PIPE)
|
EA
|
86.000
|
$1,300.000
|
$355.000
|
$400.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$3,189,975.080
|
$2,800,987.000
|
$4,000,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
20.000
|
$40,000.000
|
$24,312.000
|
$20,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
3,955.000
|
$33.000
|
$41.000
|
$40.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
490.000
|
$55.000
|
$67.000
|
$60.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
4,445.000
|
$11.000
|
$11.000
|
$10.150
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
4,652.000
|
$3.000
|
$3.450
|
$5.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
4,652.000
|
$0.600
|
$0.616
|
$0.510
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
18,885.000
|
$5.000
|
$6.000
|
$6.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
18,885.000
|
$1.300
|
$0.550
|
$0.510
|
|
|
DRIVEWAYS (ACP)
|
SY
|
17,454.000
|
$70.000
|
$68.000
|
$82.000
|
|
|
DRIVEWAYS (CONC) (HES)
|
SY
|
1,990.000
|
$150.000
|
$190.000
|
$200.000
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
171,995.000
|
$0.300
|
$0.120
|
$0.150
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
7,950.000
|
$22.000
|
$23.000
|
$21.820
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
32.000
|
$1,900.000
|
$2,300.000
|
$1,889.380
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
3.000
|
$1,075.000
|
$1,150.000
|
$1,064.440
|
|
|
MTL BM GD FEN TRANS (31"-28")
|
EA
|
6.000
|
$770.000
|
$900.000
|
$819.620
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
7,950.000
|
$5.500
|
$2.850
|
$2.660
|
|
|
REMOVE DOWNSTREAM ANCHOR TERMINAL
|
EA
|
2.000
|
$200.000
|
$90.000
|
$79.840
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
32.000
|
$215.000
|
$235.000
|
$212.890
|
|
|
CABLE BARRIER SYSTEM (TL-4)
|
LF
|
19,377.000
|
$17.000
|
$19.000
|
$20.000
|
|
|
CABLE BARRIER TERMINAL SECTION (TL-4)
|
EA
|
34.000
|
$4,700.000
|
$4,200.000
|
$4,500.000
|
|
|
REMOVE CABLE BARRIER
|
LF
|
26,875.000
|
$17.000
|
$5.750
|
$5.000
|
|
|
REMOVE CABLE BARRIER TERMINAL SECTION
|
EA
|
38.000
|
$1,200.000
|
$575.000
|
$500.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
37.000
|
$3,000.000
|
$3,200.000
|
$2,953.810
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
38.000
|
$300.000
|
$285.000
|
$266.110
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
18.000
|
$350.000
|
$290.000
|
$239.900
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
18.750
|
$30.000
|
$40.000
|
$33.330
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
1,392.500
|
$40.000
|
$33.000
|
$33.330
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
198.000
|
$730.000
|
$725.000
|
$585.860
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
|
EA
|
30.000
|
$900.000
|
$825.000
|
$909.090
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
63.000
|
$845.000
|
$1,100.000
|
$656.570
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
3.000
|
$1,180.000
|
$1,075.000
|
$808.080
|
|
|
IN SM RD SN SUP&AM TY10BWG(2)SA(P-EXAL)
|
EA
|
5.000
|
$2,000.000
|
$1,900.000
|
$1,717.170
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
19.000
|
$1,125.000
|
$1,250.000
|
$909.090
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
16.000
|
$1,100.000
|
$1,250.000
|
$909.090
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
|
EA
|
1.000
|
$1,200.000
|
$1,500.000
|
$1,010.100
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
|
EA
|
8.000
|
$1,400.000
|
$1,500.000
|
$1,010.100
|
|
|
IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL)
|
EA
|
1.000
|
$2,700.000
|
$2,700.000
|
$1,767.680
|
|
|
REMOVE LRSA
|
EA
|
7.000
|
$1,300.000
|
$3,350.000
|
$959.600
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
68.000
|
$28.000
|
$17.000
|
$6.850
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
|
EA
|
66.000
|
$28.000
|
$17.000
|
$6.850
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
71.000
|
$28.000
|
$31.000
|
$21.320
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
|
EA
|
46.000
|
$28.000
|
$31.000
|
$21.320
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
|
EA
|
182.000
|
$95.000
|
$51.000
|
$60.610
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(YFLX)GND
|
EA
|
32.000
|
$120.000
|
$51.000
|
$60.610
|
|
|
INSTL DEL ASSM (D-DW)SZ 1(WFLX)GND
|
EA
|
12.000
|
$120.000
|
$57.000
|
$60.610
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
113.000
|
$70.000
|
$62.000
|
$60.610
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
|
LF
|
19,934.000
|
$0.500
|
$0.700
|
$0.570
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
231,006.000
|
$0.500
|
$0.590
|
$0.500
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
21,338.000
|
$0.550
|
$1.050
|
$0.750
|
|
|
WK ZN PAV MRK NON-REMOV (W)(ARROW)
|
EA
|
45.000
|
$120.000
|
$210.000
|
$129.240
|
|
|
WK ZN PAV MRK NON-REMOV(W)(WORD)
|
EA
|
45.000
|
$120.000
|
$245.000
|
$170.600
|
|
|
WK ZN PAV MRK NON-REMOV(W)36"(YLD TRI)
|
EA
|
10.000
|
$25.000
|
$90.000
|
$74.440
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
225,605.000
|
$0.500
|
$0.590
|
$0.500
|
|
|
WK ZN PAV MRK REMOV (W)6"(BRK)
|
LF
|
803.000
|
$0.800
|
$1.300
|
$2.580
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
13,324.000
|
$0.500
|
$1.300
|
$1.600
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
13,014.000
|
$0.800
|
$1.300
|
$1.600
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
6,387.000
|
$1.500
|
$1.200
|
$1.240
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
22,975.000
|
$1.250
|
$1.550
|
$1.240
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
1,401.000
|
$3.500
|
$6.000
|
$4.650
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
1,406.000
|
$8.000
|
$10.350
|
$8.270
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
72.000
|
$155.000
|
$210.000
|
$162.330
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
72.000
|
$170.000
|
$250.000
|
$193.340
|
|
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
|
EA
|
5.000
|
$75.000
|
$86.000
|
$129.240
|
|
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
|
LF
|
6,990.000
|
$6.000
|
$11.000
|
$7.550
|
|
REFL PAV MRK TY II (W) 6" (SLD)
|
LF
|
86,004.000
|
$0.300
|
$0.330
|
$0.410
|
|
REFL PAV MRK TY II (Y) 6" (SLD)
|
LF
|
86,004.000
|
$0.400
|
$0.330
|
$0.410
|
|
|
PAVEMENT SEALER 6"
|
LF
|
20,640.000
|
$0.300
|
$0.280
|
$0.260
|
|
|
PAVEMENT SEALER 8"
|
LF
|
961.000
|
$0.500
|
$0.420
|
$0.470
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
2.000
|
$30.000
|
$40.000
|
$46.530
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
2.000
|
$30.000
|
$50.000
|
$59.970
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
29,027.000
|
$0.800
|
$1.140
|
$0.860
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
119,329.000
|
$0.800
|
$1.040
|
$0.780
|
|
|
REF PROF PAV MRK TY I(Y)6"(SLD)(100MIL)
|
LF
|
117,058.000
|
$0.800
|
$1.650
|
$1.270
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
269.000
|
$5.000
|
$5.950
|
$4.910
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
2,612.000
|
$5.000
|
$5.950
|
$4.650
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
181,705.000
|
$0.500
|
$0.500
|
$0.470
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
300,550.000
|
$0.500
|
$0.500
|
$0.620
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
25,995.000
|
$1.000
|
$1.000
|
$0.930
|
|
|
ELIM EXT PAV MRK & MRKS (12")
|
LF
|
891.000
|
$1.500
|
$2.550
|
$2.330
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
80.000
|
$4.000
|
$5.000
|
$4.140
|
|
|
ELIM EXT PAV MRK & MRKS (36")(YLD TRI)
|
EA
|
10.000
|
$20.000
|
$51.000
|
$33.090
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
20,640.000
|
$0.200
|
$0.022
|
$0.160
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
961.000
|
$0.500
|
$0.100
|
$0.250
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
2.000
|
$25.000
|
$19.000
|
$31.020
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
2.000
|
$25.000
|
$21.000
|
$88.920
|
|
|
FULL - WIDTH MOWING
|
CYC
|
6.000
|
$8,000.000
|
$3,075.000
|
$4,800.000
|
|
|
CAM (ASPHALT) PG(76-22)
|
TON
|
1,163.000
|
$200.000
|
$230.000
|
$280.000
|
|
|
CAM (AGGREGATE)
|
TON
|
14,456.000
|
$200.000
|
$230.000
|
$280.000
|
|
|
RUBBILIZING EXISTING CONCRETE PAVEMENT
|
SY
|
194,574.000
|
$4.000
|
$3.350
|
$3.500
|
|
|
SP MIXES SP-C SAC-B PG64-22
|
TON
|
33,573.000
|
$110.000
|
$145.000
|
$150.000
|
|
|
SP MIXES SP-C SAC-B PG70-22
|
TON
|
66,389.000
|
$115.000
|
$152.000
|
$156.000
|
|
|
TACK COAT
|
GAL
|
52,171.000
|
$3.750
|
$4.450
|
$0.300
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$15,000.000
|
$22,000.000
|
$20,818.610
|
|
|
TMA (STATIONARY)
|
DAY
|
330.000
|
$150.000
|
$300.000
|
$145.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
50.000
|
$200.000
|
$300.000
|
$490.420
|
|
Totals: |
$35,917,861.530
|
$36,849,199.792
|
$42,769,055.792
|