Show Job Controls
Bid Cobra

KAUFMAN US 175 (0197-04-080)

Items: 54

County: KAUFMAN
Length: N/A
Highway: US 175
District: DALLAS
Control Number: 0197-04-080
DBE Goal: N/A
Project: NH 2019(007)
Guaranty: N/A
Time: 142 WORKING DAYS
Engineer's Estimate: $6,706,876.10
Date: 09/06/2018 (7 years ago)
Contract Number: N/A
Type: MILL, OVERLAY & MRKINGS; BRIDGE RAIL REPLACE
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (6)
E
Engineer's Estimate
$6,706,876.10
$6,161,838.27
Over/Under Est: -8.13% -$545,037.83
Over/Under Est: -6.07% -$407,280.88
Amt Left: 2.24% $137,756.95
$6,956,376.26
Over/Under Est: 3.72% $249,500.16
Amt Left: 12.89% $794,537.99
Delta: -10.43% -$656,781.04
Over/Under Est: 4.34% $291,208.10
Amt Left: 13.57% $836,245.93
Delta: -0.60% -$41,707.94
Over/Under Est: 9.96% $668,233.82
Amt Left: 19.69% $1,213,271.65
Delta: -5.39% -$377,025.72
Over/Under Est: 16.28% $1,091,861.64
Amt Left: 26.57% $1,636,899.47
Delta: -5.74% -$423,627.82

Bid Items & Bid Tabulations

54 Total 0 of 54
KAUFMAN  |  US 175  |  DALLAS  |  0197-04-080  |  09/06/2018  |  $6,706,876.10  |  NH 2019(007)  |  MILL, OVERLAY & MRKINGS; BRIDGE RAIL...  |  142 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
OLDCASTLE MATERIALS TEXAS, INC.
AUSTIN BRIDGE & ROAD SERVICES, LP
A. L. HELMCAMP, INC.
HERITAGE ASPHALT COMPANY LLC
PEACHTREE CONSTRUCTION, LTD.
EAST TEXAS BRIDGE, INC.
BACKFILL (TY A OR B)
STA 551.000 $150.000 $172.000 $90.000 $100.000 $175.000 $290.000 $500.000
FOG SEAL (MS-2)
GAL 26,655.000 $3.000 $3.150 $3.190 $3.000 $4.000 $4.400 $4.000
SUPERPAVE MIXTURES SP-C SAC-A PG64-22
TON 41,628.000 $82.000 $78.000 $76.800 $91.000 $86.000 $88.500 $95.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
SY 9,211.000 $75.000 $61.000 $74.300 $80.000 $56.750 $76.500 $70.000
PLAN & TEXT ASPH CONC PAV(0" TO 2")
SY 367,092.000 $1.400 $1.740 $1.390 $1.000 $2.250 $1.950 $2.000
PLAN & TEXT ASPH CONC PAV (2" TO 7")
SY 2,892.000 $8.000 $3.750 $7.400 $7.000 $3.750 $4.100 $6.000
PAV JT UNDERSEAL (24")
LF 2,352.000 $21.000 $30.000 $16.000 $15.000 $29.000 $60.000 $25.000
FULL-DEPTH REPAIR CPCD (9") HES
SY 520.000 $300.000 $335.000 $299.000 $360.000 $200.000 $310.000 $200.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 248.000 $234.000 $72.000 $190.000 $175.000 $200.000 $200.000 $180.000
RESIZING AND SEALING JOINTS
LF 2,352.000 $45.000 $23.000 $23.000 $23.000 $30.000 $31.000 $20.000
RETROFIT RAIL (TY T221)
LF 347.000 $150.000 $215.000 $145.000 $200.000 $200.000 $250.000 $175.000
MOBILIZATION
LS 1.000 $650,000.000 $356,835.000 $630,000.000 $595,000.000 $500,000.000 $455,000.000 $600,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $10,500.000 $5,200.000 $5,000.000 $10,000.000 $8,000.000 $7,500.000 $8,000.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 500.000 $3.000 $4.250 $4.250 $7.000 $5.000 $4.000 $15.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 500.000 $0.700 $0.650 $0.650 $2.000 $2.000 $1.100 $1.000
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 120.000 $30.000 $98.000 $14.250 $100.000 $40.000 $110.000 $150.000
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 420.000 $6.700 $9.450 $10.000 $30.000 $9.000 $25.000 $10.000
PORT CTB (STKPL)(F-SHAPE)(TY 1)
LF 150.000 $8.500 $22.000 $12.000 $37.000 $24.000 $35.000 $20.000
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 120.000 $6.700 $27.000 $15.000 $37.000 $30.000 $35.000 $20.000
RUMBLE STRIPS (SHOULDER)
LF 208,864.000 $0.140 $0.061 $0.060 $0.150 $0.100 $0.150 $0.400
MTL W-BEAM GD FEN (TIM POST)
LF 11,137.500 $18.000 $18.500 $18.000 $20.000 $25.000 $20.000 $22.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 16.000 $1,815.000 $1,500.000 $1,910.000 $1,600.000 $1,500.000 $1,600.000 $1,800.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 36.000 $1,300.000 $1,050.000 $1,000.000 $1,100.000 $1,300.000 $1,100.000 $1,400.000
MTL BM GD FEN TRANS (THRIE-BEAM)(OPT1)
EA 28.000 $2,850.000 $1,825.000 $1,775.000 $1,900.000 $1,900.000 $1,900.000 $2,100.000
MTL BM GD FEN TRANS (31"-28")
EA 13.000 $1,450.000 $460.000 $450.000 $500.000 $1,800.000 $500.000 $700.000
REMOVE METAL BEAM GUARD FENCE
LF 12,000.000 $2.450 $1.520 $1.500 $1.700 $2.500 $1.600 $3.000
REMOVE TERMINAL ANCHOR SECTION
EA 32.000 $205.000 $105.000 $100.000 $110.000 $225.000 $110.000 $300.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 6.000 $136.000 $265.000 $500.000 $330.000 $225.000 $1,600.000 $300.000
GUARDRAIL END TREATMENT (INSTALL)
EA 39.000 $2,400.000 $2,550.000 $2,475.000 $2,700.000 $2,500.000 $2,700.000 $2,800.000
GUARDRAIL END TREATMENT (REMOVE)
EA 41.000 $300.000 $235.000 $225.000 $240.000 $550.000 $250.000 $500.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000 $1,830.000 $1,400.000 $1,350.000 $1,400.000 $2,900.000 $1,500.000 $4,000.000
CRASH CUSH ATTEN (REMOVE)
EA 1.000 $1,060.000 $725.000 $700.000 $1,000.000 $1,100.000 $750.000 $1,500.000
INSTL OM ASSM (OM-3L)(FLX)GND
EA 38.000 $75.000 $172.000 $165.000 $175.000 $300.000 $180.000 $350.000
INSTL OM ASSM (OM-3R)(FLX)GND
EA 36.000 $75.000 $172.000 $165.000 $175.000 $300.000 $180.000 $350.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 183.000 $22.000 $39.000 $38.000 $40.000 $25.000 $40.000 $30.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 183.000 $18.000 $39.000 $38.000 $40.000 $25.000 $40.000 $30.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 2,415.000 $0.550 $1.030 $1.000 $2.000 $2.100 $2.300 $2.200
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 2,090.000 $0.550 $1.030 $1.000 $2.000 $2.100 $2.300 $2.200
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 6,766.000 $1.000 $1.000 $1.000 $0.600 $1.150 $2.000 $2.000
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 3,383.000 $1.000 $1.000 $1.000 $0.600 $1.150 $2.000 $2.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 14,915.000 $0.920 $0.780 $0.760 $0.900 $1.000 $1.000 $1.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 480.000 $6.000 $6.100 $6.000 $6.200 $6.000 $6.500 $6.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 42.000 $125.000 $104.000 $100.000 $110.000 $150.000 $150.000 $140.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 42.000 $150.000 $129.000 $125.000 $140.000 $175.000 $180.000 $160.000
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 27,610.000 $0.300 $0.450 $0.440 $0.400 $0.500 $0.550 $0.500
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 111,682.000 $0.190 $0.310 $0.300 $0.360 $0.450 $0.420 $0.400
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 111,682.000 $0.190 $0.310 $0.300 $0.360 $0.450 $0.420 $0.400
REFL PAV MRKR TY II-C-R
EA 2,121.000 $3.250 $3.250 $3.150 $4.000 $4.000 $3.800 $4.000
ELIM EXT PAV MRK & MRKS (4")
LF 4,862.000 $0.450 $1.050 $1.000 $0.800 $0.550 $0.550 $0.550
PAV SURF PREP FOR MRK (4")
LF 4,862.000 $0.040 $0.210 $0.200 $0.260 $0.150 $0.120 $0.120
FULL - WIDTH MOWING
CYC 3.000 $1,550.000 $1,200.000 $2,885.000 $3,500.000 $1,500.000 $25,000.000 $3,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $9,500.000 $5,274.423 $9,000.000 $15,000.000 $15,000.000 $12,500.000 $20,000.000
TMA (STATIONARY)
EA 2.000 $12,500.000 $22,209.625 $22,925.000 $15,000.000 $10,000.000 $22,500.000 $40,000.000
TMA (MOBILE OPERATION)
HR 144.000 $30.000 $47.118 $71.000 $45.000 $25.000 $55.000 $50.000
Totals: $6,706,876.100 $6,161,838.278 $6,299,595.220 $6,956,376.260 $6,998,084.200 $7,375,109.920 $7,798,737.740