KAUFMAN US 175 (0197-03-078)

Items: 210

County: KAUFMAN
Length: N/A
Highway: US 175
District: DALLAS
Control Number: 0197-03-078
DBE Goal: N/A
Project: F 2023(704)
Guaranty: N/A
Time: 0 X
Engineer's Estimate: $57,882,764.44
Date: 06/27/2023 (2 years ago)
Contract Number: N/A
Type: INTERCHANGE IMPROVEMENT
Mail/Deliver Bids To: N/A
LANE SELMAN
NICHOLAS WADLINGTON
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$57,882,764.44
$60,049,998.99
Over/Under Est: 3.74% $2,167,234.55
Over/Under Est: 7.84% $4,537,462.56
Amt Left: 3.95% $2,370,228.01
Subcontractor Percentage Amount
PEACHTREE CONSTRUCTION, LTD. 12.06% $6,917,632.38
Q. ROBERTS TRUCKING INCORPORATED 8.82% $5,059,163.98
ROAD SOLUTIONS L.L.C. 0.91% $521,977.24
AARON CONCRETE CONTRACTORS, LLC 0.75% $430,201.02
COWBOY TRUCKING 0.70% $401,520.95
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. 0.65% $372,840.88
WYLIE DRILLING & DRAINAGE, INC. 0.64% $367,104.87
STRIPE-A-ZONE, LLC 0.59% $338,424.80
TRAFFIC HIGHWAY MAINTENANCE, LLC 0.59% $338,424.80
FORTSON CONTRACTING, INC. 0.27% $154,872.37
A BROTHERS MILLING, LLC 0.26% $149,136.35
USA SWPPP INSPECTIONS, INC.DBA USA EROSION 0.26% $149,136.35
CIRCLE H BORING, LLC 0.13% $74,568.18
J.H. PAINTING COMPANY 0.12% $68,832.16
AWP SAFETY 0.12% $68,832.16
PRIMATE CONSTRUCTION, LP 0.06% $34,416.08
DALLAS LITE AND BARRICADE, INC. 0.06% $34,416.08
ALPHA TESTING, INC. 0.06% $34,416.08
NEXT GENERATION CONSTRUCTION & ENVIRONMENTAL, LLC 0.05% $28,680.07
TORO BRAVO CONSTRUCTION, LLC 0.03% $17,208.04
STEWART RANCH SERVICES LLC 0.03% $17,208.04
DUSTROL, INC. 0.02% $11,472.03
AAA DRILLING FOUNDATION COMPANY, INC. 0.02% $11,472.03
WEST TEXAS ROCK RESOURCES, LLC 0.02% $11,472.03
MIDWAY STRIPING & SEALCOATING 0.01% $5,736.01
FC TRAFFIC CONTROL, INC. 0.01% $5,736.01
TEX OP CONSTRUCTION, LP 0.01% $5,736.01
DFW REBAR, INC. 0.00% $0.00
Total: 27.25% $15,630,637.00

Bid Items & Bid Tabulations

210 Total 0 of 210
KAUFMAN  |  US 175  |  DALLAS  |  0197-03-078  |  06/27/2023  |  $57,882,764.44  |  F 2023(704)  |  INTERCHANGE IMPRV  |  0 X
Item Code
Description
Unit
Quantity
Engineer's Estimate
GRANITE CONSTRUCTION COMPANY
ZACHRY CONSTRUCTION CORPORATION
PREPARING ROW
STA 120.620 $35,841.000 $45,000.000 $35,653.020
REMOVING CONC (RIPRAP)
SY 4,138.000 $24.000 $5.000 $9.000
REMOVING CONC (DRIVEWAYS)
SY 326.000 $20.000 $9.000 $10.000
REMOVING CONCRETE(MOW STRIP)
LF 50.000 $20.000 $1.100 $30.000
REMOVING STAB BASE AND ASPH PAV (2"-6")
SY 347.000 $6.500 $12.000 $18.000
REMOVING STAB BASE & ASPH PAV(12"-27")
SY 58,358.000 $9.000 $3.000 $8.000
EXCAVATION (ROADWAY)
CY 121,240.000 $16.000 $7.000 $10.000
EMBANKMENT (FINAL) (DENS CONT) (TY C1)
CY 310,137.000 $18.000 $42.150 $19.000
EMBANKMENT (FINAL) (DENS CONT) (TY C2)
CY 28,159.000 $35.000 $26.000 $29.000
BACKFILL (TY A OR B)
STA 22.900 $180.000 $900.000 $2,500.000
COMPOST MANUF TOPSOIL (4")
SY 165,280.000 $1.600 $1.020 $2.600
BLOCK SODDING
SY 27,007.000 $4.350 $5.080 $5.000
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 138,273.000 $0.240 $0.170 $0.150
DRILL SEED (TEMP)(WARM OR COOL)
SY 165,280.000 $0.320 $0.110 $0.120
VEGETATIVE WATERING
MG 49,180.000 $11.000 $26.210 $24.000
SOIL RETENTION BLANKETS (CL 1) (TY A)
SY 2,967.000 $2.000 $2.030 $2.500
PROOF ROLLING
HR 4.000 $120.000 $94.240 $800.000
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
CY 19,646.000 $80.000 $52.000 $95.000
FL BS (CMP IN PLACE) (TY D GR 1-2)(10")
SY 11,640.000 $17.000 $17.000 $24.000
FL BS (CMP IN PLC)(TY D GR1-2)(12")
SY 100,554.000 $25.000 $19.000 $30.000
LIME (HYDRATED LIME (SLURRY))
TON 3,869.000 $300.000 $325.000 $305.000
LIME TRT (EXST MATL) (12")
SY 100,554.000 $6.000 $5.000 $8.000
LIME TRT (EXST MATL)(8")
SY 11,640.000 $5.000 $4.080 $7.500
PRIME COAT (MC-30)
GAL 24,551.000 $6.200 $5.600 $5.500
PLANE ASPH CONC PAV(0" TO 1")
SY 41,386.000 $2.500 $0.990 $1.000
CEM STABIL BKFL
CY 320.000 $275.000 $181.250 $125.000
TRENCH EXCAVATION PROTECTION
LF 5,260.000 $5.000 $2.500 $5.000
TEMPORARY SPL SHORING
SF 37,395.000 $40.000 $1.000 $10.000
DRILL SHAFT (36 IN)
LF 3,094.000 $200.000 $149.120 $190.000
DRILL SHAFT (SIGN MTS) (24 IN)
LF 38.000 $350.000 $273.100 $280.000
DRILL SHAFT (SIGN MTS) (48 IN)
LF 67.000 $830.000 $664.970 $670.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 48.000 $300.000 $329.950 $333.000
CL C CONC (ABUT)(HPC)
CY 116.800 $900.000 $1,500.000 $1,200.000
CL C CONC (CAP)(HPC)
CY 101.600 $1,500.000 $1,500.000 $1,650.000
CL C CONC (COLUMN)(HPC)
CY 78.400 $1,800.000 $2,500.000 $1,700.000
REINF CONC SLAB (HPC)
SF 43,500.000 $22.000 $24.000 $23.000
APPROACH SLAB
CY 188.000 $640.000 $476.360 $650.000
RETAINING WALL (MSE)
SF 116,064.000 $70.000 $50.000 $109.000
RETAINING WALL (TEMP WALL)
SF 53,681.000 $27.000 $15.000 $23.000
PRESTR CONC GIRDER (TX54)
LF 5,976.160 $230.000 $210.000 $181.000
RIPRAP (CONC)(4 IN)
CY 608.000 $500.000 $336.770 $525.000
RIPRAP (CONC)(5 IN)
CY 444.000 $550.000 $372.750 $575.000
RIPRAP (CONC)(CL B)
CY 2.100 $505.000 $731.840 $2,500.000
RIPRAP (CONC)(CL B)(RR8&RR9)
CY 152.200 $625.000 $521.830 $575.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 2,072.000 $165.000 $146.490 $125.000
RIPRAP (MOW STRIP)(4 IN)
CY 180.000 $460.000 $535.030 $800.000
RAIL (TY SSTR)
LF 6,049.000 $50.000 $56.740 $65.000
RAIL (TY SSTR)(HPC)
LF 1,560.000 $76.000 $88.260 $68.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 224.000 $170.000 $187.080 $212.000
CONC BOX CULV (7 FT X 5 FT)
LF 125.000 $820.000 $1,000.000 $800.000
CONC BOX CULV (10 FT X 7 FT)
LF 489.000 $1,000.000 $2,000.000 $1,200.000
RC PIPE (CL III)(18 IN)
LF 280.000 $85.000 $72.000 $80.000
RC PIPE (CL III)(24 IN)
LF 5,076.000 $85.000 $120.000 $105.000
RC PIPE (CL III)(30 IN)
LF 283.000 $105.000 $140.000 $150.000
RC PIPE (CL III)(36 IN)
LF 933.000 $170.000 $180.000 $200.000
MANH (COMPL)(PRM)(60IN)
EA 2.000 $6,600.000 $7,012.600 $6,500.000
INLET (COMPL)(PCO)(3FT)(LEFT)
EA 2.000 $7,600.000 $4,978.300 $6,600.000
INLET (COMPL)(PCO)(3FT)(RIGHT)
EA 2.000 $7,600.000 $4,532.300 $6,300.000
INLET (COMPL)(PSL)(SL)(3FTX3FT)
EA 3.000 $4,500.000 $3,463.590 $4,500.000
INLET (COMPL)(PSL)(RG)(3FTX3FT)
EA 18.000 $5,500.000 $4,795.250 $5,300.000
INLET (COMPL)(PSL)(RG)(4FTX4FT)
EA 5.000 $4,800.000 $5,280.270 $5,700.000
INLET (COMPL)(PSL)(FG)(4FTX4FT-4FTX4FT)
EA 1.000 $8,000.000 $7,125.750 $6,800.000
INLET (COMPL)(PSL)(FG)(3FTX5FT-3FTX5FT)
EA 4.000 $8,000.000 $6,155.720 $6,600.000
INLET (COMPL)(RWI)(TY II)
EA 22.000 $7,100.000 $9,414.120 $14,000.000
WINGWALL (FW - 0) (HW=6 FT)
EA 1.000 $13,000.000 $20,000.000 $14,500.000
WINGWALL (FW - S) (HW=8 FT)
EA 2.000 $15,000.000 $25,000.000 $45,000.000
WINGWALL (PW - 1) (HW=6 FT)
EA 1.000 $23,000.000 $24,000.000 $26,000.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 12.000 $825.000 $2,306.900 $2,000.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 6.000 $1,650.000 $2,625.960 $2,000.000
SET (TY II) (36 IN) (RCP) (4: 1) (C)
EA 2.000 $3,150.000 $5,185.550 $2,600.000
JACK BOR OR TUN PIPE(18 IN)(RC)(CL III)
LF 184.000 $1,220.000 $549.550 $1,100.000
ADJUSTING INLETS
EA 1.000 $5,200.000 $1,469.160 $3,000.000
REMOV STR (INLET)
EA 12.000 $820.000 $450.000 $2,200.000
REMOV STR (SET)
EA 12.000 $510.000 $450.000 $800.000
REMOV STR (WINGWALL)
EA 2.000 $2,000.000 $800.000 $1,200.000
REMOV STR (PIPE)
LF 314.000 $25.000 $12.000 $50.000
REMOV STR (BOX CULVERT)
LF 55.000 $60.000 $100.000 $70.000
MOBILIZATION
LS 1.000 $4,524,201.000 $5,383,187.400 $5,000,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 35.000 $20,000.000 $4,000.000 $18,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 1,057.000 $35.000 $40.000 $44.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 305.000 $50.000 $60.000 $100.000
ROCK FILTER DAMS (REMOVE)
LF 1,362.000 $12.250 $10.150 $10.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 813.000 $23.000 $30.000 $28.500
CONSTRUCTION EXITS (REMOVE)
SY 813.000 $9.000 $10.000 $9.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 10,729.000 $2.800 $4.000 $2.650
TEMP SEDMT CONT FENCE (REMOVE)
LF 10,729.000 $0.950 $0.500 $0.750
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 1,188.000 $5.000 $5.000 $3.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,188.000 $2.000 $0.500 $0.850
CONSTRUCTING DETOURS
SY 10,991.000 $120.000 $150.000 $107.000
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 12,710.000 $40.000 $17.000 $35.000
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 18,810.000 $20.000 $4.000 $7.000
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 12,710.000 $15.000 $6.000 $11.000
PERM CTB (SGL SLOPE) (TY 1) (42 )
LF 3,475.000 $75.000 $78.540 $80.000
PERM CTB (TRAN SSCB TO SSTR) (MOD)
LF 20.000 $275.000 $410.080 $325.000
CONC CURB & GUTTER (TY II)
LF 4,552.000 $50.000 $44.070 $45.000
DRIVEWAYS (CONC)
SY 337.000 $100.000 $94.690 $130.000
DRIVEWAYS (ACP)
SY 619.000 $65.000 $185.000 $175.000
CURB RAMPS (TY 1)
EA 4.000 $2,400.000 $1,571.410 $2,200.000
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 33,634.000 $0.400 $0.240 $0.160
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 10,098.000 $0.400 $0.240 $0.160
MTL W-BEAM GD FEN (TIM POST)
LF 5,375.000 $22.000 $20.710 $20.500
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,250.000 $1,792.930 $1,775.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 3.000 $1,400.000 $1,010.100 $1,000.000
REMOVE METAL BEAM GUARD FENCE
LF 6,872.000 $2.800 $2.530 $2.500
GUARDRAIL END TREATMENT (INSTALL)
EA 6.000 $2,900.000 $2,803.030 $2,775.000
GUARDRAIL END TREATMENT (REMOVE)
EA 5.000 $265.000 $252.530 $250.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 17.000 $1,275.000 $813.220 $1,450.000
CRASH CUSH ATTEN (REMOVE)
EA 15.000 $900.000 $880.280 $850.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 2.000 $25,500.000 $24,718.200 $26,700.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 15.000 $8,300.000 $7,692.700 $7,750.000
RELOCATE RD IL ASM (TRANS-BASE)
EA 4.000 $1,825.000 $1,807.110 $1,815.600
REMOVE RD IL ASM (TRANS-BASE)
EA 8.000 $590.000 $913.710 $918.000
IN RD IL (U/P) (TY 1) (150W EQ) LED
EA 8.000 $1,650.000 $1,918.780 $1,927.800
IN RD IL (TY SA) 40B-8 (250W EQ) LED
EA 8.000 $5,200.000 $5,360.410 $5,385.600
IN RD IL (TY SA) 40T-8 (250W EQ) LED
EA 2.000 $4,600.000 $5,441.630 $5,467.200
CONDT (PVC) (SCH 40) (1")
LF 132.000 $13.500 $10.040 $10.090
CONDT (PVC) (SCH 40) (2")
LF 2,361.000 $15.000 $10.300 $10.350
CONDT (PVC) (SCH 80) (2") (BORE)
LF 659.000 $30.000 $29.950 $30.090
CONDT (RM) (1")
LF 32.000 $42.000 $45.690 $45.900
ELEC CONDR (NO.12) BARE
LF 108.000 $1.650 $1.570 $1.580
ELEC CONDR (NO.12) INSULATED
LF 216.000 $1.950 $1.710 $1.710
ELEC CONDR (NO.8) BARE
LF 4,035.000 $2.000 $1.880 $1.890
ELEC CONDR (NO.8) INSULATED
LF 8,070.000 $2.100 $1.960 $1.970
GROUND BOX TY A (122311)
EA 4.000 $1,200.000 $1,013.200 $1,017.960
GROUND BOX TY A (122311)W/APRON
EA 11.000 $1,600.000 $1,111.680 $1,116.900
REMOVE GROUND BOX
EA 4.000 $440.000 $304.570 $306.000
ELC SRV TY A 240/480 060(NS)SS(E)GC(O)
EA 1.000 $14,000.000 $10,131.980 $10,179.600
ALUMINUM SIGNS (TY G)
SF 160.000 $49.000 $38.580 $38.760
ALUMINUM SIGNS (TY O)
SF 466.000 $38.000 $37.560 $37.740
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 45.000 $800.000 $662.500 $770.100
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 1.000 $800.000 $801.450 $867.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 16.000 $940.000 $831.250 $887.400
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 5.000 $1,000.000 $753.750 $805.290
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
EA 4.000 $2,000.000 $915.250 $1,017.960
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 2.000 $1,650.000 $835.000 $1,242.360
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 2.000 $1,350.000 $926.250 $1,428.000
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
EA 3.000 $1,800.000 $998.250 $1,479.000
IN SM RD SN SUP&AM TYS80(1)SA(U-2EXT)
EA 2.000 $1,450.000 $1,032.250 $1,545.300
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 1.000 $1,550.000 $1,469.600 $1,476.510
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 2.000 $3,200.000 $2,903.560 $2,917.200
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
EA 2.000 $4,500.000 $3,197.970 $3,213.000
RELOCATE SM RD SN SUP&AM(RAIL MOUNT)
EA 1.000 $7,550.000 $5,949.240 $5,977.200
REMOVE SM RD SN SUP&AM
EA 6.000 $150.000 $115.250 $158.100
INSTALL LRSS (STRUCT STEEL)
LB 1,864.000 $7.000 $8.120 $8.160
REMOVE LRSA
EA 1.000 $2,230.000 $1,776.650 $1,785.000
RELOCATE LRSS (SIGN ONLY)
EA 1.000 $810.000 $913.710 $918.000
INS OH SN SUP(30 FT CANT)
EA 3.000 $36,000.000 $46,081.220 $46,297.800
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 70.000 $16.000 $10.500 $27.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
EA 78.000 $9.500 $11.500 $28.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BR)
EA 8.000 $40.000 $28.750 $46.000
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 22.000 $80.000 $70.400 $69.000
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 950.000 $2.200 $1.040 $1.000
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 8,296.000 $0.660 $0.490 $0.470
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 8,462.000 $1.100 $0.490 $0.470
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 118.000 $6.150 $5.190 $5.000
WK ZN PAV MRK REMOV (REFL) TY II-C-R
EA 250.000 $5.250 $5.190 $5.000
WK ZN PAV MRK REMOV (W)6"(BRK)
LF 4,230.000 $1.300 $1.510 $1.450
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 18,265.000 $1.100 $1.420 $1.370
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 2,005.000 $1.200 $2.340 $2.250
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 28,867.000 $1.150 $1.420 $1.370
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 17,764.000 $1.100 $1.300 $1.250
REFL PAV MRK TY I (W)12"(LNDP)(100MIL)
LF 1,410.000 $3.100 $3.890 $3.750
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 1,200.000 $3.700 $4.150 $4.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 248.000 $9.250 $8.310 $8.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 23.000 $140.000 $166.130 $160.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 27.000 $180.000 $192.090 $185.000
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
EA 8.000 $45.000 $88.260 $85.000
REFL PAV MRK TY II (W) 6" (BRK)
LF 2,600.000 $0.300 $0.420 $0.400
REFL PAV MRK TY II (W) 6" (SLD)
LF 12,818.000 $1.000 $0.360 $0.350
REFL PAV MRK TY II (W) 8" (SLD)
LF 4,233.000 $0.630 $0.570 $0.550
REFL PAV MRK TY II (W) 12" (LNDP)
LF 207.000 $2.300 $2.080 $2.000
REFL PAV MRK TY II (Y) 6" (SLD)
LF 14,054.000 $0.880 $0.360 $0.350
PAVEMENT SEALER 6"
LF 118,627.000 $0.250 $0.260 $0.250
PAVEMENT SEALER 8"
LF 17,764.000 $0.280 $0.450 $0.430
PAVEMENT SEALER 12"
LF 2,610.000 $1.250 $0.620 $0.600
PAVEMENT SEALER 24"
LF 248.000 $2.200 $1.560 $1.500
PAVEMENT SEALER (ARROW)
EA 23.000 $33.000 $41.530 $40.000
PAVEMENT SEALER (WORD)
EA 27.000 $45.000 $57.110 $55.000
PAVEMENT SEALER (UTURN ARROW)
EA 4.000 $50.000 $46.720 $45.000
PAVEMENT SEALER (YLD TRI)
EA 8.000 $7.000 $25.960 $25.000
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 7,290.000 $1.900 $0.860 $0.830
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 55,302.000 $1.000 $0.800 $0.770
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 56,035.000 $0.900 $0.800 $0.770
PREFAB PAV MRK TY C (W) (UTURN ARROW)
EA 4.000 $540.000 $425.710 $410.000
REFL PAV MRKR TY I-C
EA 101.000 $5.400 $5.190 $5.000
REFL PAV MRKR TY II-A-A
EA 610.000 $5.800 $5.190 $5.000
REFL PAV MRKR TY II-C-R
EA 912.000 $5.400 $5.190 $5.000
ELIM EXT PAV MRK & MRKS (4")
LF 26,044.000 $1.000 $0.520 $0.500
ELIM EXT PAV MRK & MRKS (6")
LF 1,930.000 $0.850 $0.520 $0.500
ELIM EXT PAV MRK & MRKS (8")
LF 685.000 $0.800 $1.040 $1.000
PAV SURF PREP FOR MRK (6")
LF 118,627.000 $0.170 $0.170 $0.160
PAV SURF PREP FOR MRK (8")
LF 17,764.000 $0.180 $0.270 $0.260
PAV SURF PREP FOR MRK (12")
LF 2,610.000 $0.630 $1.040 $1.000
PAV SURF PREP FOR MRK (24")
LF 248.000 $0.850 $2.020 $1.950
PAV SURF PREP FOR MRK (ARROW)
EA 23.000 $26.000 $34.260 $33.000
PAV SURF PREP FOR MRK (UTURN ARR)
EA 4.000 $31.000 $38.420 $37.000
PAV SURF PREP FOR MRK (WORD)
EA 27.000 $35.000 $48.800 $47.000
PAV SURF PREP FOR MRK (36")(YLD TRI)
EA 8.000 $7.500 $20.770 $20.000
FULL - WIDTH MOWING
CYC 3.000 $2,500.000 $2,400.000 $3,000.000
NO. OF WORKING DAYS
$/D 5,000.000 $735.000 $630.000 $630.000
SP MIXES SP-B PG64-22
TON 23,672.000 $115.000 $126.000 $124.000
SP MIXES SP-C SAC-B PG64-22
TON 11,875.000 $120.000 $147.000 $145.000
SP MIXES SP-C SAC-A PG70-22
TON 5,272.000 $160.000 $154.000 $152.000
SP MIXES SP-D SAC-A PG70-22
TON 2,384.000 $125.000 $167.000 $165.000
TACK COAT
GAL 6,461.000 $5.500 $4.600 $4.550
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $13,000.000 $20,000.000 $15,000.000
CONDUIT (PREPARE)
LF 299.000 $4.400 $5.080 $5.100
GROUND BOX (PREPARE)
EA 5.000 $500.000 $421.320 $423.300
TMA (STATIONARY)
DAY 698.000 $225.000 $190.000 $185.000
TMA (MOBILE OPERATION)
HR 216.000 $93.000 $90.000 $90.000
Totals: $57,882,764.440 $60,049,999.000 $62,420,227.002