PREPARING ROW
|
STA
|
120.620
|
$35,841.000
|
$45,000.000
|
$35,653.020
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
4,138.000
|
$24.000
|
$5.000
|
$9.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
326.000
|
$20.000
|
$9.000
|
$10.000
|
|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
50.000
|
$20.000
|
$1.100
|
$30.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (2"-6")
|
SY
|
347.000
|
$6.500
|
$12.000
|
$18.000
|
|
|
REMOVING STAB BASE & ASPH PAV(12"-27")
|
SY
|
58,358.000
|
$9.000
|
$3.000
|
$8.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
121,240.000
|
$16.000
|
$7.000
|
$10.000
|
|
|
EMBANKMENT (FINAL) (DENS CONT) (TY C1)
|
CY
|
310,137.000
|
$18.000
|
$42.150
|
$19.000
|
|
|
EMBANKMENT (FINAL) (DENS CONT) (TY C2)
|
CY
|
28,159.000
|
$35.000
|
$26.000
|
$29.000
|
|
|
BACKFILL (TY A OR B)
|
STA
|
22.900
|
$180.000
|
$900.000
|
$2,500.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
165,280.000
|
$1.600
|
$1.020
|
$2.600
|
|
|
BLOCK SODDING
|
SY
|
27,007.000
|
$4.350
|
$5.080
|
$5.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
138,273.000
|
$0.240
|
$0.170
|
$0.150
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
165,280.000
|
$0.320
|
$0.110
|
$0.120
|
|
|
VEGETATIVE WATERING
|
MG
|
49,180.000
|
$11.000
|
$26.210
|
$24.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY A)
|
SY
|
2,967.000
|
$2.000
|
$2.030
|
$2.500
|
|
|
PROOF ROLLING
|
HR
|
4.000
|
$120.000
|
$94.240
|
$800.000
|
|
|
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
|
CY
|
19,646.000
|
$80.000
|
$52.000
|
$95.000
|
|
|
FL BS (CMP IN PLACE) (TY D GR 1-2)(10")
|
SY
|
11,640.000
|
$17.000
|
$17.000
|
$24.000
|
|
|
FL BS (CMP IN PLC)(TY D GR1-2)(12")
|
SY
|
100,554.000
|
$25.000
|
$19.000
|
$30.000
|
|
|
LIME (HYDRATED LIME (SLURRY))
|
TON
|
3,869.000
|
$300.000
|
$325.000
|
$305.000
|
|
|
LIME TRT (EXST MATL) (12")
|
SY
|
100,554.000
|
$6.000
|
$5.000
|
$8.000
|
|
|
LIME TRT (EXST MATL)(8")
|
SY
|
11,640.000
|
$5.000
|
$4.080
|
$7.500
|
|
|
PRIME COAT (MC-30)
|
GAL
|
24,551.000
|
$6.200
|
$5.600
|
$5.500
|
|
|
PLANE ASPH CONC PAV(0" TO 1")
|
SY
|
41,386.000
|
$2.500
|
$0.990
|
$1.000
|
|
|
CEM STABIL BKFL
|
CY
|
320.000
|
$275.000
|
$181.250
|
$125.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
5,260.000
|
$5.000
|
$2.500
|
$5.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
37,395.000
|
$40.000
|
$1.000
|
$10.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
3,094.000
|
$200.000
|
$149.120
|
$190.000
|
|
|
DRILL SHAFT (SIGN MTS) (24 IN)
|
LF
|
38.000
|
$350.000
|
$273.100
|
$280.000
|
|
|
DRILL SHAFT (SIGN MTS) (48 IN)
|
LF
|
67.000
|
$830.000
|
$664.970
|
$670.000
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
48.000
|
$300.000
|
$329.950
|
$333.000
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
116.800
|
$900.000
|
$1,500.000
|
$1,200.000
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
101.600
|
$1,500.000
|
$1,500.000
|
$1,650.000
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
78.400
|
$1,800.000
|
$2,500.000
|
$1,700.000
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
43,500.000
|
$22.000
|
$24.000
|
$23.000
|
|
|
APPROACH SLAB
|
CY
|
188.000
|
$640.000
|
$476.360
|
$650.000
|
|
|
RETAINING WALL (MSE)
|
SF
|
116,064.000
|
$70.000
|
$50.000
|
$109.000
|
|
|
RETAINING WALL (TEMP WALL)
|
SF
|
53,681.000
|
$27.000
|
$15.000
|
$23.000
|
|
|
PRESTR CONC GIRDER (TX54)
|
LF
|
5,976.160
|
$230.000
|
$210.000
|
$181.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
608.000
|
$500.000
|
$336.770
|
$525.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
444.000
|
$550.000
|
$372.750
|
$575.000
|
|
|
RIPRAP (CONC)(CL B)
|
CY
|
2.100
|
$505.000
|
$731.840
|
$2,500.000
|
|
|
RIPRAP (CONC)(CL B)(RR8&RR9)
|
CY
|
152.200
|
$625.000
|
$521.830
|
$575.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
2,072.000
|
$165.000
|
$146.490
|
$125.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
180.000
|
$460.000
|
$535.030
|
$800.000
|
|
|
RAIL (TY SSTR)
|
LF
|
6,049.000
|
$50.000
|
$56.740
|
$65.000
|
|
|
RAIL (TY SSTR)(HPC)
|
LF
|
1,560.000
|
$76.000
|
$88.260
|
$68.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
224.000
|
$170.000
|
$187.080
|
$212.000
|
|
|
CONC BOX CULV (7 FT X 5 FT)
|
LF
|
125.000
|
$820.000
|
$1,000.000
|
$800.000
|
|
|
CONC BOX CULV (10 FT X 7 FT)
|
LF
|
489.000
|
$1,000.000
|
$2,000.000
|
$1,200.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
280.000
|
$85.000
|
$72.000
|
$80.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
5,076.000
|
$85.000
|
$120.000
|
$105.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
283.000
|
$105.000
|
$140.000
|
$150.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
933.000
|
$170.000
|
$180.000
|
$200.000
|
|
|
MANH (COMPL)(PRM)(60IN)
|
EA
|
2.000
|
$6,600.000
|
$7,012.600
|
$6,500.000
|
|
|
INLET (COMPL)(PCO)(3FT)(LEFT)
|
EA
|
2.000
|
$7,600.000
|
$4,978.300
|
$6,600.000
|
|
|
INLET (COMPL)(PCO)(3FT)(RIGHT)
|
EA
|
2.000
|
$7,600.000
|
$4,532.300
|
$6,300.000
|
|
|
INLET (COMPL)(PSL)(SL)(3FTX3FT)
|
EA
|
3.000
|
$4,500.000
|
$3,463.590
|
$4,500.000
|
|
|
INLET (COMPL)(PSL)(RG)(3FTX3FT)
|
EA
|
18.000
|
$5,500.000
|
$4,795.250
|
$5,300.000
|
|
|
INLET (COMPL)(PSL)(RG)(4FTX4FT)
|
EA
|
5.000
|
$4,800.000
|
$5,280.270
|
$5,700.000
|
|
|
INLET (COMPL)(PSL)(FG)(4FTX4FT-4FTX4FT)
|
EA
|
1.000
|
$8,000.000
|
$7,125.750
|
$6,800.000
|
|
|
INLET (COMPL)(PSL)(FG)(3FTX5FT-3FTX5FT)
|
EA
|
4.000
|
$8,000.000
|
$6,155.720
|
$6,600.000
|
|
|
INLET (COMPL)(RWI)(TY II)
|
EA
|
22.000
|
$7,100.000
|
$9,414.120
|
$14,000.000
|
|
|
WINGWALL (FW - 0) (HW=6 FT)
|
EA
|
1.000
|
$13,000.000
|
$20,000.000
|
$14,500.000
|
|
|
WINGWALL (FW - S) (HW=8 FT)
|
EA
|
2.000
|
$15,000.000
|
$25,000.000
|
$45,000.000
|
|
|
WINGWALL (PW - 1) (HW=6 FT)
|
EA
|
1.000
|
$23,000.000
|
$24,000.000
|
$26,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
12.000
|
$825.000
|
$2,306.900
|
$2,000.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
6.000
|
$1,650.000
|
$2,625.960
|
$2,000.000
|
|
|
SET (TY II) (36 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$3,150.000
|
$5,185.550
|
$2,600.000
|
|
|
JACK BOR OR TUN PIPE(18 IN)(RC)(CL III)
|
LF
|
184.000
|
$1,220.000
|
$549.550
|
$1,100.000
|
|
|
ADJUSTING INLETS
|
EA
|
1.000
|
$5,200.000
|
$1,469.160
|
$3,000.000
|
|
|
REMOV STR (INLET)
|
EA
|
12.000
|
$820.000
|
$450.000
|
$2,200.000
|
|
|
REMOV STR (SET)
|
EA
|
12.000
|
$510.000
|
$450.000
|
$800.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
2.000
|
$2,000.000
|
$800.000
|
$1,200.000
|
|
|
REMOV STR (PIPE)
|
LF
|
314.000
|
$25.000
|
$12.000
|
$50.000
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
55.000
|
$60.000
|
$100.000
|
$70.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$4,524,201.000
|
$5,383,187.400
|
$5,000,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
35.000
|
$20,000.000
|
$4,000.000
|
$18,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
1,057.000
|
$35.000
|
$40.000
|
$44.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
305.000
|
$50.000
|
$60.000
|
$100.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
1,362.000
|
$12.250
|
$10.150
|
$10.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
813.000
|
$23.000
|
$30.000
|
$28.500
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
813.000
|
$9.000
|
$10.000
|
$9.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
10,729.000
|
$2.800
|
$4.000
|
$2.650
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
10,729.000
|
$0.950
|
$0.500
|
$0.750
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
1,188.000
|
$5.000
|
$5.000
|
$3.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,188.000
|
$2.000
|
$0.500
|
$0.850
|
|
|
CONSTRUCTING DETOURS
|
SY
|
10,991.000
|
$120.000
|
$150.000
|
$107.000
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
12,710.000
|
$40.000
|
$17.000
|
$35.000
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
18,810.000
|
$20.000
|
$4.000
|
$7.000
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
12,710.000
|
$15.000
|
$6.000
|
$11.000
|
|
|
PERM CTB (SGL SLOPE) (TY 1) (42 )
|
LF
|
3,475.000
|
$75.000
|
$78.540
|
$80.000
|
|
|
PERM CTB (TRAN SSCB TO SSTR) (MOD)
|
LF
|
20.000
|
$275.000
|
$410.080
|
$325.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
4,552.000
|
$50.000
|
$44.070
|
$45.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
337.000
|
$100.000
|
$94.690
|
$130.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
619.000
|
$65.000
|
$185.000
|
$175.000
|
|
|
CURB RAMPS (TY 1)
|
EA
|
4.000
|
$2,400.000
|
$1,571.410
|
$2,200.000
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
33,634.000
|
$0.400
|
$0.240
|
$0.160
|
|
|
RUMBLE STRIPS (CENTERLINE) ASPHALT
|
LF
|
10,098.000
|
$0.400
|
$0.240
|
$0.160
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
5,375.000
|
$22.000
|
$20.710
|
$20.500
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$2,250.000
|
$1,792.930
|
$1,775.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
3.000
|
$1,400.000
|
$1,010.100
|
$1,000.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
6,872.000
|
$2.800
|
$2.530
|
$2.500
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
6.000
|
$2,900.000
|
$2,803.030
|
$2,775.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
5.000
|
$265.000
|
$252.530
|
$250.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
17.000
|
$1,275.000
|
$813.220
|
$1,450.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
15.000
|
$900.000
|
$880.280
|
$850.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
2.000
|
$25,500.000
|
$24,718.200
|
$26,700.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
15.000
|
$8,300.000
|
$7,692.700
|
$7,750.000
|
|
|
RELOCATE RD IL ASM (TRANS-BASE)
|
EA
|
4.000
|
$1,825.000
|
$1,807.110
|
$1,815.600
|
|
|
REMOVE RD IL ASM (TRANS-BASE)
|
EA
|
8.000
|
$590.000
|
$913.710
|
$918.000
|
|
|
IN RD IL (U/P) (TY 1) (150W EQ) LED
|
EA
|
8.000
|
$1,650.000
|
$1,918.780
|
$1,927.800
|
|
|
IN RD IL (TY SA) 40B-8 (250W EQ) LED
|
EA
|
8.000
|
$5,200.000
|
$5,360.410
|
$5,385.600
|
|
|
IN RD IL (TY SA) 40T-8 (250W EQ) LED
|
EA
|
2.000
|
$4,600.000
|
$5,441.630
|
$5,467.200
|
|
|
CONDT (PVC) (SCH 40) (1")
|
LF
|
132.000
|
$13.500
|
$10.040
|
$10.090
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
2,361.000
|
$15.000
|
$10.300
|
$10.350
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
659.000
|
$30.000
|
$29.950
|
$30.090
|
|
|
CONDT (RM) (1")
|
LF
|
32.000
|
$42.000
|
$45.690
|
$45.900
|
|
|
ELEC CONDR (NO.12) BARE
|
LF
|
108.000
|
$1.650
|
$1.570
|
$1.580
|
|
|
ELEC CONDR (NO.12) INSULATED
|
LF
|
216.000
|
$1.950
|
$1.710
|
$1.710
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
4,035.000
|
$2.000
|
$1.880
|
$1.890
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
8,070.000
|
$2.100
|
$1.960
|
$1.970
|
|
|
GROUND BOX TY A (122311)
|
EA
|
4.000
|
$1,200.000
|
$1,013.200
|
$1,017.960
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
11.000
|
$1,600.000
|
$1,111.680
|
$1,116.900
|
|
|
REMOVE GROUND BOX
|
EA
|
4.000
|
$440.000
|
$304.570
|
$306.000
|
|
|
ELC SRV TY A 240/480 060(NS)SS(E)GC(O)
|
EA
|
1.000
|
$14,000.000
|
$10,131.980
|
$10,179.600
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
160.000
|
$49.000
|
$38.580
|
$38.760
|
|
|
ALUMINUM SIGNS (TY O)
|
SF
|
466.000
|
$38.000
|
$37.560
|
$37.740
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
45.000
|
$800.000
|
$662.500
|
$770.100
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
|
EA
|
1.000
|
$800.000
|
$801.450
|
$867.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
16.000
|
$940.000
|
$831.250
|
$887.400
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
5.000
|
$1,000.000
|
$753.750
|
$805.290
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
|
EA
|
4.000
|
$2,000.000
|
$915.250
|
$1,017.960
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
2.000
|
$1,650.000
|
$835.000
|
$1,242.360
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
2.000
|
$1,350.000
|
$926.250
|
$1,428.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
|
EA
|
3.000
|
$1,800.000
|
$998.250
|
$1,479.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-2EXT)
|
EA
|
2.000
|
$1,450.000
|
$1,032.250
|
$1,545.300
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
|
EA
|
1.000
|
$1,550.000
|
$1,469.600
|
$1,476.510
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
2.000
|
$3,200.000
|
$2,903.560
|
$2,917.200
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
|
EA
|
2.000
|
$4,500.000
|
$3,197.970
|
$3,213.000
|
|
|
RELOCATE SM RD SN SUP&AM(RAIL MOUNT)
|
EA
|
1.000
|
$7,550.000
|
$5,949.240
|
$5,977.200
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
6.000
|
$150.000
|
$115.250
|
$158.100
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
1,864.000
|
$7.000
|
$8.120
|
$8.160
|
|
|
REMOVE LRSA
|
EA
|
1.000
|
$2,230.000
|
$1,776.650
|
$1,785.000
|
|
|
RELOCATE LRSS (SIGN ONLY)
|
EA
|
1.000
|
$810.000
|
$913.710
|
$918.000
|
|
|
INS OH SN SUP(30 FT CANT)
|
EA
|
3.000
|
$36,000.000
|
$46,081.220
|
$46,297.800
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
70.000
|
$16.000
|
$10.500
|
$27.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
|
EA
|
78.000
|
$9.500
|
$11.500
|
$28.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BR)
|
EA
|
8.000
|
$40.000
|
$28.750
|
$46.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
22.000
|
$80.000
|
$70.400
|
$69.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
|
LF
|
950.000
|
$2.200
|
$1.040
|
$1.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
8,296.000
|
$0.660
|
$0.490
|
$0.470
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
8,462.000
|
$1.100
|
$0.490
|
$0.470
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
118.000
|
$6.150
|
$5.190
|
$5.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-C-R
|
EA
|
250.000
|
$5.250
|
$5.190
|
$5.000
|
|
|
WK ZN PAV MRK REMOV (W)6"(BRK)
|
LF
|
4,230.000
|
$1.300
|
$1.510
|
$1.450
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
18,265.000
|
$1.100
|
$1.420
|
$1.370
|
|
|
WK ZN PAV MRK REMOV (W)8"(SLD)
|
LF
|
2,005.000
|
$1.200
|
$2.340
|
$2.250
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
28,867.000
|
$1.150
|
$1.420
|
$1.370
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
17,764.000
|
$1.100
|
$1.300
|
$1.250
|
|
REFL PAV MRK TY I (W)12"(LNDP)(100MIL)
|
LF
|
1,410.000
|
$3.100
|
$3.890
|
$3.750
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
1,200.000
|
$3.700
|
$4.150
|
$4.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
248.000
|
$9.250
|
$8.310
|
$8.000
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
23.000
|
$140.000
|
$166.130
|
$160.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
27.000
|
$180.000
|
$192.090
|
$185.000
|
|
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
|
EA
|
8.000
|
$45.000
|
$88.260
|
$85.000
|
|
REFL PAV MRK TY II (W) 6" (BRK)
|
LF
|
2,600.000
|
$0.300
|
$0.420
|
$0.400
|
|
REFL PAV MRK TY II (W) 6" (SLD)
|
LF
|
12,818.000
|
$1.000
|
$0.360
|
$0.350
|
|
REFL PAV MRK TY II (W) 8" (SLD)
|
LF
|
4,233.000
|
$0.630
|
$0.570
|
$0.550
|
|
REFL PAV MRK TY II (W) 12" (LNDP)
|
LF
|
207.000
|
$2.300
|
$2.080
|
$2.000
|
|
REFL PAV MRK TY II (Y) 6" (SLD)
|
LF
|
14,054.000
|
$0.880
|
$0.360
|
$0.350
|
|
|
PAVEMENT SEALER 6"
|
LF
|
118,627.000
|
$0.250
|
$0.260
|
$0.250
|
|
|
PAVEMENT SEALER 8"
|
LF
|
17,764.000
|
$0.280
|
$0.450
|
$0.430
|
|
|
PAVEMENT SEALER 12"
|
LF
|
2,610.000
|
$1.250
|
$0.620
|
$0.600
|
|
|
PAVEMENT SEALER 24"
|
LF
|
248.000
|
$2.200
|
$1.560
|
$1.500
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
23.000
|
$33.000
|
$41.530
|
$40.000
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
27.000
|
$45.000
|
$57.110
|
$55.000
|
|
|
PAVEMENT SEALER (UTURN ARROW)
|
EA
|
4.000
|
$50.000
|
$46.720
|
$45.000
|
|
|
PAVEMENT SEALER (YLD TRI)
|
EA
|
8.000
|
$7.000
|
$25.960
|
$25.000
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
7,290.000
|
$1.900
|
$0.860
|
$0.830
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
55,302.000
|
$1.000
|
$0.800
|
$0.770
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
56,035.000
|
$0.900
|
$0.800
|
$0.770
|
|
PREFAB PAV MRK TY C (W) (UTURN ARROW)
|
EA
|
4.000
|
$540.000
|
$425.710
|
$410.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
101.000
|
$5.400
|
$5.190
|
$5.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
610.000
|
$5.800
|
$5.190
|
$5.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
912.000
|
$5.400
|
$5.190
|
$5.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
26,044.000
|
$1.000
|
$0.520
|
$0.500
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
1,930.000
|
$0.850
|
$0.520
|
$0.500
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
685.000
|
$0.800
|
$1.040
|
$1.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
118,627.000
|
$0.170
|
$0.170
|
$0.160
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
17,764.000
|
$0.180
|
$0.270
|
$0.260
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
2,610.000
|
$0.630
|
$1.040
|
$1.000
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
248.000
|
$0.850
|
$2.020
|
$1.950
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
23.000
|
$26.000
|
$34.260
|
$33.000
|
|
|
PAV SURF PREP FOR MRK (UTURN ARR)
|
EA
|
4.000
|
$31.000
|
$38.420
|
$37.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
27.000
|
$35.000
|
$48.800
|
$47.000
|
|
|
PAV SURF PREP FOR MRK (36")(YLD TRI)
|
EA
|
8.000
|
$7.500
|
$20.770
|
$20.000
|
|
|
FULL - WIDTH MOWING
|
CYC
|
3.000
|
$2,500.000
|
$2,400.000
|
$3,000.000
|
|
|
NO. OF WORKING DAYS
|
$/D
|
5,000.000
|
$735.000
|
$630.000
|
$630.000
|
|
|
SP MIXES SP-B PG64-22
|
TON
|
23,672.000
|
$115.000
|
$126.000
|
$124.000
|
|
|
SP MIXES SP-C SAC-B PG64-22
|
TON
|
11,875.000
|
$120.000
|
$147.000
|
$145.000
|
|
|
SP MIXES SP-C SAC-A PG70-22
|
TON
|
5,272.000
|
$160.000
|
$154.000
|
$152.000
|
|
|
SP MIXES SP-D SAC-A PG70-22
|
TON
|
2,384.000
|
$125.000
|
$167.000
|
$165.000
|
|
|
TACK COAT
|
GAL
|
6,461.000
|
$5.500
|
$4.600
|
$4.550
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$13,000.000
|
$20,000.000
|
$15,000.000
|
|
|
CONDUIT (PREPARE)
|
LF
|
299.000
|
$4.400
|
$5.080
|
$5.100
|
|
|
GROUND BOX (PREPARE)
|
EA
|
5.000
|
$500.000
|
$421.320
|
$423.300
|
|
|
TMA (STATIONARY)
|
DAY
|
698.000
|
$225.000
|
$190.000
|
$185.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
216.000
|
$93.000
|
$90.000
|
$90.000
|
|
Totals: |
$57,882,764.440
|
$60,049,999.000
|
$62,420,227.002
|