KAUFMAN SH 34 (0173-04-057)

Items: 67

County: KAUFMAN
Length: N/A
Highway: SH 34
District: DALLAS
Control Number: 0173-04-057
DBE Goal: N/A
Project: C 173-4-57
Guaranty: N/A
Time: 134 WORKING DAYS
Engineer's Estimate: $5,211,158.47
Date: 10/07/2022 (3 years ago)
Contract Number: N/A
Type: RECONSTRUCTION OF EXISTING ROADWAY
Mail/Deliver Bids To: N/A
LANE SELMAN
NICHOLAS WADLINGTON
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$5,211,158.47
$5,861,108.95
Over/Under Est: 12.47% $649,950.48
Over/Under Est: 14.75% $768,705.19
Amt Left: 2.03% $118,754.71
Over/Under Est: 15.14% $788,767.19
Amt Left: 2.37% $138,816.71
Delta: -0.34% -$20,062.00
Over/Under Est: 16.75% $872,702.58
Amt Left: 3.8% $222,752.10
Delta: -1.40% -$83,935.39
Over/Under Est: 20.78% $1,083,135.84
Amt Left: 7.39% $433,185.36
Delta: -3.46% -$210,433.26

Bid Items & Bid Tabulations

67 Total 0 of 67
KAUFMAN  |  SH 34  |  DALLAS  |  0173-04-057  |  10/07/2022  |  $5,211,158.47  |  C 173-4-57  |  RECON OF EXIST ROADWAY  |  134 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TEXAS MATERIALS GROUP, INC.
SILVER CREEK CONSTRUCTION, INC.
O. TREVINO CONSTRUCTION, LLC
AUSTIN BRIDGE & ROAD SERVICES, LP
INDUS ROAD & BRIDGE, INC.
REMOVING CONC (RIPRAP)
SY 20.000 $15.000 $19.000 $20.000 $40.000 $18.000 $36.000
REMOVING CONC (DRIVEWAYS)
SY 2,237.000 $15.000 $19.000 $30.000 $40.000 $18.000 $37.000
REMOVING CONC (CURB)
LF 14,599.000 $6.000 $5.400 $12.000 $16.600 $5.000 $12.000
REMOVING STAB BASE AND ASPH PAV (2"-6")
SY 1,111.000 $10.000 $10.250 $20.000 $12.000 $21.300 $15.000
BACKFILL (TY A OR B)
STA 82.180 $180.000 $188.000 $200.000 $175.000 $164.070 $430.000
FURNISHING AND PLACING TOPSOIL (4")
SY 7,301.000 $1.500 $1.350 $3.000 $7.400 $0.500 $2.000
BLOCK SODDING
SY 7,301.000 $4.100 $6.500 $6.000 $5.250 $7.080 $7.000
DRILL SEED (TEMP)(WARM OR COOL)
SY 7,301.000 $0.750 $0.420 $0.400 $0.600 $1.480 $0.410
VEGETATIVE WATERING
MG 2,180.000 $5.000 $0.010 $20.000 $42.000 $0.100 $21.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 858.000 $50.000 $65.000 $65.000 $81.000 $90.000 $81.000
PLANE ASPH CONC PAV(0" TO 3")
SY 11,990.000 $3.000 $2.200 $5.000 $2.500 $3.500 $5.000
FULL-DEPTH REPAIR CRCP (8"-10")
SY 7,036.000 $215.000 $213.000 $200.000 $191.500 $205.000 $225.000
TRENCH EXCAVATION PROTECTION
LF 32.000 $10.000 $10.250 $40.000 $30.000 $10.000 $68.000
RIPRAP (CONC)(4 IN)
CY 3.000 $500.000 $820.000 $1,000.000 $835.000 $700.000 $1,000.000
RC PIPE (CL III)(18 IN)
LF 4.000 $100.000 $450.000 $200.000 $650.000 $400.000 $200.000
RC PIPE (CL III)(21 IN)
LF 6.000 $130.000 $477.000 $200.000 $444.000 $425.000 $405.000
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
EA 1.000 $5,250.000 $6,800.000 $6,000.000 $6,000.000 $6,100.000 $8,000.000
INLET (COMPL)(CURB)(TY C1)
EA 1.000 $8,500.000 $8,100.000 $6,000.000 $9,650.000 $7,300.000 $9,500.000
ADJUSTING INLETS
EA 28.000 $3,000.000 $3,350.000 $4,000.000 $6,550.000 $3,100.000 $3,300.000
ADJUSTING INLET (CAP)
EA 2.000 $1,500.000 $2,650.000 $4,000.000 $4,500.000 $2,500.000 $3,400.000
MOBILIZATION
LS 1.000 $430,850.770 $554,116.000 $580,000.000 $600,000.000 $600,000.000 $391,218.350
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $15,000.000 $23,000.000 $10,000.000 $5,000.000 $32,000.000 $12,500.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 63.000 $40.000 $41.000 $40.000 $65.000 $40.000 $41.000
CONSTRUCTION EXITS (REMOVE)
SY 63.000 $15.000 $12.300 $10.000 $25.000 $12.000 $13.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 877.000 $4.000 $4.110 $4.000 $4.400 $4.000 $4.100
TEMP SEDMT CONT FENCE (REMOVE)
LF 877.000 $1.000 $0.260 $0.250 $1.250 $0.250 $0.300
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 2,741.000 $4.800 $6.200 $3.000 $5.000 $6.000 $7.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 2,741.000 $1.200 $1.040 $0.500 $1.200 $1.000 $1.150
CONC CURB & GUTTER (TY II)
LF 14,599.000 $28.000 $45.000 $37.000 $37.500 $41.000 $24.000
INTERSECTIONS (CONC)
SY 622.000 $220.000 $104.000 $175.000 $99.000 $93.000 $140.000
INTERSECTIONS (ACP)
SY 676.000 $80.000 $47.000 $75.000 $52.500 $61.000 $185.000
DRIVEWAYS (ACP)
SY 435.000 $80.000 $64.000 $78.000 $70.000 $110.000 $263.000
DRIVEWAYS (CONC) (HES)
SY 1,615.000 $100.000 $100.000 $140.000 $98.000 $90.000 $160.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 10.000 $300.000 $268.000 $275.000 $375.000 $350.000 $350.000
MAILBOX INSTALL-D (TWW-POST) TY 4
EA 2.000 $330.000 $322.000 $285.500 $428.000 $400.000 $400.000
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 2.000 $700.000 $780.000 $760.000 $860.000 $800.000 $800.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 54.000 $750.000 $673.000 $815.250 $700.000 $650.000 $650.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 30.000 $800.000 $845.000 $905.750 $910.000 $850.000 $850.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 1.000 $1,500.000 $1,015.000 $1,105.000 $1,040.000 $970.000 $970.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 5.000 $1,100.000 $1,175.000 $1,190.000 $1,230.000 $1,150.000 $1,150.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 3.000 $1,150.000 $1,185.000 $1,290.000 $1,180.000 $1,100.000 $1,100.000
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 1.000 $1,400.000 $1,485.000 $1,410.000 $1,480.000 $1,385.000 $1,385.000
RELOCATE SM RD SN SUP&AM TY S80
EA 1.000 $750.000 $755.000 $695.000 $675.000 $630.000 $650.000
REMOVE SM RD SN SUP&AM
EA 90.000 $150.000 $85.000 $75.000 $21.000 $20.000 $22.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 2,851.000 $2.000 $1.100 $4.000 $1.700 $0.550 $1.300
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 554.000 $1.500 $1.100 $4.000 $1.700 $0.570 $1.300
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 2,216.000 $1.500 $1.000 $0.910 $1.050 $1.100 $1.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 768.000 $9.500 $6.400 $6.100 $7.000 $10.000 $7.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 26.000 $150.000 $123.000 $120.000 $150.000 $125.000 $132.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 18.000 $185.000 $128.000 $124.000 $185.000 $200.000 $135.000
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
EA 192.000 $45.000 $36.000 $35.000 $32.000 $20.000 $38.000
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 4,128.000 $0.700 $0.620 $0.600 $1.050 $0.800 $0.700
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 15,189.000 $0.600 $0.560 $0.540 $0.550 $0.520 $0.600
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 420.000 $0.650 $1.050 $1.000 $1.050 $1.000 $1.100
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 15,657.000 $0.650 $0.570 $0.540 $0.550 $0.550 $0.600
REFL PAV MRKR TY I-C
EA 321.000 $6.000 $4.120 $4.000 $4.250 $4.000 $4.500
REFL PAV MRKR TY II-A-A
EA 140.000 $6.500 $4.120 $4.000 $4.250 $6.000 $4.500
FULL - WIDTH MOWING
CYC 3.000 $5,000.000 $2,035.000 $2,500.000 $700.000 $3,000.000 $4,500.000
DRAIN INLET CLEANING
EA 49.000 $500.000 $615.000 $350.000 $580.000 $200.000 $300.000
CAM (ASPHALT) PG(76-22)
TON 333.400 $155.000 $200.000 $208.000 $208.000 $210.000 $225.000
CAM (AGGREGATE)
TON 4,162.820 $140.000 $200.000 $208.000 $208.000 $210.000 $225.000
MEMBRANE UNDERSEAL
GAL 14,044.000 $5.500 $3.900 $4.000 $4.000 $4.500 $4.500
SP MIXES SP-C SAC-B PG70-22
TON 8,058.010 $110.000 $130.000 $130.000 $130.000 $151.000 $150.000
TACK COAT
GAL 7,745.000 $4.000 $0.010 $0.010 $0.010 $1.000 $1.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 5.000 $12,000.000 $7,400.000 $7,500.000 $10,000.000 $200.000 $10,000.000
TMA (STATIONARY)
DAY 134.000 $250.000 $258.000 $150.000 $120.000 $305.000 $300.000
TMA (MOBILE OPERATION)
HR 240.000 $100.000 $0.010 $75.000 $60.000 $10.000 $150.000
Totals: $5,211,158.470 $5,861,108.950 $5,979,863.660 $5,999,925.660 $6,083,861.053 $6,294,294.310