JONES FM 1082 (0975-02-023)

Items: 60

County: JONES
Length: 0.0000 MILES
Highway: FM 1082
District: ABILENE
Control Number: 0975-02-023
DBE Goal: 0.0%
Project: STP 2026(352)HES
Guaranty: $110,000.00
Time: 154 WORKING DAYS
Engineer's Estimate: $2,746,601.05
Date: 01/07/2026 (5 months ago)
Contract Number: 1263231
Type: WIDEN ROAD - ADD SHOULDERS
Project ID: A00177149
Contract Type: Federal
Project Description: 'PROVIDE ADDITIONAL PAVED SURFACE WIDTH
Mail/Deliver Bids To: N/A
BRYCE TURENTINE
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$2,746,601.05
$2,611,154.60
Over/Under Est: -4.93% -$135,446.45
Over/Under Est: 4.1% $112,642.55
Amt Left: 9.5% $248,089.00
$2,996,702.40
Over/Under Est: 9.11% $250,101.35
Amt Left: 14.77% $385,547.80
Delta: -4.81% -$137,458.80
Over/Under Est: 11.27% $309,409.05
Amt Left: 17.04% $444,855.50
Delta: -1.98% -$59,307.70
$3,575,636.32
Over/Under Est: 30.18% $829,035.27
Amt Left: 36.94% $964,481.72
Delta: -17.00% -$519,626.22

Bid Items & Bid Tabulations

60 Total 0 of 60
JONES  |  FM 1082  |  ABILENE  |  0975-02-023  |  01/07/2026  |  $2,746,601.05  |  STP 2026(352)HES  |  WIDEN ROAD - ADD SHOULDERS  |  154 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
J. H. STRAIN & SONS, INC.
ROMAN EMPERORS ROAD, LLC
CK NEWBERRY, LLC
GREY SKY CONSTRUCTION LLC
A. L. HELMCAMP, INC.
EXCAV (ROADWAY)
CY 11,329.000 $13.000 $12.000 $30.000 $20.000 $20.000 $32.000
EMBANK (FNL)(DC)(TY A)
CY 1,259.000 $25.000 $25.000 $40.000 $35.000 $50.000 $48.000
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 4,973.000 $65.000 $70.000 $65.000 $110.000 $70.000 $115.000
PRIME COAT (MC-30)
GAL 8,256.000 $9.000 $5.750 $5.000 $8.000 $6.000 $9.000
ASPH (AC-20-5TR)
GAL 67,045.000 $6.000 $7.000 $4.000 $4.000 $6.000 $5.000
AGGR (TY-PB, GR-3)(SAC-B)
CY 438.000 $125.000 $140.000 $155.000 $225.000 $200.000 $500.000
AGGR (TY-PB, GR-4)(SAC-B)
CY 1,042.000 $125.000 $140.000 $155.000 $150.000 $200.000 $250.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")
SY 5,726.000 $41.000 $40.000 $40.000 $50.000 $40.000 $67.000
CUT & RESTORING PAV
SY 96.000 $125.000 $150.000 $180.000 $125.000 $150.000 $60.000
CL B CONC (MISC)
CY 58.000 $900.000 $400.000 $800.000 $1,000.000 $1,500.000 $780.000
CMP (GAL STL 24 IN)
LF 125.000 $125.000 $155.000 $120.000 $125.000 $105.000 $110.000
CONC BOX CULV (4 FT X 2 FT)
LF 72.000 $900.000 $550.000 $420.000 $800.000 $750.000 $650.000
CONC BOX CULV (5 FT X 2 FT)
LF 39.000 $1,000.000 $695.000 $550.000 $1,000.000 $800.000 $850.000
SET (TY I)(S= 4 FT)(HW= 3 FT)(4:1)(C)
EA 2.000 $10,000.000 $8,500.000 $9,000.000 $8,000.000 $12,500.000 $7,000.000
SET (TY I)(S= 4 FT)(HW= 4 FT)(4:1)(C)
EA 2.000 $11,000.000 $9,250.000 $12,000.000 $10,000.000 $14,500.000 $8,000.000
SET (TY I)(S= 5 FT)(HW= 3 FT)(4:1)(C)
EA 1.000 $12,000.000 $10,500.000 $12,000.000 $8,500.000 $15,000.000 $7,100.000
SET (TY I)(S= 5 FT)(HW= 5 FT)(4:1)(C)
EA 1.000 $13,000.000 $10,750.000 $14,000.000 $15,000.000 $16,500.000 $12,500.000
SET (TY II) (24 IN) (CMP) (6: 1) (P)
EA 10.000 $3,000.000 $3,590.000 $2,200.000 $3,000.000 $2,500.000 $2,400.000
REMOV STR (PIPE)
LF 320.000 $50.000 $15.000 $30.000 $30.000 $50.000 $22.000
MOBILIZATION
LS 1.000 $229,960.000 $157,000.000 $300,000.000 $295,000.000 $270,000.000 $330,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 9.000 $15,000.000 $12,000.000 $6,000.000 $15,000.000 $8,500.000 $16,000.000
TMA (STATIONARY)
DAY 120.000 $300.000 $225.000 $250.000 $25.000 $250.000 $250.000
TMA (MOBILE OPERATION)
DAY 42.000 $600.000 $175.000 $320.000 $25.000 $550.000 $10.000
ROCK FILTER DAMS (INSTALL) (TY 4)
LF 40.000 $100.000 $100.000 $85.000 $125.000 $80.000 $94.000
ROCK FILTER DAMS (REMOVE)
LF 40.000 $15.000 $10.000 $15.000 $10.000 $20.000 $11.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 8,880.000 $6.000 $5.000 $4.000 $4.500 $4.000 $4.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 8,880.000 $2.000 $0.750 $1.000 $1.000 $2.000 $1.100
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 2,360.000 $7.000 $5.000 $8.000 $6.500 $15.000 $6.400
BIODEG EROSN CONT LOGS (REMOVE)
LF 2,360.000 $2.000 $1.000 $2.000 $1.000 $5.000 $1.100
CONSTRUCTING DETOURS
SY 610.000 $130.000 $150.000 $140.000 $125.000 $68.000 $35.000
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 1.000 $10,000.000 $10,000.000 $6,500.000 $10,000.000 $8,500.000 $7,000.000
DRIVEWAYS (BASE)
SY 2,846.000 $20.000 $22.000 $50.000 $25.000 $25.000 $30.000
TURNOUTS (RAP)
SY 1,114.000 $10.000 $10.000 $50.000 $20.000 $40.000 $40.000
MTL W-BEAM GD FEN (TIM POST)
LF 250.000 $30.000 $33.000 $30.000 $28.000 $30.000 $30.000
MTL THRIE-BEAM GD FEN (TIM POST)
EA 2.000 $2,350.000 $3,025.000 $2,000.000 $1,625.000 $1,850.000 $1,700.000
REMOVE METAL BEAM GUARD FENCE
LF 450.000 $2.500 $2.000 $4.000 $3.000 $3.000 $3.200
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $3,500.000 $3,025.000 $3,500.000 $3,000.000 $3,850.000 $3,200.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $250.000 $220.000 $450.000 $300.000 $1,500.000 $320.000
CRASH CUSH ATTEN (INSTL)(R)(N)(TL3)
EA 2.000 $30,000.000 $36,300.000 $24,000.000 $30,000.000 $21,000.000 $30,000.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 32.000 $500.000 $242.000 $300.000 $275.000 $1,500.000 $220.000
MAILBOX INSTALL-D (TWW-POST) TY 4
EA 8.000 $500.000 $265.000 $350.000 $300.000 $1,500.000 $240.000
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 12.000 $500.000 $705.000 $740.000 $600.000 $1,500.000 $650.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 164.000 $690.000 $720.000 $650.000 $625.000 $800.000 $660.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 4.000 $975.000 $940.000 $900.000 $775.000 $1,100.000 $860.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 1.000 $1,000.000 $1,200.000 $1,000.000 $800.000 $1,100.000 $1,100.000
REMOVE SM RD SN SUP&AM
EA 150.000 $125.000 $100.000 $100.000 $100.000 $100.000 $110.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 6.000 $55.000 $55.000 $40.000 $50.000 $100.000 $33.000
INSTL OM ASSM (OM-2Y)(WC)GND(BI)
EA 24.000 $55.000 $86.000 $85.000 $75.000 $100.000 $80.000
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 196.000 $5.000 $11.000 $8.000 $11.000 $6.000 $4.200
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 2,400.000 $1.500 $1.400 $2.000 $1.500 $3.000 $0.950
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 44.000 $15.000 $22.000 $20.000 $25.000 $20.000 $4.200
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 7,680.000 $0.600 $0.550 $2.000 $0.750 $1.000 $0.800
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 4,128.000 $2.000 $1.250 $2.000 $1.000 $6.000 $0.530
RE PROFILE PM TY I(W)6"(SLD)(100MIL)
LF 81,669.000 $0.700 $0.650 $0.900 $0.600 $0.650 $0.720
RE PROFILE PM TY I(Y)6"(SLD)(100MIL)
LF 51,815.000 $0.700 $0.650 $0.900 $0.600 $0.650 $0.720
RE PROFILE PM TY I(Y)6"(BRK)(100MIL)
LF 5,310.000 $0.700 $0.650 $1.000 $0.600 $0.650 $0.750
PRFB RUMBLE STRIP (BLK)(1')(CENTERLINE)
LF 785.000 $0.250 $8.800 $5.000 $8.000 $5.000 $3.700
PREFAB PM TY C (W)(24")(SLD)
LF 128.000 $25.000 $33.000 $20.000 $30.000 $20.000 $13.000
PREFAB PM TY C (W)(36")(YLD TRI)
EA 3.000 $40.000 $33.000 $60.000 $30.000 $150.000 $53.000
REFL PAV MRKR TY II-A-A
EA 954.000 $7.000 $6.750 $6.000 $6.000 $6.000 $4.000
Totals: $2,746,601.050 $2,611,154.600 $2,859,243.600 $2,996,702.400 $3,056,010.100 $3,575,636.320