PREPARING ROW
|
STA
|
58.000
|
$6,000.000
|
$10,000.000
|
$4,000.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (6")
|
SY
|
4,725.000
|
$8.000
|
$10.000
|
$4.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
174,882.000
|
$13.000
|
$15.000
|
$37.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY D)
|
CY
|
40,515.000
|
$15.000
|
$8.000
|
$24.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
AC
|
18.060
|
$2,000.000
|
$1,000.000
|
$1,265.000
|
|
|
DRILL SEEDING (TEMP) (WARM)
|
AC
|
9.040
|
$850.000
|
$1,000.000
|
$910.000
|
|
|
DRILL SEEDING (TEMP) (COOL)
|
AC
|
9.020
|
$850.000
|
$1,000.000
|
$935.000
|
|
|
VEGETATIVE WATERING
|
MG
|
735.900
|
$60.000
|
$76.540
|
$46.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY A)
|
SY
|
2,910.000
|
$7.000
|
$3.000
|
$2.750
|
|
|
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
|
CY
|
7,004.000
|
$85.000
|
$55.000
|
$59.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
3,751.000
|
$12.000
|
$7.000
|
$5.500
|
|
|
ASPH (MULTI OPTION)
|
GAL
|
7,501.000
|
$10.000
|
$8.000
|
$5.500
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
7,467.000
|
$10.000
|
$8.000
|
$5.500
|
|
|
AGGR(TY-PB GR-3 SAC-B)
|
CY
|
164.000
|
$350.000
|
$200.000
|
$310.000
|
|
|
AGGR (TY-PB GR-4 MOD)
|
CY
|
173.000
|
$380.000
|
$200.000
|
$275.000
|
|
|
CEM STABIL BKFL
|
CY
|
62.000
|
$350.000
|
$500.000
|
$220.000
|
|
|
CUT & RESTORING PAV
|
SY
|
11.000
|
$350.000
|
$500.000
|
$500.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
6.000
|
$700.000
|
$1,000.000
|
$580.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
512.000
|
$320.000
|
$510.000
|
$510.000
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
51.200
|
$1,900.000
|
$2,500.000
|
$3,000.000
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
28.600
|
$2,150.000
|
$2,500.000
|
$4,400.000
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
31.600
|
$2,100.000
|
$2,500.000
|
$2,600.000
|
|
|
REINF CONC SLAB
|
SF
|
11,050.000
|
$45.000
|
$40.000
|
$62.000
|
|
|
APPROACH SLAB
|
CY
|
51.300
|
$1,200.000
|
$2,500.000
|
$1,900.000
|
|
|
PRESTR CONC GIRDER (TX54)
|
LF
|
1,294.000
|
$310.000
|
$400.000
|
$310.000
|
|
|
SILICONE RESIN PAINT FINISH
|
SF
|
1,400.000
|
$15.000
|
$12.000
|
$14.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
182.000
|
$800.000
|
$800.000
|
$890.000
|
|
|
RIPRAP (CONC)(CL B)(5 IN)
|
CY
|
180.000
|
$850.000
|
$800.000
|
$795.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(18 IN)
|
CY
|
62.000
|
$300.000
|
$600.000
|
$155.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
64.000
|
$650.000
|
$800.000
|
$800.000
|
|
|
RAIL (TY SSTR)
|
LF
|
698.000
|
$165.000
|
$150.000
|
$210.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
68.000
|
$230.000
|
$300.000
|
$340.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
236.000
|
$100.000
|
$120.000
|
$136.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
130.000
|
$150.000
|
$150.000
|
$144.000
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$2,000.000
|
$3,500.000
|
$2,313.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$2,500.000
|
$4,000.000
|
$2,536.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
4.000
|
$2,800.000
|
$4,500.000
|
$3,060.000
|
|
|
REMOV STR (SET)
|
EA
|
2.000
|
$2,500.000
|
$3,200.000
|
$2,118.000
|
|
|
REMOV STR (PIPE)
|
EA
|
1.000
|
$2,000.000
|
$3,200.000
|
$3,877.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$719,000.000
|
$880,000.000
|
$825,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
15.000
|
$10,000.000
|
$50,000.000
|
$10,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
120.000
|
$50.000
|
$60.000
|
$68.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
120.000
|
$15.000
|
$17.500
|
$22.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
230.000
|
$45.000
|
$55.000
|
$65.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
230.000
|
$10.000
|
$15.000
|
$18.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,775.000
|
$5.000
|
$5.000
|
$5.500
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,775.000
|
$2.000
|
$2.500
|
$1.500
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
385.000
|
$5.000
|
$7.500
|
$8.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
575.000
|
$10.000
|
$10.000
|
$11.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
960.000
|
$4.000
|
$3.000
|
$3.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
3,870.000
|
$60.000
|
$45.000
|
$15.000
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
5.000
|
$8,000.000
|
$4,500.000
|
$10,000.000
|
|
|
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
|
LF
|
1,140.000
|
$25.000
|
$15.000
|
$75.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
870.000
|
$20.000
|
$12.000
|
$25.000
|
|
|
PORT CTB (STKPL)(SGL SLP)(TY 1)
|
LF
|
1,140.000
|
$20.000
|
$15.000
|
$75.000
|
|
|
PORT CTB (STKPL)(F-SHAPE)(TY 1)
|
LF
|
420.000
|
$20.000
|
$15.000
|
$75.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
544.000
|
$50.000
|
$70.000
|
$85.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
850.000
|
$30.000
|
$25.000
|
$34.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$2,800.000
|
$2,025.000
|
$2,470.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$3,500.000
|
$3,300.000
|
$3,835.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$3,000.000
|
$3,200.000
|
$8,040.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
4.000
|
$2,000.000
|
$1,500.000
|
$4,020.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
2.000
|
$10,000.000
|
$10,250.000
|
$17,135.000
|
|
|
CHAIN LINK FENCE (INSTALL) (6')
|
LF
|
4,633.000
|
$40.000
|
$20.000
|
$45.000
|
|
|
GATE (INSTALL)(SINGLE)(6' X 24')
|
EA
|
1.000
|
$2,000.000
|
$2,500.000
|
$4,000.000
|
|
|
WIRE FENCE (TY C)
|
LF
|
1,497.000
|
$25.000
|
$20.000
|
$10.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
14.000
|
$1,200.000
|
$851.000
|
$910.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
34.000
|
$700.000
|
$542.000
|
$650.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
27.000
|
$150.000
|
$100.000
|
$130.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
8.000
|
$50.000
|
$52.950
|
$69.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
17.000
|
$40.000
|
$57.950
|
$31.000
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND(BI)
|
EA
|
4.000
|
$100.000
|
$57.000
|
$97.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
720.000
|
$3.000
|
$1.000
|
$1.300
|
|
REFL PAV MRK TY II (W) 6" (SLD)
|
LF
|
24,847.000
|
$1.500
|
$0.550
|
$0.720
|
|
REFL PAV MRK TY II (W) 24" (SLD)
|
LF
|
36.000
|
$15.000
|
$25.000
|
$32.500
|
|
REFL PAV MRK TY II (Y) 6" (SLD)
|
LF
|
10,422.000
|
$1.500
|
$0.550
|
$0.720
|
|
|
REF PROF PAV MRK TY I(W)6"(SLD)(100MIL)
|
LF
|
13,670.000
|
$1.500
|
$1.250
|
$1.630
|
|
|
REF PROF PAV MRK TY I(Y)6"(SLD)(100MIL)
|
LF
|
13,570.000
|
$1.500
|
$1.250
|
$1.630
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
16.000
|
$20.000
|
$30.000
|
$39.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
341.000
|
$5.000
|
$9.000
|
$11.700
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
35,826.000
|
$1.000
|
$0.250
|
$0.330
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
12.000
|
$25.000
|
$25.000
|
$32.500
|
|
|
DEAD END ROADWAY BARRICADE
|
LF
|
24.000
|
$110.000
|
$125.000
|
$165.000
|
|
|
TMA (STATIONARY)
|
DAY
|
30.000
|
$400.000
|
$735.000
|
$250.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
20.000
|
$400.000
|
$950.000
|
$250.000
|
|
Totals: |
$8,058,457.500
|
$8,867,738.986
|
$12,756,115.560
|