Show Job Controls
Bid Cobra

JONES FM 707 (0484-01-025)

Items: 54

County: JONES
Length: N/A
Highway: FM 707
District: ABILENE
Control Number: 0484-01-025
DBE Goal: N/A
Project: BR 2022(244)
Guaranty: N/A
Time: 129 WORKING DAYS
Engineer's Estimate: $1,759,299.85
Date: 04/06/2022 (4 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (3)
E
Engineer's Estimate
$1,759,299.85
$2,265,797.70
Over/Under Est: 28.79% $506,497.85
Over/Under Est: 58.9% $1,036,289.85
Amt Left: 23.38% $529,792.00
$2,943,780.10
Over/Under Est: 67.33% $1,184,480.25
Amt Left: 29.92% $677,982.40
Delta: -5.30% -$148,190.40

Bid Items & Bid Tabulations

54 Total 0 of 54
JONES  |  FM 707  |  ABILENE  |  0484-01-025  |  04/06/2022  |  $1,759,299.85  |  BR 2022(244)  |  BRIDGE REPL  |  129 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
EARTH BUILDERS, L.P.
COPPELL CONSTRUCTION CO., INC.
GILVIN-TERRILL, LTD.
PREPARING ROW
STA 32.000 $250.000 $2,500.000 $3,000.000 $1,000.000
REMOVING STAB BASE AND ASPH PAV(0"-16")
SY 3,841.000 $4.000 $10.000 $20.000 $10.000
EXCAVATION (ROADWAY)
CY 140.000 $15.000 $25.000 $45.000 $25.000
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 5,515.000 $17.000 $32.000 $35.000 $30.000
FURNISHING AND PLACING TOPSOIL (4")
STA 26.000 $1,000.000 $300.000 $3,500.000 $1,500.000
DRILL SEEDING (PERM) (RURAL) (SANDY)
SY 33,512.000 $0.250 $0.250 $0.150 $0.150
SOIL RETENTION BLANKETS (CL 1) (TY A)
SY 2,555.000 $1.250 $3.000 $2.000 $2.200
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 862.000 $55.000 $62.000 $122.000 $100.000
PRIME COAT (MC-30)
GAL 1,551.000 $5.000 $8.000 $15.000 $6.000
CEM STABIL BKFL
CY 224.000 $170.000 $450.000 $300.000 $200.000
DRILL SHAFT (18 IN)
LF 134.000 $130.000 $125.000 $115.000 $209.200
DRILL SHAFT (36 IN)
LF 700.000 $245.000 $260.000 $270.000 $314.200
CL C CONC (ABUT)(HPC)
CY 70.600 $1,070.000 $1,500.000 $1,780.000 $1,500.000
CL C CONC (CAP)(HPC)
CY 54.600 $1,060.000 $1,500.000 $1,430.000 $1,500.000
CL C CONC (COLUMN)(HPC)
CY 20.900 $1,050.000 $1,500.000 $2,250.000 $1,500.000
REINF CONC SLAB (HPC)
SF 6,300.000 $23.000 $25.000 $45.000 $35.000
APPROACH SLAB (HPC)
CY 128.200 $700.000 $700.000 $880.000 $1,500.000
PRESTR CONC GIRDER (TX28)
LF 741.500 $185.000 $195.000 $260.000 $260.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 142.000 $125.000 $95.000 $320.000 $150.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 893.000 $118.000 $95.000 $330.000 $150.000
RIPRAP (MOW STRIP)(5 IN)
CY 47.000 $560.000 $550.000 $1,200.000 $650.000
RAIL (TY T223)(HPC)
LF 372.000 $135.000 $130.000 $275.000 $200.000
ARMOR JOINT (SEALED)
LF 108.000 $116.000 $145.000 $175.000 $110.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 1.000 $70,000.000 $150,000.000 $90,000.000 $185,000.000
REMOV STR (CATTLE GUARD)
EA 1.000 $800.000 $800.000 $2,000.000 $4,000.000
MOBILIZATION
LS 1.000 $127,356.000 $225,000.000 $265,000.000 $275,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $5,000.000 $2,000.000 $1,200.000 $15,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 80.000 $29.000 $50.000 $30.000 $35.000
ROCK FILTER DAMS (REMOVE)
LF 80.000 $11.000 $8.000 $10.000 $13.500
CONSTRUCTION EXITS (INSTALL) (TY 2)
SY 156.000 $25.000 $45.000 $120.000 $120.000
CONSTRUCTION EXITS (REMOVE)
SY 156.000 $10.000 $8.000 $23.000 $23.500
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,750.000 $3.000 $3.000 $3.000 $3.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,750.000 $1.000 $1.000 $0.900 $1.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 430.000 $4.000 $6.000 $6.000 $6.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 430.000 $1.000 $1.000 $1.000 $1.750
DRIVEWAYS (ACP)
SY 850.000 $30.000 $50.000 $35.000 $100.000
MTL W-BEAM GD FEN (TIM POST)
LF 300.000 $22.000 $32.000 $25.000 $30.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $1,750.000 $2,000.000 $1,600.000 $2,275.000
REMOVE METAL BEAM GUARD FENCE
LF 325.000 $3.000 $3.500 $20.000 $2.500
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $2,600.000 $3,400.000 $3,300.000 $3,250.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $275.000 $300.000 $500.000 $2.500
GATE (TY 1)
EA 6.000 $1,500.000 $800.000 $500.000 $2,000.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 1.000 $420.000 $800.000 $1,000.000 $875.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 2.000 $660.000 $950.000 $1,200.000 $1,050.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 8.000 $30.000 $45.000 $50.000 $25.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 11.000 $40.000 $32.000 $50.000 $30.000
REFL PAV MRK TY II (W) 4" (SLD)
LF 2,720.000 $1.000 $2.000 $1.500 $1.000
REFL PAV MRK TY II (Y) 4" (BRK)
LF 341.000 $0.500 $2.500 $2.000 $1.500
REFL PAV MRKR TY II-A-A
EA 18.000 $3.000 $12.000 $9.000 $20.000
PAV SURF PREP FOR MRK (4")
LF 3,061.000 $0.100 $1.200 $0.900 $1.000
SP MIXES SP-B SAC-B PG70-22
TON 1,137.000 $130.000 $128.000 $10.000 $160.000
SP MIXES SP-D SAC-B PG70-22
TON 550.000 $135.000 $132.000 $15.000 $170.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $6,000.000 $20,000.000 $2,500.000 $15,500.000
TMA (STATIONARY)
DAY 260.000 $95.000 $45.000 $222.000 $395.000
Totals: $1,759,299.850 $2,265,797.700 $2,795,589.700 $2,943,780.100