PREPARING ROW
|
STA
|
32.000
|
$250.000
|
$5,000.000
|
|
|
REMOVING STAB BASE AND ASPH PAV(0"-16")
|
SY
|
3,841.000
|
$4.000
|
$8.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
140.000
|
$15.000
|
$25.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
5,515.000
|
$17.000
|
$28.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
STA
|
26.000
|
$1,000.000
|
$300.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (SANDY)
|
SY
|
33,150.000
|
$0.250
|
$0.180
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY A)
|
SY
|
8,295.000
|
$1.250
|
$2.200
|
|
|
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
|
CY
|
862.000
|
$55.000
|
$60.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
1,551.000
|
$5.000
|
$5.000
|
|
|
CEM STABIL BKFL
|
CY
|
308.000
|
$170.000
|
$450.000
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
134.000
|
$130.000
|
$125.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
700.000
|
$245.000
|
$260.000
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
70.600
|
$1,070.000
|
$1,500.000
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
54.600
|
$1,060.000
|
$1,500.000
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
20.900
|
$1,050.000
|
$1,500.000
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
6,300.000
|
$23.000
|
$25.000
|
|
|
APPROACH SLAB (HPC)
|
CY
|
128.200
|
$700.000
|
$680.000
|
|
|
RETAINING WALL (TEMP WALL)
|
SF
|
1,521.000
|
$20.000
|
$30.000
|
|
|
PRESTR CONC GIRDER (TX28)
|
LF
|
741.500
|
$185.000
|
$170.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
142.000
|
$125.000
|
$95.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
893.000
|
$118.000
|
$95.000
|
|
|
RIPRAP (MOW STRIP)(5 IN)
|
CY
|
47.000
|
$560.000
|
$500.000
|
|
|
RAIL (TY T223)(HPC)
|
LF
|
372.000
|
$135.000
|
$125.000
|
|
|
ARMOR JOINT (SEALED)
|
LF
|
108.000
|
$116.000
|
$125.000
|
|
|
CMP AR (GAL STL DES 4)
|
LF
|
30.000
|
$150.000
|
$100.000
|
|
|
CMP (GAL STL 108 IN)
|
LF
|
230.000
|
$425.000
|
$400.000
|
|
|
SET (TY II) (DES 4) (CMP) (3: 1) (C)
|
EA
|
5.000
|
$2,000.000
|
$2,500.000
|
|
|
REMOV STR (SET)
|
EA
|
5.000
|
$400.000
|
$700.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$70,000.000
|
$35,000.000
|
|
|
REMOV STR (CATTLE GUARD)
|
EA
|
1.000
|
$800.000
|
$700.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$198,760.000
|
$350,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
12.000
|
$5,000.000
|
$2,500.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
120.000
|
$29.000
|
$50.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
120.000
|
$11.000
|
$8.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 2)
|
SY
|
312.000
|
$25.000
|
$45.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
312.000
|
$10.000
|
$8.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
2,006.000
|
$3.000
|
$3.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,006.000
|
$1.000
|
$1.200
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
505.000
|
$4.000
|
$6.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
505.000
|
$1.000
|
$1.200
|
|
|
CONSTRUCTING DETOURS
|
SY
|
5,824.000
|
$67.000
|
$170.000
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
2,100.000
|
$35.000
|
$40.000
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
900.000
|
$5.000
|
$10.000
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
2,100.000
|
$10.000
|
$8.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
850.000
|
$30.000
|
$45.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,925.000
|
$22.000
|
$30.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$1,750.000
|
$2,000.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,950.000
|
$3.000
|
$2.500
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
8.000
|
$2,600.000
|
$3,350.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
8.000
|
$275.000
|
$300.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$2,300.000
|
$1,500.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
6.000
|
$1,000.000
|
$650.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
6.000
|
$11,500.000
|
$8,000.000
|
|
|
WIRE FENCE (TY A)
|
LF
|
3,322.000
|
$15.000
|
$6.500
|
|
|
GATE (TY 1)
|
EA
|
6.000
|
$1,500.000
|
$720.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
3.000
|
$420.000
|
$700.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
2.000
|
$660.000
|
$820.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
8.000
|
$30.000
|
$45.000
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
2.000
|
$65.000
|
$65.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
10.000
|
$40.000
|
$32.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
169.000
|
$4.000
|
$8.500
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
6,672.000
|
$1.000
|
$1.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
6,672.000
|
$1.000
|
$1.000
|
|
REFL PAV MRK TY II (W) 4" (SLD)
|
LF
|
6,800.000
|
$1.000
|
$0.600
|
|
REFL PAV MRK TY II (Y) 4" (BRK)
|
LF
|
850.000
|
$0.500
|
$0.600
|
|
REFL PAV MRK TY II (Y) 4" (SLD)
|
LF
|
100.000
|
$0.500
|
$0.600
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
43.000
|
$3.000
|
$12.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
4,696.000
|
$0.500
|
$1.200
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
7,750.000
|
$0.100
|
$1.000
|
|
|
SP MIXES SP-B SAC-B PG70-22
|
TON
|
1,137.000
|
$130.000
|
$120.000
|
|
|
SP MIXES SP-D SAC-B PG70-22
|
TON
|
550.000
|
$135.000
|
$130.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$6,000.000
|
$20,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
366.000
|
$95.000
|
$45.000
|
|
Totals: |
$2,728,256.750
|
$3,778,141.900
|