PREPARING ROW
|
STA
|
276.600
|
$500.000
|
$450.000
|
$400.000
|
$365.000
|
$2,100.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
748.000
|
$14.240
|
$18.000
|
$20.000
|
$10.400
|
$12.590
|
|
|
REMOVING STAB BASE AND ASPH PAV (6")
|
SY
|
7,268.000
|
$3.250
|
$3.500
|
$7.000
|
$3.500
|
$3.430
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
2,517.000
|
$15.000
|
$14.000
|
$21.000
|
$24.850
|
$21.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
9,331.000
|
$12.000
|
$12.000
|
$9.500
|
$31.850
|
$21.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
62,802.000
|
$1.500
|
$1.250
|
$0.900
|
$1.050
|
$1.050
|
|
|
BROADCAST SEED (PERM) (RURAL) (SANDY)
|
AC
|
13.020
|
$1,000.000
|
$800.000
|
$460.000
|
$445.000
|
$425.000
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
AC
|
6.550
|
$1,000.000
|
$1,100.000
|
$370.000
|
$390.000
|
$125.000
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
AC
|
6.550
|
$1,000.000
|
$1,100.000
|
$432.000
|
$390.000
|
$125.000
|
|
|
VEGETATIVE WATERING
|
MG
|
2,206.100
|
$15.000
|
$16.000
|
$18.600
|
$21.000
|
$3.000
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
13,922.000
|
$70.000
|
$76.000
|
$75.000
|
$88.050
|
$75.000
|
|
|
D-GR HMA TY-D SAC-B PG70-28
|
TON
|
13,777.000
|
$85.000
|
$93.000
|
$80.000
|
$85.650
|
$90.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
3,023.000
|
$60.000
|
$44.000
|
$44.500
|
$62.000
|
$50.000
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
418.000
|
$75.000
|
$45.000
|
$123.750
|
$55.000
|
$98.490
|
|
|
TEMPORARY SPL SHORING
|
SF
|
1,866.000
|
$45.000
|
$84.000
|
$31.000
|
$18.900
|
$50.000
|
|
|
RIPRAP (CONC)(CL B)(5 IN)
|
CY
|
14.000
|
$500.000
|
$525.000
|
$568.000
|
$409.000
|
$735.000
|
|
|
RIPRAP (STONE TY R)(DRY)(6 IN)
|
CY
|
106.000
|
$111.510
|
$170.000
|
$93.000
|
$235.000
|
$157.500
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
60.000
|
$550.000
|
$520.000
|
$568.000
|
$435.550
|
$630.000
|
|
|
CMP (GAL STL 18 IN)
|
LF
|
84.000
|
$67.000
|
$40.000
|
$52.000
|
$47.800
|
$117.840
|
|
|
CMP (GAL STL 24 IN)
|
LF
|
24.000
|
$82.000
|
$50.000
|
$93.000
|
$57.800
|
$124.250
|
|
|
CONC BOX CULV (4 FT X 4 FT)
|
LF
|
32.000
|
$250.000
|
$300.000
|
$464.000
|
$361.000
|
$319.790
|
|
|
CONC BOX CULV (5 FT X 3 FT)
|
LF
|
23.000
|
$300.000
|
$320.000
|
$490.000
|
$439.000
|
$381.630
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
804.000
|
$55.000
|
$45.000
|
$57.000
|
$53.350
|
$93.250
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
468.000
|
$70.000
|
$57.000
|
$99.000
|
$78.900
|
$125.520
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
120.000
|
$82.110
|
$71.000
|
$124.000
|
$97.000
|
$182.280
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
88.000
|
$110.000
|
$92.000
|
$150.000
|
$128.000
|
$275.450
|
|
|
RC PIPE (CL III)(54 IN)
|
LF
|
308.000
|
$191.450
|
$175.000
|
$258.000
|
$251.000
|
$408.150
|
|
|
RC PIPE (CL III)(60 IN)
|
LF
|
171.000
|
$250.000
|
$205.000
|
$336.000
|
$297.000
|
$639.320
|
|
|
RC PIPE (CL IV)(36 IN)
|
LF
|
67.000
|
$130.000
|
$115.000
|
$171.000
|
$145.000
|
$234.870
|
|
|
INLET(COMPL)(DROP)(TY 1)(1 GRATE)
|
EA
|
1.000
|
$4,344.250
|
$4,950.000
|
$3,610.000
|
$6,550.000
|
$4,022.850
|
|
|
HEADWALL (CH - FW - 15) (DIA= 60 IN)
|
EA
|
2.000
|
$13,000.000
|
$13,000.000
|
$12,375.000
|
$10,410.000
|
$23,095.120
|
|
|
HEADWALL (CH - FW - 45) (DIA= 36 IN)
|
EA
|
2.000
|
$11,000.000
|
$8,500.000
|
$6,705.000
|
$10,240.000
|
$15,247.710
|
|
|
HEADWALL (CH - PW - 0) (DIA= 24 IN)
|
EA
|
1.000
|
$4,728.000
|
$4,000.000
|
$3,095.000
|
$8,700.000
|
$9,646.650
|
|
|
HEADWALL (CH - PW - 0) (DIA= 30 IN)
|
EA
|
6.000
|
$6,003.530
|
$5,000.000
|
$4,700.000
|
$9,115.000
|
$10,872.510
|
|
|
HEADWALL (CH - PW - 0) (DIA= 36 IN)
|
EA
|
2.000
|
$7,037.820
|
$3,200.000
|
$6,705.000
|
$9,720.000
|
$14,472.740
|
|
|
HEADWALL (CH - PW - 0) (DIA= 54 IN)
|
EA
|
2.000
|
$8,040.910
|
$16,000.000
|
$25,775.000
|
$11,860.000
|
$34,690.900
|
|
|
HEADWALL (CH - PW - 0) (DIA= 60 IN)
|
EA
|
6.000
|
$10,683.540
|
$8,250.000
|
$25,775.000
|
$12,910.000
|
$23,574.000
|
|
|
HEADWALL (CH - PW - S) (DIA= 36 IN)
|
EA
|
2.000
|
$8,218.330
|
$3,700.000
|
$6,705.000
|
$8,785.000
|
$13,891.680
|
|
|
HEADWALL (CH - PW - S) (DIA= 60 IN)
|
EA
|
6.000
|
$12,753.570
|
$10,500.000
|
$25,775.000
|
$14,700.000
|
$31,634.330
|
|
|
SET (TY I)(S= 6 FT)(HW= 3 FT)(6:1) (P)
|
EA
|
2.000
|
$11,000.000
|
$13,250.000
|
$7,735.000
|
$13,426.000
|
$17,998.590
|
|
|
SET (TY I)(S= 6 FT)(HW= 4 FT)(6:1) (P)
|
EA
|
2.000
|
$9,325.000
|
$19,500.000
|
$9,300.000
|
$16,020.000
|
$18,258.030
|
|
|
SET (TY II) (15 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$565.330
|
$730.000
|
$675.000
|
$1,000.000
|
$975.590
|
|
|
SET (TY II) (18 IN) (CMP) (6: 1) (P)
|
EA
|
21.000
|
$1,093.100
|
$800.000
|
$722.000
|
$1,055.000
|
$1,075.910
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (C)
|
EA
|
8.000
|
$796.130
|
$650.000
|
$722.000
|
$1,027.000
|
$847.600
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
83.000
|
$750.000
|
$740.000
|
$722.000
|
$1,027.000
|
$992.890
|
|
|
SET (TY II) (24 IN) (CMP) (6: 1) (P)
|
EA
|
10.000
|
$1,380.000
|
$975.000
|
$880.000
|
$1,244.000
|
$1,378.600
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
9.000
|
$1,146.330
|
$740.000
|
$825.000
|
$1,166.000
|
$1,015.370
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
26.000
|
$1,190.000
|
$890.000
|
$880.000
|
$1,195.000
|
$1,248.880
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (P)
|
EA
|
6.000
|
$3,780.000
|
$1,750.000
|
$3,095.000
|
$3,890.000
|
$2,805.740
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
4.000
|
$1,100.000
|
$3,500.000
|
$1,035.000
|
$1,666.000
|
$1,396.670
|
|
|
REMOV STR (SET)
|
EA
|
17.000
|
$361.630
|
$400.000
|
$570.000
|
$333.000
|
$315.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
18.000
|
$1,085.710
|
$1,250.000
|
$780.000
|
$1,092.000
|
$2,100.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
2.000
|
$1,831.050
|
$1,100.000
|
$780.000
|
$1,093.000
|
$1,155.000
|
|
|
REMOV STR (PIPE)
|
LF
|
648.000
|
$12.930
|
$16.000
|
$20.750
|
$13.500
|
$11.550
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
21.000
|
$69.940
|
$65.000
|
$103.100
|
$61.000
|
$210.000
|
|
|
REMOV STR (RET WALL)
|
LF
|
91.000
|
$15.000
|
$60.000
|
$30.000
|
$17.000
|
$50.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$509,454.970
|
$550,000.000
|
$589,300.000
|
$673,040.000
|
$650,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
14.000
|
$13,850.000
|
$11,500.000
|
$23,000.000
|
$35,400.000
|
$21,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
80.000
|
$24.770
|
$25.000
|
$28.000
|
$29.450
|
$28.740
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
595.000
|
$70.640
|
$46.000
|
$69.350
|
$66.650
|
$31.350
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
675.000
|
$8.820
|
$5.000
|
$12.000
|
$11.000
|
$13.060
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
778.000
|
$13.750
|
$15.000
|
$25.350
|
$21.250
|
$20.900
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
778.000
|
$7.000
|
$6.000
|
$7.500
|
$10.000
|
$8.360
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
2,950.000
|
$2.290
|
$3.000
|
$1.900
|
$5.850
|
$1.830
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,950.000
|
$0.730
|
$1.000
|
$0.400
|
$0.650
|
$0.520
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
1,600.000
|
$6.000
|
$5.000
|
$5.300
|
$6.400
|
$5.490
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,600.000
|
$1.000
|
$1.000
|
$0.430
|
$1.100
|
$1.570
|
|
|
CONSTRUCTING DETOURS
|
SY
|
4,349.000
|
$84.950
|
$40.000
|
$55.350
|
$73.200
|
$50.000
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
6.000
|
$6,000.000
|
$1,000.000
|
$5,600.000
|
$4,725.000
|
$2,500.000
|
|
|
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
|
LF
|
390.000
|
$15.000
|
$15.500
|
$25.000
|
$22.750
|
$9.000
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
3,150.000
|
$8.000
|
$12.000
|
$20.000
|
$26.150
|
$4.000
|
|
|
PORT CTB (STKPL)(F-SHAPE)(TY 1)
|
LF
|
390.000
|
$15.000
|
$15.500
|
$23.500
|
$21.500
|
$4.000
|
|
|
INTERSECTIONS (ACP)
|
SY
|
1,781.000
|
$30.000
|
$27.000
|
$16.100
|
$14.400
|
$22.990
|
|
|
DRIVEWAYS (CONC)
|
SY
|
486.000
|
$80.000
|
$68.000
|
$111.000
|
$100.000
|
$126.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
531.000
|
$50.000
|
$27.000
|
$45.500
|
$50.000
|
$49.000
|
|
|
TURNOUTS (ACP)
|
SY
|
1,003.000
|
$57.000
|
$52.000
|
$71.350
|
$60.800
|
$47.030
|
|
|
DRIVEWAYS (BASE)
|
SY
|
2,138.000
|
$22.000
|
$13.000
|
$22.500
|
$16.750
|
$33.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
725.000
|
$21.130
|
$22.000
|
$23.000
|
$22.200
|
$20.900
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
225.000
|
$4.430
|
$3.000
|
$3.000
|
$2.800
|
$3.140
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
10.000
|
$2,300.000
|
$2,600.000
|
$2,715.000
|
$2,555.000
|
$2,325.130
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$500.000
|
$300.000
|
$100.000
|
$222.000
|
$261.250
|
|
|
CRASH CUSH ATTEN (INSTL)
|
EA
|
10.000
|
$11,432.580
|
$12,750.000
|
$8,000.000
|
$7,800.000
|
$7,350.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
94.000
|
$2,049.640
|
$2,100.000
|
$500.000
|
$1,500.000
|
$441.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
10.000
|
$704.010
|
$2,300.000
|
$800.000
|
$667.000
|
$389.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
30.000
|
$210.000
|
$250.000
|
$225.000
|
$250.000
|
$235.130
|
|
|
MAILBOX INSTALL-D (TWW-POST) TY 4
|
EA
|
16.000
|
$260.000
|
$250.000
|
$245.000
|
$250.000
|
$256.030
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
9.000
|
$520.000
|
$550.000
|
$595.000
|
$555.550
|
$621.780
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
50.000
|
$460.000
|
$475.000
|
$450.000
|
$472.250
|
$470.250
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
6.000
|
$828.580
|
$500.000
|
$575.000
|
$500.000
|
$600.880
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
4.000
|
$755.120
|
$750.000
|
$695.000
|
$750.000
|
$726.280
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
46.000
|
$75.000
|
$50.000
|
$45.000
|
$50.000
|
$47.030
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
16.000
|
$50.000
|
$30.000
|
$27.000
|
$28.000
|
$20.900
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
108,826.000
|
$0.250
|
$0.220
|
$0.220
|
$0.220
|
$0.210
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
53,770.000
|
$0.250
|
$0.220
|
$0.220
|
$0.220
|
$0.210
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
3,336.000
|
$0.400
|
$1.100
|
$1.060
|
$1.110
|
$1.050
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
120.000
|
$11.080
|
$9.000
|
$8.410
|
$8.900
|
$8.360
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
2,622.000
|
$0.900
|
$1.240
|
$1.050
|
$0.950
|
$2.040
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
496.000
|
$0.550
|
$1.100
|
$1.060
|
$1.100
|
$1.050
|
|
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
|
LF
|
227.000
|
$5.800
|
$6.000
|
$5.470
|
$5.800
|
$5.430
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
4.000
|
$99.000
|
$165.000
|
$157.540
|
$167.000
|
$156.750
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
4.000
|
$125.000
|
$165.000
|
$157.540
|
$167.000
|
$156.750
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
54,561.000
|
$0.300
|
$0.420
|
$0.410
|
$0.420
|
$0.400
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
|
LF
|
2,482.000
|
$0.200
|
$0.510
|
$0.490
|
$0.510
|
$0.480
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
40,305.000
|
$0.230
|
$0.420
|
$0.410
|
$0.420
|
$0.400
|
|
REFL PAV MRKR TY I-C
|
EA
|
25.000
|
$3.290
|
$5.000
|
$4.210
|
$4.440
|
$4.180
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
673.000
|
$5.000
|
$4.000
|
$3.690
|
$3.900
|
$3.660
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,000.000
|
$14,000.000
|
$28,795.000
|
$8,000.000
|
$13,650.000
|
|
|
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
|
LF
|
120.000
|
$3.080
|
$16.500
|
$15.800
|
$16.700
|
$15.680
|
|
|
TMA (STATIONARY)
|
DAY
|
451.000
|
$180.070
|
$285.000
|
$155.000
|
$325.000
|
$315.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
424.000
|
$47.200
|
$90.000
|
$21.050
|
$22.250
|
$20.900
|
|
Totals: |
$5,796,804.700
|
$5,771,223.240
|
$5,895,587.920
|
$6,731,443.870
|
$6,969,491.310
|