JOHNSON FM 2258 (1599-03-017)

Items: 115

County: JOHNSON
Length: N/A
Highway: FM 2258
District: FORT WORTH
Control Number: 1599-03-017
DBE Goal: 0.0%
Project: C 1599-3-17
Guaranty: N/A
Time: 384 WORKING DAYS
Engineer's Estimate: $11,659,060.18
Date: 05/02/2024 (2 years ago)
Contract Number: N/A
Type: REHABILITATE EXISTING ROADWAY
Mail/Deliver Bids To: N/A
DANIEL POOLE
SUCHITA POTTA
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$11,659,060.18
$14,018,177.61
Over/Under Est: 20.23% $2,359,117.43
Over/Under Est: 25.97% $3,027,641.79
Amt Left: 4.77% $668,524.36
Over/Under Est: 37.02% $4,316,379.22
Amt Left: 13.96% $1,957,261.79
Delta: -8.77% -$1,288,737.43
Over/Under Est: 43.74% $5,099,885.72
Amt Left: 19.55% $2,740,768.29
Delta: -4.90% -$783,506.50
Subcontractor Percentage Amount
NORTHEASTERN PAVERS, LLC 18.25% $2,554,263.99
JR WEST TEXAS CONCRETE LLC 4.63% $648,013.28
J. H. ODEN CONTRACTING COMPANY 0.98% $137,160.48
TRP CONSTRUCTION GROUP, LLC 0.35% $48,985.88
MURRAY CONSTRUCTION 0.22% $30,791.13
FORTSON CONTRACTING, INC. 0.11% $15,395.56
WEST TEXAS ROCK RESOURCES, LLC 0.05% $6,997.98
Total: 24.59% $3,441,608.30

Bid Items & Bid Tabulations

115 Total 0 of 115
JOHNSON  |  FM 2258  |  FORT WORTH  |  1599-03-017  |  05/02/2024  |  $11,659,060.18  |  C 1599-3-17  |  REHAB EXIST ROADWAY  |  384 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
JAY MILLS CONTRACTING, INCORPORATED
TEXAS MATERIALS GROUP, INC.
KNIFE RIVER CORPORATION - SOUTH
ED BELL CONSTRUCTION COMPANY
PREPARING ROW
STA 155.400 $1,000.000 $5,200.000 $1,100.000 $1,800.000 $6,075.000
REMOVING CONC (DRIVEWAYS)
SY 252.000 $29.190 $20.000 $32.000 $48.500 $50.000
REMOVE STAB BASE & ASPH PAV (13"-18")
SY 41,180.000 $6.180 $17.500 $11.750 $10.250 $12.600
EXCAVATION (ROADWAY)
CY 7,207.000 $32.130 $40.000 $45.000 $18.000 $31.500
EMBANKMENT (FINAL)(DENS CONT)(TY D)
CY 6,508.000 $26.000 $40.000 $50.000 $21.000 $21.000
EMBANKMENT (VEHICLE)(DENS CONT)(TY B)
CY 161.000 $32.000 $65.000 $125.000 $102.000 $73.500
BACKFILL (TY B)
STA 155.000 $252.050 $265.000 $440.000 $415.000 $420.000
COMPOST MANUF TOPSOIL (4")
SY 77,221.000 $3.670 $6.500 $6.250 $12.750 $7.350
BLOCK SODDING
SY 38.000 $9.010 $12.400 $11.380 $13.400 $21.000
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 77,221.000 $0.180 $0.200 $0.180 $0.210 $0.210
BROADCAST SEED (TEMP) (WARM)
SY 38,611.000 $0.180 $0.170 $0.150 $0.180 $0.160
BROADCAST SEED (TEMP) (COOL)
SY 38,611.000 $0.180 $0.170 $0.150 $0.180 $0.160
DRILL SEED (TEMP)(WARM OR COOL)
SY 77,221.000 $0.240 $0.180 $0.160 $0.190 $0.170
DRILL SEEDING (PERM)(WARM OR COOL)
SY 77,221.000 $0.240 $0.210 $0.190 $0.230 $0.210
VEGETATIVE WATERING
MG 5,404.690 $47.500 $21.000 $61.390 $5.000 $15.750
WILDFLOWER SEEDING
AC 16.100 $1,500.000 $1,800.000 $1,635.000 $1,925.000 $1,785.000
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 9,218.000 $176.130 $98.000 $102.990 $101.000 $157.500
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
TON 3,433.000 $422.720 $345.500 $320.000 $384.000 $420.000
LIME TRT (EXIST MATL)(18")
SY 71,522.000 $6.750 $13.000 $10.150 $16.000 $18.000
PRIME COAT (MULTI OPTION)
GAL 20,440.000 $4.750 $5.850 $8.000 $5.100 $10.400
EMULS ASPH (EROSN CONT)(MULTI)
GAL 1,399.000 $7.510 $10.000 $8.000 $6.650 $11.500
ASPH (AC-10)
GAL 38,155.000 $5.310 $7.000 $5.000 $6.450 $4.690
AGGR(TY-PB GR-4 SAC-B)
CY 505.000 $277.080 $200.000 $500.000 $390.000 $495.230
CEM STABIL BKFL
CY 49.000 $250.650 $185.000 $350.000 $624.000 $315.000
CUT & RESTORING PAV
SY 120.000 $176.810 $350.000 $100.000 $114.000 $210.000
TRENCH EXCAVATION PROTECTION
LF 94.000 $22.620 $3.000 $1.000 $19.000 $52.500
TEMPORARY SPL SHORING
SF 2,569.000 $44.620 $88.000 $25.000 $41.600 $73.500
CL B CONC (MISC)
CY 5.000 $1,521.210 $800.000 $720.000 $3,875.000 $2,625.000
RIPRAP (CONC)(5 IN)
CY 15.000 $774.920 $800.000 $720.000 $1,238.000 $1,575.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 221.000 $222.580 $200.000 $180.000 $444.000 $315.000
RIPRAP (MOW STRIP)(4 IN)
CY 35.000 $718.140 $800.000 $720.000 $1,270.000 $945.000
CONC BOX CULV (5 FT X 4 FT)
LF 86.000 $643.020 $670.000 $430.000 $1,152.000 $945.000
CONC BOX CULV (6 FT X 4 FT)
LF 70.000 $646.210 $577.500 $525.000 $1,280.000 $1,050.000
RC PIPE (CL III)(18 IN)
LF 319.000 $101.780 $130.000 $58.000 $235.000 $126.000
RC PIPE (CL III)(24 IN)
LF 35.000 $137.580 $115.000 $74.000 $287.000 $252.000
RC PIPE (CL III)(36 IN)
LF 32.000 $224.390 $170.000 $103.000 $390.000 $210.000
RC PIPE (CL III)(42 IN)
LF 120.000 $261.530 $405.000 $168.000 $546.000 $420.000
RC PIPE (CL V)(30 IN)
LF 45.000 $314.490 $375.000 $92.000 $427.000 $262.500
HEADWALL (CH - FW - 0) (DIA= 24 IN)
EA 1.000 $12,731.740 $4,400.000 $4,000.000 $15,110.000 $8,400.000
HEADWALL (CH - FW - 30) (DIA= 42 IN)
EA 1.000 $15,006.900 $7,150.000 $6,500.000 $19,500.000 $15,750.000
HEADWALL (CH - PW - S) (DIA= 42 IN)
EA 1.000 $13,348.040 $15,400.000 $14,000.000 $22,205.000 $18,900.000
WINGWALL (PW - 2) (HW=6 FT)
EA 2.000 $20,982.370 $17,875.000 $16,250.000 $21,156.000 $21,000.000
WINGWALL (PW - 2) (HW=7 FT)
EA 1.000 $28,209.320 $27,500.000 $25,000.000 $31,440.000 $27,300.000
WINGWALL (PW - 2) (HW=8 FT)
EA 2.000 $33,396.280 $33,000.000 $60,000.000 $39,862.000 $36,750.000
WINGWALL (PW - 2) (HW=9 FT)
EA 1.000 $37,475.000 $52,800.000 $48,000.000 $57,584.000 $57,750.000
SET (TY II) (18 IN) (RCP) (3: 1) (C)
EA 1.000 $1,436.780 $1,000.000 $950.000 $1,869.000 $4,200.000
SET (TY II) (18 IN) (RCP) (4: 1) (C)
EA 3.000 $1,474.360 $1,200.000 $1,035.000 $2,030.000 $4,410.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 18.000 $1,654.990 $1,400.000 $1,300.000 $2,453.000 $1,890.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 1.000 $2,205.260 $1,500.000 $1,325.000 $2,504.000 $5,250.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 8.000 $2,606.550 $1,750.000 $1,620.000 $2,984.000 $2,467.500
SET (TY II) (30 IN) (RCP) (4: 1) (C)
EA 2.000 $3,138.740 $2,200.000 $2,000.000 $3,463.000 $6,300.000
SET (TY II) (36 IN) (RCP) (6: 1) (P)
EA 2.000 $6,334.270 $6,200.000 $5,600.000 $7,213.000 $10,500.000
CLEAN EXIST CULVERTS
EA 16.000 $4,897.900 $2,200.000 $2,000.000 $6,725.000 $1,050.000
REMOV STR (SET)
EA 6.000 $1,282.580 $475.000 $200.000 $1,717.000 $420.000
REMOV STR (WINGWALL)
EA 4.000 $2,658.580 $1,100.000 $1,000.000 $2,288.000 $8,400.000
REMOV STR (HEADWALL)
EA 2.000 $2,205.290 $1,100.000 $1,000.000 $2,290.000 $2,625.000
REMOV STR (PIPE)
LF 494.000 $60.700 $20.000 $10.000 $17.800 $73.500
REMOV STR (BOX CULVERT)
LF 35.000 $142.480 $110.000 $100.000 $230.000 $2,100.000
MOBILIZATION
LS 1.000 $1,059,914.560 $1,400,000.000 $1,450,000.000 $1,597,490.000 $1,650,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 18.000 $11,500.000 $20,000.000 $50,000.000 $69,000.000 $63,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 440.000 $38.000 $60.000 $52.360 $62.000 $82.500
ROCK FILTER DAMS (REMOVE)
LF 440.000 $17.000 $28.000 $24.830 $30.000 $55.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 3,094.000 $2.900 $5.500 $4.900 $8.750 $3.140
TEMP SEDMT CONT FENCE (REMOVE)
LF 3,094.000 $0.850 $2.000 $1.700 $2.000 $1.100
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 1,720.000 $6.000 $7.500 $6.600 $7.850 $5.500
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,720.000 $1.020 $2.000 $1.700 $2.000 $2.750
CONSTRUCTING DETOURS
SY 3,893.000 $140.000 $180.000 $120.000 $94.000 $150.000
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 6.000 $5,500.000 $7,500.000 $30,000.000 $13,000.000 $11,550.000
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 4,900.000 $60.000 $90.000 $50.000 $115.750 $100.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 480.000 $65.000 $83.000 $50.000 $146.500 $120.000
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 31,360.000 $11.000 $15.000 $24.000 $21.950 $20.000
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 3,442.000 $15.000 $15.000 $33.000 $16.250 $50.000
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 4,900.000 $10.000 $14.000 $20.000 $41.800 $15.000
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 480.000 $10.000 $14.000 $20.000 $42.150 $35.000
DRIVEWAYS (ACP)(TYPE 1)
SY 44.000 $87.000 $452.000 $360.000 $375.000 $160.000
DRIVEWAYS (CONC)(TYPE 1)
SY 297.000 $117.660 $142.000 $155.000 $760.000 $250.000
DRIVEWAYS (ACP) (TYPE 2)
SY 804.000 $70.000 $145.000 $145.000 $370.000 $100.000
INTERSECTIONS (ACP) (TYPE 2)
SY 447.000 $60.000 $200.000 $175.000 $372.000 $90.000
RUMBLE STRIPS (SHOULDER)
LF 30,259.000 $0.320 $0.130 $0.250 $0.320 $0.300
RUMBLE STRIPS (CENTERLINE)
LF 13,827.000 $0.320 $0.300 $0.250 $0.320 $0.150
MTL W-BEAM GD FEN (TIM POST)
LF 338.000 $28.810 $24.750 $40.000 $26.750 $29.820
REMOVE METAL BEAM GUARD FENCE
LF 130.000 $4.360 $5.550 $5.000 $3.000 $5.330
REMOVE TERMINAL ANCHOR SECTION
EA 2.000 $328.810 $560.000 $300.000 $150.000 $319.500
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $3,457.820 $3,200.000 $3,300.000 $3,420.000 $3,514.500
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 13.000 $296.710 $335.000 $300.000 $356.000 $266.250
MAILBOX INSTALL-D (TWW-POST) TY 4
EA 3.000 $323.670 $390.000 $350.000 $416.000 $276.900
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 19.000 $900.000 $665.000 $600.000 $713.000 $654.980
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 3.000 $900.000 $720.000 $650.000 $773.000 $772.130
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 4.000 $1,100.000 $990.000 $950.000 $1,070.000 $1,183.220
IN SM RD SN SUP&AM TYS80(1)SA(U-EXAL)
EA 1.000 $1,500.000 $1,045.000 $950.000 $1,230.000 $1,312.080
REMOVE SM RD SN SUP&AM
EA 22.000 $447.500 $82.500 $75.000 $89.000 $106.500
INSTL OM ASSM (OM-2Y)(WC)GND
EA 32.000 $87.550 $49.500 $75.000 $89.000 $74.550
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 990.000 $0.300 $0.460 $0.420 $0.830 $2.500
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
LF 2,952.000 $0.500 $0.550 $0.500 $0.830 $1.750
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 6,778.000 $0.300 $0.470 $0.430 $0.830 $1.500
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 576.000 $22.000 $7.430 $6.750 $4.030 $40.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 1,562.000 $2.000 $1.600 $0.820 $1.080 $5.250
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 1,560.000 $1.000 $1.600 $0.820 $1.080 $5.250
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 1,554.000 $1.000 $1.600 $0.820 $1.080 $5.250
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 31,164.000 $1.130 $0.750 $0.680 $1.190 $1.000
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
LF 1,500.000 $1.030 $0.850 $0.770 $1.190 $1.400
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 22,008.000 $1.320 $0.750 $0.680 $1.190 $1.000
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 57.000 $17.850 $16.780 $15.250 $16.650 $52.800
REFL PAV MRKR TY II-A-A
EA 353.000 $8.010 $5.010 $4.550 $5.040 $11.000
ELIM EXT PAV MRK & MRKS (4")
LF 2,952.000 $1.000 $0.440 $0.400 $0.570 $6.300
D-GR HMA TY-C PG64-22
TON 7,200.000 $123.000 $148.500 $195.000 $165.000 $167.210
SP MIXES SP-C SAC-A PG70-28
TON 7,200.000 $162.560 $192.500 $205.000 $172.000 $171.470
TACK COAT
GAL 12,521.000 $9.570 $0.010 $3.000 $6.340 $3.730
STEEL FENCE (REMOVE)
LF 60.000 $30.000 $20.000 $52.000 $66.000 $53.250
STEEL FENCE (INSTALL)
LF 60.000 $150.000 $200.000 $200.000 $437.000 $213.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $8,260.000 $22,000.000 $14,850.000 $12,000.000 $8,800.000
TMA (STATIONARY)
DAY 116.000 $168.000 $220.000 $2,100.000 $360.000 $220.000
TMA (MOBILE OPERATION)
DAY 15.000 $104.000 $220.000 $2,000.000 $1,035.000 $1,100.000
SOLAR POWERED LED ROADSIDE SIGN
EA 2.000 $7,285.000 $3,520.000 $3,200.000 $3,802.000 $2,369.630
DRIVEWAY ASSISTANCE DEVICE(DAD) SYSTEM
MO 8.000 $10,000.000 $14,000.000 $50,000.000 $19,200.000 $17,850.000
Totals: $11,659,060.185 $14,018,177.610 $14,686,701.979 $15,975,439.400 $16,758,945.908