PREPARING ROW
|
STA
|
155.400
|
$1,000.000
|
$5,200.000
|
$1,100.000
|
$1,800.000
|
$6,075.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
252.000
|
$29.190
|
$20.000
|
$32.000
|
$48.500
|
$50.000
|
|
|
REMOVE STAB BASE & ASPH PAV (13"-18")
|
SY
|
41,180.000
|
$6.180
|
$17.500
|
$11.750
|
$10.250
|
$12.600
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
7,207.000
|
$32.130
|
$40.000
|
$45.000
|
$18.000
|
$31.500
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY D)
|
CY
|
6,508.000
|
$26.000
|
$40.000
|
$50.000
|
$21.000
|
$21.000
|
|
|
EMBANKMENT (VEHICLE)(DENS CONT)(TY B)
|
CY
|
161.000
|
$32.000
|
$65.000
|
$125.000
|
$102.000
|
$73.500
|
|
|
BACKFILL (TY B)
|
STA
|
155.000
|
$252.050
|
$265.000
|
$440.000
|
$415.000
|
$420.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
77,221.000
|
$3.670
|
$6.500
|
$6.250
|
$12.750
|
$7.350
|
|
|
BLOCK SODDING
|
SY
|
38.000
|
$9.010
|
$12.400
|
$11.380
|
$13.400
|
$21.000
|
|
|
BROADCAST SEED (PERM) (RURAL) (CLAY)
|
SY
|
77,221.000
|
$0.180
|
$0.200
|
$0.180
|
$0.210
|
$0.210
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
38,611.000
|
$0.180
|
$0.170
|
$0.150
|
$0.180
|
$0.160
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
38,611.000
|
$0.180
|
$0.170
|
$0.150
|
$0.180
|
$0.160
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
77,221.000
|
$0.240
|
$0.180
|
$0.160
|
$0.190
|
$0.170
|
|
|
DRILL SEEDING (PERM)(WARM OR COOL)
|
SY
|
77,221.000
|
$0.240
|
$0.210
|
$0.190
|
$0.230
|
$0.210
|
|
|
VEGETATIVE WATERING
|
MG
|
5,404.690
|
$47.500
|
$21.000
|
$61.390
|
$5.000
|
$15.750
|
|
|
WILDFLOWER SEEDING
|
AC
|
16.100
|
$1,500.000
|
$1,800.000
|
$1,635.000
|
$1,925.000
|
$1,785.000
|
|
|
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
|
CY
|
9,218.000
|
$176.130
|
$98.000
|
$102.990
|
$101.000
|
$157.500
|
|
|
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
|
TON
|
3,433.000
|
$422.720
|
$345.500
|
$320.000
|
$384.000
|
$420.000
|
|
|
LIME TRT (EXIST MATL)(18")
|
SY
|
71,522.000
|
$6.750
|
$13.000
|
$10.150
|
$16.000
|
$18.000
|
|
|
PRIME COAT (MULTI OPTION)
|
GAL
|
20,440.000
|
$4.750
|
$5.850
|
$8.000
|
$5.100
|
$10.400
|
|
|
EMULS ASPH (EROSN CONT)(MULTI)
|
GAL
|
1,399.000
|
$7.510
|
$10.000
|
$8.000
|
$6.650
|
$11.500
|
|
|
ASPH (AC-10)
|
GAL
|
38,155.000
|
$5.310
|
$7.000
|
$5.000
|
$6.450
|
$4.690
|
|
|
AGGR(TY-PB GR-4 SAC-B)
|
CY
|
505.000
|
$277.080
|
$200.000
|
$500.000
|
$390.000
|
$495.230
|
|
|
CEM STABIL BKFL
|
CY
|
49.000
|
$250.650
|
$185.000
|
$350.000
|
$624.000
|
$315.000
|
|
|
CUT & RESTORING PAV
|
SY
|
120.000
|
$176.810
|
$350.000
|
$100.000
|
$114.000
|
$210.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
94.000
|
$22.620
|
$3.000
|
$1.000
|
$19.000
|
$52.500
|
|
|
TEMPORARY SPL SHORING
|
SF
|
2,569.000
|
$44.620
|
$88.000
|
$25.000
|
$41.600
|
$73.500
|
|
|
CL B CONC (MISC)
|
CY
|
5.000
|
$1,521.210
|
$800.000
|
$720.000
|
$3,875.000
|
$2,625.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
15.000
|
$774.920
|
$800.000
|
$720.000
|
$1,238.000
|
$1,575.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
221.000
|
$222.580
|
$200.000
|
$180.000
|
$444.000
|
$315.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
35.000
|
$718.140
|
$800.000
|
$720.000
|
$1,270.000
|
$945.000
|
|
|
CONC BOX CULV (5 FT X 4 FT)
|
LF
|
86.000
|
$643.020
|
$670.000
|
$430.000
|
$1,152.000
|
$945.000
|
|
|
CONC BOX CULV (6 FT X 4 FT)
|
LF
|
70.000
|
$646.210
|
$577.500
|
$525.000
|
$1,280.000
|
$1,050.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
319.000
|
$101.780
|
$130.000
|
$58.000
|
$235.000
|
$126.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
35.000
|
$137.580
|
$115.000
|
$74.000
|
$287.000
|
$252.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
32.000
|
$224.390
|
$170.000
|
$103.000
|
$390.000
|
$210.000
|
|
|
RC PIPE (CL III)(42 IN)
|
LF
|
120.000
|
$261.530
|
$405.000
|
$168.000
|
$546.000
|
$420.000
|
|
|
RC PIPE (CL V)(30 IN)
|
LF
|
45.000
|
$314.490
|
$375.000
|
$92.000
|
$427.000
|
$262.500
|
|
|
HEADWALL (CH - FW - 0) (DIA= 24 IN)
|
EA
|
1.000
|
$12,731.740
|
$4,400.000
|
$4,000.000
|
$15,110.000
|
$8,400.000
|
|
|
HEADWALL (CH - FW - 30) (DIA= 42 IN)
|
EA
|
1.000
|
$15,006.900
|
$7,150.000
|
$6,500.000
|
$19,500.000
|
$15,750.000
|
|
|
HEADWALL (CH - PW - S) (DIA= 42 IN)
|
EA
|
1.000
|
$13,348.040
|
$15,400.000
|
$14,000.000
|
$22,205.000
|
$18,900.000
|
|
|
WINGWALL (PW - 2) (HW=6 FT)
|
EA
|
2.000
|
$20,982.370
|
$17,875.000
|
$16,250.000
|
$21,156.000
|
$21,000.000
|
|
|
WINGWALL (PW - 2) (HW=7 FT)
|
EA
|
1.000
|
$28,209.320
|
$27,500.000
|
$25,000.000
|
$31,440.000
|
$27,300.000
|
|
|
WINGWALL (PW - 2) (HW=8 FT)
|
EA
|
2.000
|
$33,396.280
|
$33,000.000
|
$60,000.000
|
$39,862.000
|
$36,750.000
|
|
|
WINGWALL (PW - 2) (HW=9 FT)
|
EA
|
1.000
|
$37,475.000
|
$52,800.000
|
$48,000.000
|
$57,584.000
|
$57,750.000
|
|
|
SET (TY II) (18 IN) (RCP) (3: 1) (C)
|
EA
|
1.000
|
$1,436.780
|
$1,000.000
|
$950.000
|
$1,869.000
|
$4,200.000
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (C)
|
EA
|
3.000
|
$1,474.360
|
$1,200.000
|
$1,035.000
|
$2,030.000
|
$4,410.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
18.000
|
$1,654.990
|
$1,400.000
|
$1,300.000
|
$2,453.000
|
$1,890.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$2,205.260
|
$1,500.000
|
$1,325.000
|
$2,504.000
|
$5,250.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
8.000
|
$2,606.550
|
$1,750.000
|
$1,620.000
|
$2,984.000
|
$2,467.500
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$3,138.740
|
$2,200.000
|
$2,000.000
|
$3,463.000
|
$6,300.000
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$6,334.270
|
$6,200.000
|
$5,600.000
|
$7,213.000
|
$10,500.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
16.000
|
$4,897.900
|
$2,200.000
|
$2,000.000
|
$6,725.000
|
$1,050.000
|
|
|
REMOV STR (SET)
|
EA
|
6.000
|
$1,282.580
|
$475.000
|
$200.000
|
$1,717.000
|
$420.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
4.000
|
$2,658.580
|
$1,100.000
|
$1,000.000
|
$2,288.000
|
$8,400.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
2.000
|
$2,205.290
|
$1,100.000
|
$1,000.000
|
$2,290.000
|
$2,625.000
|
|
|
REMOV STR (PIPE)
|
LF
|
494.000
|
$60.700
|
$20.000
|
$10.000
|
$17.800
|
$73.500
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
35.000
|
$142.480
|
$110.000
|
$100.000
|
$230.000
|
$2,100.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,059,914.560
|
$1,400,000.000
|
$1,450,000.000
|
$1,597,490.000
|
$1,650,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
18.000
|
$11,500.000
|
$20,000.000
|
$50,000.000
|
$69,000.000
|
$63,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
440.000
|
$38.000
|
$60.000
|
$52.360
|
$62.000
|
$82.500
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
440.000
|
$17.000
|
$28.000
|
$24.830
|
$30.000
|
$55.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
3,094.000
|
$2.900
|
$5.500
|
$4.900
|
$8.750
|
$3.140
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
3,094.000
|
$0.850
|
$2.000
|
$1.700
|
$2.000
|
$1.100
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
1,720.000
|
$6.000
|
$7.500
|
$6.600
|
$7.850
|
$5.500
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,720.000
|
$1.020
|
$2.000
|
$1.700
|
$2.000
|
$2.750
|
|
|
CONSTRUCTING DETOURS
|
SY
|
3,893.000
|
$140.000
|
$180.000
|
$120.000
|
$94.000
|
$150.000
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
6.000
|
$5,500.000
|
$7,500.000
|
$30,000.000
|
$13,000.000
|
$11,550.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
4,900.000
|
$60.000
|
$90.000
|
$50.000
|
$115.750
|
$100.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
480.000
|
$65.000
|
$83.000
|
$50.000
|
$146.500
|
$120.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
31,360.000
|
$11.000
|
$15.000
|
$24.000
|
$21.950
|
$20.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
3,442.000
|
$15.000
|
$15.000
|
$33.000
|
$16.250
|
$50.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
4,900.000
|
$10.000
|
$14.000
|
$20.000
|
$41.800
|
$15.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
480.000
|
$10.000
|
$14.000
|
$20.000
|
$42.150
|
$35.000
|
|
|
DRIVEWAYS (ACP)(TYPE 1)
|
SY
|
44.000
|
$87.000
|
$452.000
|
$360.000
|
$375.000
|
$160.000
|
|
|
DRIVEWAYS (CONC)(TYPE 1)
|
SY
|
297.000
|
$117.660
|
$142.000
|
$155.000
|
$760.000
|
$250.000
|
|
|
DRIVEWAYS (ACP) (TYPE 2)
|
SY
|
804.000
|
$70.000
|
$145.000
|
$145.000
|
$370.000
|
$100.000
|
|
|
INTERSECTIONS (ACP) (TYPE 2)
|
SY
|
447.000
|
$60.000
|
$200.000
|
$175.000
|
$372.000
|
$90.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
30,259.000
|
$0.320
|
$0.130
|
$0.250
|
$0.320
|
$0.300
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
13,827.000
|
$0.320
|
$0.300
|
$0.250
|
$0.320
|
$0.150
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
338.000
|
$28.810
|
$24.750
|
$40.000
|
$26.750
|
$29.820
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
130.000
|
$4.360
|
$5.550
|
$5.000
|
$3.000
|
$5.330
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
2.000
|
$328.810
|
$560.000
|
$300.000
|
$150.000
|
$319.500
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
2.000
|
$3,457.820
|
$3,200.000
|
$3,300.000
|
$3,420.000
|
$3,514.500
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
13.000
|
$296.710
|
$335.000
|
$300.000
|
$356.000
|
$266.250
|
|
|
MAILBOX INSTALL-D (TWW-POST) TY 4
|
EA
|
3.000
|
$323.670
|
$390.000
|
$350.000
|
$416.000
|
$276.900
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
19.000
|
$900.000
|
$665.000
|
$600.000
|
$713.000
|
$654.980
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
|
EA
|
3.000
|
$900.000
|
$720.000
|
$650.000
|
$773.000
|
$772.130
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
4.000
|
$1,100.000
|
$990.000
|
$950.000
|
$1,070.000
|
$1,183.220
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-EXAL)
|
EA
|
1.000
|
$1,500.000
|
$1,045.000
|
$950.000
|
$1,230.000
|
$1,312.080
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
22.000
|
$447.500
|
$82.500
|
$75.000
|
$89.000
|
$106.500
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
32.000
|
$87.550
|
$49.500
|
$75.000
|
$89.000
|
$74.550
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
990.000
|
$0.300
|
$0.460
|
$0.420
|
$0.830
|
$2.500
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
|
LF
|
2,952.000
|
$0.500
|
$0.550
|
$0.500
|
$0.830
|
$1.750
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
6,778.000
|
$0.300
|
$0.470
|
$0.430
|
$0.830
|
$1.500
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
576.000
|
$22.000
|
$7.430
|
$6.750
|
$4.030
|
$40.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
1,562.000
|
$2.000
|
$1.600
|
$0.820
|
$1.080
|
$5.250
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
1,560.000
|
$1.000
|
$1.600
|
$0.820
|
$1.080
|
$5.250
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
1,554.000
|
$1.000
|
$1.600
|
$0.820
|
$1.080
|
$5.250
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
31,164.000
|
$1.130
|
$0.750
|
$0.680
|
$1.190
|
$1.000
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
1,500.000
|
$1.030
|
$0.850
|
$0.770
|
$1.190
|
$1.400
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
22,008.000
|
$1.320
|
$0.750
|
$0.680
|
$1.190
|
$1.000
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
57.000
|
$17.850
|
$16.780
|
$15.250
|
$16.650
|
$52.800
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
353.000
|
$8.010
|
$5.010
|
$4.550
|
$5.040
|
$11.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
2,952.000
|
$1.000
|
$0.440
|
$0.400
|
$0.570
|
$6.300
|
|
|
D-GR HMA TY-C PG64-22
|
TON
|
7,200.000
|
$123.000
|
$148.500
|
$195.000
|
$165.000
|
$167.210
|
|
|
SP MIXES SP-C SAC-A PG70-28
|
TON
|
7,200.000
|
$162.560
|
$192.500
|
$205.000
|
$172.000
|
$171.470
|
|
|
TACK COAT
|
GAL
|
12,521.000
|
$9.570
|
$0.010
|
$3.000
|
$6.340
|
$3.730
|
|
|
STEEL FENCE (REMOVE)
|
LF
|
60.000
|
$30.000
|
$20.000
|
$52.000
|
$66.000
|
$53.250
|
|
|
STEEL FENCE (INSTALL)
|
LF
|
60.000
|
$150.000
|
$200.000
|
$200.000
|
$437.000
|
$213.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$8,260.000
|
$22,000.000
|
$14,850.000
|
$12,000.000
|
$8,800.000
|
|
|
TMA (STATIONARY)
|
DAY
|
116.000
|
$168.000
|
$220.000
|
$2,100.000
|
$360.000
|
$220.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
15.000
|
$104.000
|
$220.000
|
$2,000.000
|
$1,035.000
|
$1,100.000
|
|
|
SOLAR POWERED LED ROADSIDE SIGN
|
EA
|
2.000
|
$7,285.000
|
$3,520.000
|
$3,200.000
|
$3,802.000
|
$2,369.630
|
|
|
DRIVEWAY ASSISTANCE DEVICE(DAD) SYSTEM
|
MO
|
8.000
|
$10,000.000
|
$14,000.000
|
$50,000.000
|
$19,200.000
|
$17,850.000
|
|
Totals: |
$11,659,060.185
|
$14,018,177.610
|
$14,686,701.979
|
$15,975,439.400
|
$16,758,945.908
|