Show Job Controls
Bid Cobra

JOHNSON FM 4 (1513-02-042)

Items: 77

County: JOHNSON
Length: N/A
Highway: FM 4
District: FORT WORTH
Control Number: 1513-02-042
DBE Goal: N/A
Project: STP 1902(334)HES
Guaranty: N/A
Time: 150 WORKING DAYS
Engineer's Estimate: $1,619,915.30
Date: 08/06/2019 (6 years ago)
Contract Number: N/A
Type: CONSTRUCT FRONTAGE ROADS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$1,619,915.30
$1,990,741.76
Over/Under Est: 22.89% $370,826.46
Over/Under Est: 27.92% $452,270.63
Amt Left: 4.09% $81,444.17
Over/Under Est: 28.86% $467,582.56
Amt Left: 4.86% $96,756.10
Delta: -0.74% -$15,311.93

Bid Items & Bid Tabulations

77 Total 0 of 77
JOHNSON  |  FM 4  |  FORT WORTH  |  1513-02-042  |  08/06/2019  |  $1,619,915.30  |  STP 1902(334)HES  |  CONSTRUCT FRONTAGE ROADS  |  150 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ED BELL CONSTRUCTION COMPANY
TEXAS MATERIALS GROUP, INC.
JAY MILLS CONTRACTING, INCORPORATED
REMOVING CONC (DRIVEWAYS)
SY 145.000 $25.000 $31.500 $35.000 $25.000
EXCAVATION (ROADWAY)
CY 1,289.000 $15.000 $3.000 $32.900 $40.000
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 1,454.000 $30.000 $21.000 $17.000 $45.000
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
SY 17,571.000 $0.300 $0.550 $0.410 $0.410
CELL FBR MLCH SEED(TEMP)(WARM)
SY 8,787.000 $1.000 $0.500 $0.380 $0.370
CELL FBR MLCH SEED(TEMP)(COOL)
SY 8,787.000 $1.000 $0.500 $0.380 $0.370
FERTILIZER
AC 7.300 $1,000.000 $630.000 $725.000 $720.000
VEGETATIVE WATERING
MG 1,237.000 $20.000 $10.000 $0.010 $32.000
SALV, HAUL & STKPL RCL APH PV (6 TO 8")
SY 508.000 $4.000 $11.550 $30.000 $15.000
SLV,HAUL & STKPL RCL APH PV (10 TO 12")
SY 1,202.000 $6.000 $21.000 $20.000 $15.000
D-GR HMA(SQ) TY-B PG64-22
TON 4,213.000 $80.000 $93.000 $105.000 $96.000
D-GR HMA(SQ) TY-C PG64-22 (LEVEL-UP)
TON 146.000 $100.000 $195.000 $220.000 $205.000
TOM (ASPHALT) PG 70-28
TON 84.000 $150.000 $155.000 $138.000 $160.000
TOM - C (AGGREGATE) SAC - B
TON 1,144.000 $150.000 $155.000 $140.000 $160.000
PLAN & TEXT ASPH CONC PAV (0" TO 3/4")
SY 534.000 $5.000 $14.000 $14.000 $25.000
TEMPORARY SPL SHORING
SF 1,700.000 $10.000 $10.000 $56.000 $72.000
RIPRAP (CONC)(4 IN)
CY 12.000 $1,000.000 $735.000 $750.000 $650.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 16.000 $500.000 $300.000 $263.000 $200.000
RC PIPE (CL III)(12 IN)
LF 36.000 $65.000 $75.000 $50.000 $100.000
RC PIPE (CL III)(18 IN)
LF 6.000 $75.000 $250.000 $111.000 $250.000
RC PIPE (CL III)(36 IN)
LF 51.000 $100.000 $200.000 $277.000 $175.000
RC PIPE (ARCH)(CL III)(DES 1)
LF 434.000 $130.000 $189.000 $333.000 $210.000
RC PIPE (ARCH)(CL III)(DES 3)
LF 60.000 $160.000 $210.000 $415.000 $240.000
RC PIPE (ARCH)(CL III)(DES 6)
LF 96.000 $250.000 $420.000 $665.000 $440.000
INLET(COMPL)(PSL)(SFG)(3FTX5FT-3FTX5FT)
EA 1.000 $5,000.000 $7,350.000 $5,000.000 $6,000.000
HEADWALL (CH - PW - 0) (DIA= 36 IN)
EA 1.000 $5,300.000 $9,450.000 $8,500.000 $9,500.000
HEADWALL (CH - PW - 0) (DIA= 60 IN)
EA 2.000 $8,300.000 $15,750.000 $14,000.000 $20,000.000
SET (TY II) (12 IN) (RCP) (6: 1) (P)
EA 4.000 $1,000.000 $630.000 $835.000 $850.000
SET (TY II) (18 IN) (RCP) (3: 1) (P)
EA 1.000 $1,250.000 $630.000 $890.000 $850.000
SET (TY II) (18 IN) (RCP) (4: 1) (C)
EA 3.000 $1,250.000 $630.000 $890.000 $950.000
SET (TY II) (36 IN) (CMP) (3: 1) (C)
EA 1.000 $2,500.000 $3,150.000 $3,100.000 $2,250.000
SET (TY II) (36 IN) (CMP) (4: 1) (C)
EA 1.000 $2,500.000 $3,150.000 $3,325.000 $2,400.000
SET (TY II) (36 IN) (CMP) (6: 1) (P)
EA 2.000 $4,000.000 $4,200.000 $3,900.000 $4,000.000
SET (TY II) (DES 1) (RCP) (6: 1) (P)
EA 24.000 $1,405.000 $3,150.000 $1,400.000 $1,200.000
SET (TY II) (DES 3) (RCP) (6: 1) (P)
EA 4.000 $2,700.000 $6,300.000 $2,800.000 $3,000.000
SET (TY II) (DES 6) (RCP) (6: 1) (P)
EA 1.000 $5,000.000 $11,550.000 $8,315.000 $12,000.000
CLEAN EXIST CULVERTS
EA 3.000 $4,000.000 $2,100.000 $2,800.000 $4,000.000
REMOV STR (PIPE)
LF 8.000 $15.000 $52.500 $45.000 $100.000
REMOV STR (PIPE)
EA 17.000 $355.000 $420.000 $950.000 $1,500.000
MOBILIZATION
LS 1.000 $149,000.000 $338,000.000 $200,000.000 $200,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $10,000.000 $15,750.000 $17,000.000 $12,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 500.000 $30.000 $55.000 $81.000 $30.000
ROCK FILTER DAMS (REMOVE)
LF 500.000 $10.000 $11.000 $27.000 $10.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 555.000 $20.000 $22.000 $25.000 $25.000
CONSTRUCTION EXITS (REMOVE)
SY 555.000 $10.000 $11.000 $8.820 $9.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 3,736.000 $5.000 $2.200 $1.950 $2.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 3,736.000 $1.000 $0.280 $0.510 $0.600
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 30.000 $3.000 $5.500 $7.390 $10.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 30.000 $2.000 $1.100 $6.210 $7.000
ONE-WAY TRAF CONT (PILOT CAR)
HR 344.000 $100.000 $42.500 $60.540 $120.000
DRIVEWAYS (CONC)
SY 128.000 $100.000 $110.000 $146.270 $125.000
DRIVEWAYS (ACP)
SY 552.000 $35.000 $85.000 $74.280 $95.000
TURNOUTS (ACP)
SY 163.000 $50.000 $94.500 $54.260 $95.000
DRIVEWAYS (BASE)
SY 1,324.000 $35.000 $21.000 $27.730 $20.000
MAILBOX INSTALL-S (WC-POST) TY 3
EA 5.000 $360.000 $192.500 $836.210 $200.000
MAILBOX INSTALL-D (WC-POST) TY 3
EA 2.000 $365.000 $203.500 $840.340 $205.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 27.000 $520.000 $484.000 $487.760 $490.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 1.000 $650.000 $643.500 $648.500 $650.000
REMOVE SM RD SN SUP&AM
EA 7.000 $200.000 $82.500 $83.140 $85.000
ISRSA TY10BWG(1)SA(P) (EXCLUDING SIGN)
EA 30.000 $400.000 $357.500 $360.000 $400.000
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 10.000 $60.000 $82.500 $83.000 $82.500
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 18,320.000 $0.500 $0.340 $0.250 $0.250
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 18,320.000 $0.500 $0.340 $0.250 $0.250
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 920.000 $1.500 $2.760 $1.300 $1.240
REFL PAV MRK TY II (W) 24" (SLD)
LF 12.000 $10.000 $11.000 $2.220 $2.200
REF PROF PAV MRK TY I(W)4"(SLD)(090MIL)
LF 12,349.000 $1.000 $0.720 $0.670 $0.660
REF PROF PAV MRK TY I(W)6"(SLD)(060MIL)
LF 5,591.000 $2.000 $0.830 $0.830 $0.830
REF PROF PAV MRK TY I(Y)4"(SLD)(090MIL)
LF 6,798.000 $1.000 $0.720 $0.670 $0.660
REFL PAV MRK TY I (Y)4"(BRK)ADDALT3X
LF 11,516.000 $1.000 $0.610 $0.480 $0.470
PREFAB PAV MRK TY C (W) (4") (DOT)
LF 86.000 $5.000 $4.400 $3.300 $3.250
REFL PAV MRKR TY II-A-A
EA 460.000 $5.000 $4.620 $5.540 $5.500
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 107.000 $120.000 $105.000 $90.000 $100.000
TMA (STATIONARY)
EA 2.000 $10,000.000 $5,500.000 $0.010 $18,000.000
TMA (MOBILE OPERATION)
HR 104.000 $75.000 $25.000 $95.000 $85.000
SOLAR POWERED LED ROADSIDE SIGN
EA 6.000 $4,185.000 $3,245.000 $3,300.000 $3,250.000
LEAD LED CHEVRON
EA 4.000 $4,735.000 $4,345.000 $4,400.000 $4,400.000
LED CHEVRON
EA 44.000 $2,720.000 $3,025.000 $3,100.000 $3,025.000
Totals: $1,619,915.300 $1,990,741.760 $2,072,185.930 $2,087,497.860