JOHNSON SH 171 (0019-02-034)

Items: 63

County: JOHNSON
Length: N/A
Highway: SH 171
District: FORT WORTH
Control Number: 0019-02-034
DBE Goal: N/A
Project: F 2021(340)
Guaranty: N/A
Time: 320 WORKING DAYS
Engineer's Estimate: $7,523,308.05
Date: 02/05/2021 (5 years ago)
Contract Number: N/A
Type: RESURFACE ROADWAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (6)
E
Engineer's Estimate
$7,523,308.05
$6,387,249.33
Over/Under Est: -15.1% -$1,136,058.72
Over/Under Est: -13.4% -$1,008,004.07
Amt Left: 2% $128,054.65
Over/Under Est: -12.96% -$974,707.38
Amt Left: 2.53% $161,351.34
Delta: -0.51% -$33,296.69
Over/Under Est: -12.4% -$932,755.79
Amt Left: 3.18% $203,302.93
Delta: -0.64% -$41,951.59
Over/Under Est: -3.01% -$226,660.41
Amt Left: 14.24% $909,398.31
Delta: -10.71% -$706,095.38
Over/Under Est: -2.13% -$159,919.42
Amt Left: 15.28% $976,139.30
Delta: -0.91% -$66,740.99

Bid Items & Bid Tabulations

63 Total 0 of 63
JOHNSON  |  SH 171  |  FORT WORTH  |  0019-02-034  |  02/05/2021  |  $7,523,308.05  |  F 2021(340)  |  RESURF ROADWAY  |  320 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
BIG CREEK CONSTRUCTION, LTD.
NORTHEASTERN PAVERS, LLC
TEXAS MATERIALS GROUP, INC.
FOUTSCO PAVING COMPANY, LLC
AUSTIN BRIDGE & ROAD SERVICES, LP
PEACHTREE CONSTRUCTION, LTD.
REMOVING CONC (DRIVEWAYS)
SY 237.000 $18.000 $20.000 $25.000 $25.900 $10.000 $25.000 $30.000
EXCAVATION (ROADWAY)
CY 150.000 $7.000 $30.000 $25.000 $25.900 $30.000 $25.000 $30.000
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 350.000 $15.000 $20.000 $30.000 $31.000 $30.000 $30.000 $35.000
BACKFILL (TY A)
STA 540.000 $150.000 $200.000 $175.000 $160.000 $145.000 $130.000 $245.000
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
SY 366.000 $0.350 $6.000 $6.000 $6.200 $6.000 $5.360 $4.500
VEGETATIVE WATERING
MG 17.000 $11.500 $100.000 $50.000 $50.000 $100.000 $874.000 $190.000
WILDFLOWER SEEDING
AC 0.100 $1,225.000 $10,000.000 $19,500.000 $9,500.000 $10,000.000 $17,293.000 $30,000.000
FLEXIBLE PAVE STRUCTURE REPAIR(12.5")
SY 38,099.000 $70.000 $55.000 $65.000 $60.650 $70.200 $66.000 $68.500
PLANE ASPH CONC PAV(0" TO 2")
SY 132,986.000 $2.700 $2.000 $0.900 $1.450 $0.700 $1.140 $1.540
RIPRAP (MOW STRIP)(4 IN)
CY 96.000 $500.000 $650.000 $525.000 $545.000 $420.000 $525.000 $610.000
CLEANING AND SEALING EXISTING JOINTS
LF 168.000 $25.000 $60.000 $40.000 $29.000 $32.000 $45.000 $35.000
RETROFIT RAIL (TY T131RC)
LF 242.000 $200.000 $200.000 $195.000 $200.000 $160.000 $200.000 $170.000
MOBILIZATION
LS 1.000 $673,028.000 $474,000.000 $500,000.000 $400,000.000 $358,000.000 $729,000.000 $475,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 15.000 $8,000.000 $2,500.000 $1,500.000 $5,775.000 $500.000 $26,000.000 $4,500.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,656.000 $2.500 $3.000 $6.500 $2.900 $2.000 $2.350 $3.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,656.000 $0.650 $0.500 $1.500 $1.000 $0.500 $0.600 $1.500
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 200.000 $4.500 $6.000 $10.000 $7.250 $3.000 $4.250 $6.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 200.000 $1.100 $3.000 $3.000 $2.070 $1.000 $1.000 $1.000
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
LF 600.000 $21.000 $25.000 $19.000 $17.480 $40.000 $39.000 $65.000
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 1,500.000 $9.000 $10.000 $12.000 $5.150 $10.000 $4.380 $20.000
PORT CTB (STKPL)(F-SHAPE)(TY 1)
LF 600.000 $10.000 $20.000 $19.000 $17.480 $15.000 $40.830 $25.000
DRIVEWAYS (CONC)
SY 237.000 $75.000 $125.000 $90.000 $93.270 $70.000 $90.000 $104.000
DRIVEWAYS (ACP)
SY 2,192.000 $45.000 $25.000 $20.000 $17.540 $22.000 $9.500 $16.500
DRIVEWAYS (BASE)
SY 1,933.000 $20.000 $17.000 $23.000 $23.840 $7.500 $14.500 $26.500
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 100,472.000 $0.250 $0.170 $0.150 $0.160 $0.090 $0.170 $0.170
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 57,357.000 $0.550 $0.170 $0.200 $0.210 $0.090 $0.170 $0.220
MTL W-BEAM GD FEN (TIM POST)
LF 987.500 $23.000 $25.000 $21.000 $26.200 $19.000 $21.000 $20.500
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 6.000 $1,875.000 $2,000.000 $1,900.000 $2,330.000 $1,355.000 $1,900.000 $1,450.000
MTL BM GD FEN TRANS (31"-28")(25')
EA 2.000 $470.000 $500.000 $475.000 $492.000 $450.000 $475.000 $520.000
REMOVE METAL BEAM GUARD FENCE
LF 825.000 $3.000 $3.000 $2.500 $2.590 $2.000 $2.500 $2.900
REMOVE TERMINAL ANCHOR SECTION
EA 2.000 $250.000 $150.000 $200.000 $208.000 $150.000 $200.000 $130.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 4.000 $265.000 $150.000 $200.000 $208.000 $125.000 $200.000 $130.000
GUARDRAIL END TREATMENT (INSTALL)
EA 10.000 $2,710.000 $2,500.000 $2,300.000 $2,400.000 $2,395.000 $2,300.000 $2,550.000
GUARDRAIL END TREATMENT (REMOVE)
EA 8.000 $300.000 $250.000 $200.000 $210.000 $200.000 $200.000 $210.000
CRASH CUSH ATTEN (DES SOURCE)
EA 4.000 $4,400.000 $1,500.000 $2,450.000 $680.000 $1,350.000 $575.100 $1,400.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 8.000 $1,500.000 $1,500.000 $1,800.000 $345.000 $1,350.000 $284.190 $1,450.000
CRASH CUSH ATTEN (STKPL)
EA 4.000 $1,500.000 $1,000.000 $1,350.000 $17.000 $750.000 $568.380 $800.000
ALUMINUM SIGNS (TY G)
SF 187.250 $26.000 $20.000 $21.000 $21.750 $20.000 $21.000 $21.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 17.000 $535.000 $500.000 $465.000 $482.000 $460.000 $465.000 $510.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 17.000 $600.000 $600.000 $590.000 $611.450 $525.000 $590.000 $620.000
REMOVE SM RD SN SUP&AM
EA 34.000 $99.000 $100.000 $80.000 $82.900 $75.000 $80.000 $95.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 26.000 $30.000 $40.000 $30.000 $31.100 $24.000 $30.000 $39.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BR)
EA 4.000 $20.000 $25.000 $70.000 $72.550 $22.000 $70.000 $24.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 116,706.000 $0.650 $0.500 $0.010 $0.330 $0.320 $0.450 $0.360
WK ZN PAV MRK REMOV (Y)4"(BRK)
LF 8,100.000 $0.650 $0.500 $0.010 $0.490 $0.460 $0.590 $0.500
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 62,888.000 $0.650 $0.500 $0.010 $0.350 $0.320 $0.450 $0.360
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,238.000 $1.000 $1.000 $0.600 $0.780 $0.750 $0.800 $0.830
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 324.000 $6.500 $6.000 $6.000 $6.210 $6.000 $5.550 $6.670
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 2.000 $140.000 $125.000 $100.000 $103.630 $100.000 $130.000 $110.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 2.000 $170.000 $150.000 $120.000 $124.500 $120.000 $145.000 $132.000
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
EA 13.000 $85.000 $50.000 $50.000 $51.810 $50.000 $55.000 $54.000
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 1,310.000 $0.400 $0.700 $0.400 $0.410 $0.400 $0.350 $0.440
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 105,110.000 $0.210 $0.350 $0.400 $0.410 $0.400 $0.340 $0.440
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 8,100.000 $0.330 $0.350 $0.400 $0.410 $0.400 $0.350 $0.440
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 62,888.000 $0.350 $0.350 $0.400 $0.410 $0.400 $0.340 $0.440
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
LF 10,358.000 $0.550 $0.700 $1.000 $1.030 $1.000 $1.000 $1.110
REFL PAV MRKR TY I-C
EA 69.000 $3.800 $4.000 $5.000 $5.180 $4.000 $5.000 $5.500
REFL PAV MRKR TY II-A-A
EA 1,166.000 $3.150 $4.000 $3.500 $3.630 $4.000 $5.000 $3.800
SP MIXES SP-C SAC-A PG70-28
TON 27,384.000 $95.000 $95.000 $100.000 $105.850 $105.000 $102.500 $112.500
TACK COAT
GAL 47,625.000 $2.800 $1.000 $0.010 $0.010 $0.010 $0.100 $0.250
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 668.000 $95.000 $35.000 $50.000 $18.000 $0.010 $54.500 $60.000
TMA (STATIONARY)
DAY 654.000 $200.000 $150.000 $0.010 $0.010 $0.010 $10.000 $125.000
TMA (MOBILE OPERATION)
DAY 40.000 $400.000 $250.000 $0.010 $0.010 $0.010 $605.000 $300.000
Totals: $7,523,308.050 $6,387,249.330 $6,515,303.980 $6,548,600.678 $6,590,552.260 $7,296,647.640 $7,363,388.630