Show Job Controls
Bid Cobra

JIM WELLS FM 738 (1087-01-014)

Items: 67

County: JIM WELLS
Length: N/A
Highway: FM 738
District: CORPUS CHRISTI
Control Number: 1087-01-014
DBE Goal: N/A
Project: STP 2020(040)HES
Guaranty: N/A
Time: 68 WORKING DAYS
Engineer's Estimate: $1,022,958.40
Date: 09/06/2019 (6 years ago)
Contract Number: N/A
Type: PROVIDE ADDITIONAL PAVED SURFACE WIDTH
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$1,022,958.40
$1,150,495.07
Over/Under Est: 12.47% $127,536.67
Over/Under Est: 26.06% $266,580.73
Amt Left: 12.09% $139,044.06
$1,337,642.18
Over/Under Est: 30.76% $314,683.78
Amt Left: 16.27% $187,147.11
Delta: -3.73% -$48,103.05
Over/Under Est: 47.68% $487,765.77
Amt Left: 31.31% $360,229.10
Delta: -12.94% -$173,081.99
Over/Under Est: 48.24% $493,501.29
Amt Left: 31.81% $365,964.62
Delta: -0.38% -$5,735.52

Bid Items & Bid Tabulations

67 Total 0 of 67
JIM WELLS  |  FM 738  |  CORPUS CHRISTI  |  1087-01-014  |  09/06/2019  |  $1,022,958.40  |  STP 2020(040)HES  |  PROVIDE ADDITIONAL PAVED SURF WIDTH  |  68 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
J. CARROLL WEAVER, INC.
HAAS-ANDERSON CONSTRUCTION, LTD.
BAY LTD.
TIERRA LEASE SERVICE, LLC
SALINAS CONSTRUCTION TECHNOLOGIES, LTD.
REMOVING CONC (HEADWALL)
CY 4.000 $150.000 $1,231.670 $780.000 $530.000 $1,815.000 $928.170
EXCAVATION (ROADWAY)
CY 76.000 $10.000 $76.600 $43.000 $13.000 $145.000 $71.960
SUBGRADE WIDENING (DENS CONT)
STA 119.000 $500.000 $207.980 $353.000 $220.000 $425.000 $563.330
BACKFILL (TY B)
STA 119.000 $130.000 $96.700 $211.000 $220.000 $205.000 $268.300
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 3,709.000 $55.000 $71.480 $81.000 $81.000 $102.500 $86.160
PRIME COAT (MC-30)
GAL 2,945.000 $4.000 $3.840 $4.200 $4.800 $5.750 $5.610
ASPH (MULTI OPTION)
GAL 5,221.000 $3.000 $3.300 $2.150 $3.200 $3.500 $4.580
ASPH(AC-15P, HFRS-2P OR CRS-2P)
GAL 12,830.000 $3.000 $3.330 $2.800 $2.800 $3.500 $4.650
AGGR(TY-PB GR-4S OR TY-PB GR-4)(SAC-B)
CY 361.000 $100.000 $112.650 $120.000 $110.000 $150.000 $130.840
AGGR(TY-PB GR-3 OR TY-PB GR-3S)(SAC-B)
CY 158.000 $75.000 $168.330 $220.000 $250.000 $240.000 $210.480
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 48.000 $200.000 $380.800 $337.000 $390.000 $320.000 $376.030
RIPRAP (MOW STRIP)(4 IN)
CY 106.000 $500.000 $485.180 $526.000 $650.000 $655.000 $702.440
RC PIPE (CL III)(18 IN)
LF 796.000 $65.000 $55.680 $70.000 $62.000 $81.000 $102.730
RC PIPE (CL III)(24 IN)
LF 12.000 $75.000 $69.280 $208.000 $120.000 $125.000 $169.280
SET (TY II) (18 IN) (RCP) (6: 1) (C)
EA 4.000 $1,100.000 $2,252.380 $1,540.000 $1,200.000 $1,700.000 $1,392.590
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 58.000 $1,000.000 $1,001.020 $1,300.000 $1,200.000 $1,700.000 $1,392.590
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 6.000 $1,100.000 $2,281.700 $1,690.000 $1,600.000 $2,500.000 $1,795.090
CLEAN EXIST CULVERTS
EA 5.000 $2,000.000 $2,115.020 $1,160.000 $3,200.000 $1,500.000 $2,225.500
REMOV STR (PIPE)
LF 697.000 $16.000 $19.940 $12.000 $22.000 $15.000 $11.230
MOBILIZATION
LS 1.000 $100,000.000 $136,599.610 $125,000.000 $61,200.000 $135,000.000 $146,545.650
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 4.000 $5,500.000 $370.060 $5,050.000 $13,000.000 $6,500.000 $6,027.400
TEMP SEDMT CONT FENCE (INSTALL)
LF 120.000 $2.500 $9.520 $7.000 $9.700 $7.000 $7.410
TEMP SEDMT CONT FENCE (REMOVE)
LF 120.000 $1.000 $6.050 $7.000 $5.200 $5.000 $7.410
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 300.000 $3.500 $6.720 $9.300 $6.800 $7.000 $9.130
BIODEG EROSN CONT LOGS (REMOVE)
LF 300.000 $1.000 $2.800 $4.050 $2.900 $1.000 $4.180
INTERSECTIONS (SURF TREAT)
SY 428.000 $30.000 $25.130 $56.000 $60.000 $30.000 $52.000
DRIVEWAYS (SURF TREAT)
SY 1,688.000 $25.000 $34.370 $62.010 $55.000 $25.000 $30.260
MTL W-BEAM GD FEN (TIM POST)
LF 1,325.000 $25.000 $28.000 $28.000 $24.000 $26.000 $26.470
MTL BM GD FEN (LONG SPAN SYSTEM)
EA 2.000 $900.000 $1,344.000 $1,110.000 $960.000 $1,800.000 $1,093.770
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,000.000 $1,680.000 $3,320.000 $1,400.000 $3,000.000 $3,159.390
MAILBOX INSTALL-S (RR-POST) TY 4
EA 8.000 $250.000 $274.400 $215.000 $280.000 $250.000 $281.690
MAILBOX INSTALL-D (RR-POST) TY 4
EA 2.000 $250.000 $296.800 $256.000 $300.000 $325.000 $340.270
MAILBOX INSTALL-M (TWG-POST) TY 4
EA 1.000 $350.000 $420.000 $378.000 $430.000 $400.000 $510.050
IN RD IL (TY SA) 40T-8 (250W EQ) LED
EA 6.000 $3,500.000 $3,131.520 $3,250.000 $4,100.000 $3,100.000 $4,122.580
CONDT (PVC) (SCH 40) (2")
LF 1,045.000 $10.000 $7.840 $8.150 $16.500 $7.750 $16.040
CONDT (PVC) (SCH 80) (2") (BORE)
LF 50.000 $20.000 $56.000 $58.000 $83.000 $56.000 $82.250
CONDT (PVC) (SCH 80) (3")
LF 10.000 $15.000 $33.600 $35.000 $55.000 $40.000 $63.100
ELEC CONDR (NO.6) BARE
LF 1,135.000 $1.500 $1.230 $1.300 $2.600 $1.250 $2.620
ELEC CONDR (NO.6) INSULATED
LF 2,270.000 $1.500 $1.400 $1.450 $2.600 $1.500 $2.570
GROUND BOX TY A (122311)W/APRON
EA 2.000 $900.000 $1,243.200 $128.000 $1,400.000 $1,250.000 $1,423.770
ELC SRV TY A 240/480 060(NS)SS(E)GC(U)
EA 1.000 $5,500.000 $6,100.640 $6,450.000 $10,000.000 $6,500.000 $9,777.550
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 36.000 $450.000 $532.000 $553.000 $540.000 $550.000 $525.210
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 14.000 $525.000 $728.000 $669.000 $740.000 $650.000 $721.970
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 1.000 $650.000 $868.000 $733.000 $880.000 $750.000 $950.050
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 1.000 $400.000 $1,176.000 $919.000 $1,200.000 $900.000 $1,252.550
RELOCATE SM RD SN SUP&AM TY S80
EA 3.000 $500.000 $392.000 $483.000 $400.000 $525.000 $417.520
RELOCATE SM RD SN SUP & AM TY TEMP
EA 34.000 $150.000 $123.200 $128.000 $130.000 $250.000 $123.870
ISRSA TYS80(1)SA(P) (EXCLUDING SIGN)
EA 2.000 $425.000 $414.400 $471.000 $420.000 $500.000 $455.770
INSTL OM ASSM (OM-2Z)(FLX)GND(BI)
EA 4.000 $50.000 $84.000 $61.000 $85.000 $70.000 $106.890
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 15.000 $25.000 $24.640 $30.000 $25.000 $35.000 $30.700
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 1,086.000 $1.000 $0.730 $1.150 $2.500 $1.000 $17.320
REFL PAV MRK TY II (W) 4" (SLD)
LF 23,850.000 $0.150 $0.170 $0.200 $0.320 $0.320 $0.310
REFL PAV MRK TY II (Y) 4" (BRK)
LF 4,730.000 $0.150 $0.170 $0.200 $0.340 $0.320 $0.350
REFL PAV MRK TY II (Y) 4" (SLD)
LF 13,986.000 $0.150 $0.170 $0.200 $0.330 $0.320 $0.330
REF PROF PAV MRK TY I(W)4"(SLD)(060MIL)
LF 23,850.000 $0.500 $0.780 $0.750 $0.700 $0.670 $0.660
REF PROF PAV MRK TY I(Y)4"(SLD)(090MIL)
LF 13,986.000 $0.500 $0.780 $0.900 $0.750 $0.700 $0.720
REF PROF PAV MRK TY I(Y)4"(BRK)(090MIL)
LF 4,730.000 $0.500 $0.780 $0.900 $6.800 $6.750 $6.620
PREFAB PAV MRK TY C (W) (12") (SLD)
LF 88.000 $8.000 $12.320 $8.350 $15.750 $17.000 $16.510
REFL PAV MRKR TY II-A-A
EA 239.000 $3.000 $4.480 $5.950 $5.700 $5.800 $5.910
ELIM EXT PAV MRK & MRKS (24")
LF 38.000 $1.500 $50.400 $17.000 $16.000 $5.800 $8.070
TREE TRIMMING / BRUSH REMOVAL
MI 1.500 $12,000.000 $21,873.600 $13,100.000 $22,200.000 $18,000.000 $5,877.630
GEOGRID BASE REINFORCEMENT (TY I)
SY 18,606.000 $1.500 $0.710 $1.750 $1.350 $1.500 $2.750
PORTABLE CHANGEABLE MESSAGE SIGN
EA 3.000 $8,000.000 $4,704.000 $5,670.000 $10,500.000 $15,000.000 $8,530.200
TMA (STATIONARY)
EA 1.000 $6,000.000 $16,800.000 $100.000 $16,200.000 $30,000.000 $13,297.550
TMA (MOBILE OPERATION)
HR 70.000 $50.000 $134.400 $10.000 $51.000 $35.000 $117.170
SOLAR POWERED LED WARNING SIGN
EA 1.000 $3,500.000 $2,626.400 $4,420.000 $3,200.000 $4,500.000 $3,177.550
SOLAR POWERED LED ROADSIDE SIGN
EA 1.000 $4,000.000 $2,626.400 $4,420.000 $3,600.000 $4,500.000 $3,507.550
Totals: $1,022,958.400 $1,150,495.070 $1,289,539.130 $1,337,642.180 $1,510,724.170 $1,516,459.695