Show Job Controls
Bid Cobra

JIM WELLS FM 2044 (1086-01-019)

Items: 48

County: JIM WELLS
Length: N/A
Highway: FM 2044
District: CORPUS CHRISTI
Control Number: 1086-01-019
DBE Goal: N/A
Project: BR 2020(466)
Guaranty: N/A
Time: 86 WORKING DAYS
Engineer's Estimate: $664,337.30
Date: 01/09/2020 (6 years ago)
Contract Number: N/A
Type: REPLACE BRIDGE AND APPROACHES
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$664,337.30
$750,501.85
Over/Under Est: 12.97% $86,164.55
Over/Under Est: 29.71% $197,370.70
Amt Left: 14.82% $111,206.15
Over/Under Est: 34.79% $231,106.13
Amt Left: 19.31% $144,941.58
Delta: -3.91% -$33,735.43
Over/Under Est: 84.64% $562,287.17
Amt Left: 63.44% $476,122.62
Delta: -36.99% -$331,181.04
$1,295,833.50
Over/Under Est: 95.06% $631,496.20
Amt Left: 72.66% $545,331.65
Delta: -5.64% -$69,209.03

Bid Items & Bid Tabulations

48 Total 0 of 48
JIM WELLS  |  FM 2044  |  CORPUS CHRISTI  |  1086-01-019  |  01/09/2020  |  $664,337.30  |  BR 2020(466)  |  REPLACE BRIDGE AND APPROACHES  |  86 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
VECTOR UTILITIES LLC
TIERRA LEASE SERVICE, LLC
J. CARROLL WEAVER, INC.
SALINAS CONSTRUCTION TECHNOLOGIES, LTD.
FOREMOST PAVING, INC.
PREPARING ROW
STA 6.130 $1,500.000 $491.900 $1,000.000 $2,583.780 $1,186.260 $10,000.000
REMOVING STAB BASE AND ASPH PAV (2")
SY 1,048.000 $5.000 $6.220 $1.000 $14.110 $12.920 $6.000
EXCAVATION (ROADWAY)
CY 865.000 $5.000 $18.840 $15.000 $20.310 $34.430 $20.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 901.000 $10.000 $23.670 $22.000 $9.520 $14.910 $24.000
COMPOST MANUF TOPSOIL (4")
SY 2,300.000 $2.000 $2.240 $5.800 $4.560 $5.550 $2.200
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 2,300.000 $0.250 $1.020 $1.000 $1.250 $0.600 $1.000
BROADCAST SEED (TEMP) (WARM)
SY 1,150.000 $0.150 $0.910 $1.250 $1.940 $0.380 $0.900
BROADCAST SEED (TEMP) (COOL)
SY 1,150.000 $0.150 $0.910 $1.250 $1.940 $0.380 $0.900
VEGETATIVE WATERING
MG 98.000 $20.000 $30.500 $30.000 $51.300 $55.520 $40.000
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 719.000 $60.000 $93.350 $92.000 $94.910 $129.660 $100.000
PRIME COAT (MC-30)
GAL 344.000 $3.500 $5.690 $8.000 $7.680 $11.190 $12.000
ASPH (MULTI OPTION)
GAL 627.000 $3.000 $3.660 $5.000 $4.650 $8.760 $32.000
AGGR(TY-PB GR-3 SAC-B)
CY 18.000 $100.000 $475.680 $300.000 $418.840 $623.200 $120.000
AGGR(TY-PB GR-4 SAC-B)
CY 14.000 $100.000 $475.680 $300.000 $418.620 $803.640 $120.000
ASPH(AC-15P, HFRS-2P OR CRS-2P)
GAL 517.000 $3.000 $4.730 $5.000 $4.650 $8.460 $32.000
DRILL SHAFT (24 IN)
LF 342.000 $150.000 $145.000 $280.000 $284.780 $299.890 $650.000
CL C CONC (ABUT)
CY 23.200 $800.000 $1,885.000 $1,500.000 $1,414.590 $1,397.500 $3,000.000
CL C CONC (CAP)
CY 16.000 $1,000.000 $2,816.000 $1,800.000 $1,876.400 $1,979.850 $3,000.000
CL C CONC (COLUMN)
CY 9.100 $1,000.000 $4,568.000 $1,900.000 $2,010.880 $1,742.320 $3,000.000
REINF CONC SLAB (SLAB BEAM)
SF 3,533.000 $15.000 $14.000 $22.000 $23.580 $26.960 $20.000
PRESTR CONC SLAB BEAM (4SB12)
LF 868.000 $160.000 $123.000 $140.000 $150.780 $182.060 $150.000
RIPRAP (CONC)(5 IN)
CY 185.000 $375.000 $405.000 $515.000 $435.970 $683.400 $700.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 160.000 $100.000 $2.050 $156.000 $222.020 $199.750 $200.000
RIPRAP (MOW STRIP)(4 IN)
CY 20.000 $500.000 $400.000 $660.000 $435.950 $862.920 $900.000
RAIL (TY T223)
LF 244.000 $100.000 $175.000 $225.000 $148.840 $200.510 $150.000
SEALED EXPANSION JOINT (4 IN) (SEJ - A)
LF 63.000 $75.000 $286.000 $100.000 $136.800 $373.260 $200.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 1.000 $20,000.000 $15,200.000 $20,000.000 $24,030.630 $30,905.910 $60,000.000
MOBILIZATION
LS 1.000 $75,000.000 $45,000.000 $65,000.000 $70,470.920 $238,114.510 $120,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 5.000 $6,000.000 $1,100.000 $2,500.000 $2,280.000 $780.920 $4,000.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 75.000 $30.000 $59.000 $35.000 $61.560 $29.180 $65.000
ROCK FILTER DAMS (REMOVE)
LF 75.000 $10.000 $20.000 $10.000 $38.760 $12.680 $30.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 156.000 $20.000 $50.000 $10.000 $36.480 $28.310 $70.000
CONSTRUCTION EXITS (REMOVE)
SY 156.000 $5.000 $16.000 $5.000 $10.260 $14.010 $28.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,164.000 $2.500 $3.560 $3.000 $2.740 $4.510 $3.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,164.000 $1.000 $0.970 $2.000 $1.140 $1.480 $1.000
MTL W-BEAM GD FEN (TIM POST)
LF 225.000 $30.000 $28.000 $25.000 $30.780 $32.630 $30.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,000.000 $2,056.000 $2,200.000 $1,852.500 $1,716.700 $1,500.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,000.000 $3,000.000 $3,000.000 $3,374.400 $3,295.200 $3,000.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 2.000 $530.000 $664.000 $700.000 $666.900 $562.600 $585.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 2.000 $550.000 $630.000 $700.000 $837.900 $562.600 $735.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 2.000 $25.000 $22.000 $25.000 $36.480 $95.100 $32.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 7.000 $25.000 $31.000 $25.000 $51.300 $73.100 $45.000
PAVEMENT SEALER 4"
LF 440.000 $0.200 $0.760 $1.000 $0.860 $1.110 $0.750
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 1,225.000 $0.250 $1.780 $2.000 $2.000 $2.030 $1.750
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 1,225.000 $0.250 $1.780 $2.000 $2.000 $2.030 $1.750
REFL PAV MRKR TY II-A-A
EA 16.000 $3.000 $10.160 $12.000 $11.400 $18.880 $10.000
PAV SURF PREP FOR MRK (4")
LF 440.000 $0.020 $0.200 $0.250 $0.230 $0.510 $0.200
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 14.000 $65.000 $5.000 $100.000 $114.000 $205.430 $175.000
Totals: $664,337.300 $750,501.857 $861,708.000 $895,443.447 $1,226,624.476 $1,295,833.500