JIM WELLS CR (0916-37-036)

Items: 41

County: JIM WELLS
Length: N/A
Highway: CR
District: CORPUS CHRISTI
Control Number: 0916-37-036
DBE Goal: 550.0%
Project: BR 2024(963)
Guaranty: N/A
Time: 150 WORKING DAYS
Engineer's Estimate: $1,673,294.75
Date: 06/05/2024 (2 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
LUCIA ADAME
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$1,673,294.75
$1,411,096.46
Over/Under Est: -15.67% -$262,198.29
$1,485,375.80
Over/Under Est: -11.23% -$187,918.95
Amt Left: 5.26% $74,279.34
$1,503,773.12
Over/Under Est: -10.13% -$169,521.63
Amt Left: 6.57% $92,676.66
Delta: -1.24% -$18,397.32
$1,670,592.53
Over/Under Est: -0.16% -$2,702.22
Amt Left: 18.39% $259,496.07
Delta: -11.09% -$166,819.41
$1,799,243.50
Over/Under Est: 7.53% $125,948.75
Amt Left: 27.51% $388,147.04
Delta: -7.70% -$128,650.97
Subcontractor Percentage Amount
AVILA AND SON'S L.L.C. 5.56% $78,456.96
JMG CONCRETE INC 4.55% $64,204.89
TEXAS ICON CONSTRUCTION, LLC 1.12% $15,804.28
HIGHWAY BARRICADES AND SERVICES, LLC 0.78% $11,006.55
Total: 12.01% $169,472.68

Bid Items & Bid Tabulations

41 Total 0 of 41
JIM WELLS  |  CR  |  CORPUS CHRISTI  |  0916-37-036  |  06/05/2024  |  $1,673,294.75  |  BR 2024(963)  |  BRIDGE REPL  |  150 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
J. CARROLL WEAVER, INC.
STX CIVIL
3LW CIVIL LLC
TALBERT COMPANIES LLC
CK NEWBERRY, LLC
PREPARING ROW
STA 2.830 $2,000.000 $3,727.600 $9,500.000 $8,500.000 $2,750.000 $10,000.000
REMOVING STAB BASE AND ASPH PAV (6")
SY 1,546.000 $30.000 $7.910 $9.000 $25.000 $33.000 $6.000
EXCAVATION (ROADWAY)
CY 301.000 $22.000 $20.320 $30.000 $35.000 $24.380 $60.000
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 1,112.000 $45.000 $10.470 $31.000 $40.000 $48.400 $35.000
COMPOST MANUF TOPSOIL (4")
SY 863.000 $5.250 $13.860 $5.000 $4.250 $5.400 $11.000
STRAW/HAY MLCH SEED(PERM)(RURAL)(CLAY)
SY 863.000 $1.000 $5.880 $7.000 $0.010 $5.780 $2.000
STRAW/HAY MLCH SEED(TEMP)(WARM)
SY 431.000 $3.000 $5.600 $11.000 $0.010 $9.080 $2.000
STRAW/HAY MLCH SEED(TEMP)(COOL)
SY 431.000 $3.000 $5.600 $11.000 $0.010 $9.080 $3.000
VEGETATIVE WATERING
MG 36.000 $150.000 $25.760 $100.000 $0.010 $159.640 $50.000
SOIL RETENTION BLANKETS (CL 1) (TY C)
SY 863.000 $8.000 $5.320 $6.000 $0.010 $5.230 $3.000
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 396.000 $140.000 $181.570 $150.000 $223.000 $152.260 $200.000
PRIME COAT (MC-30)
GAL 348.000 $8.000 $3.810 $20.000 $16.500 $8.570 $15.000
ASPH (MULTI OPTION)
GAL 1,214.000 $7.000 $4.820 $20.000 $7.700 $6.090 $8.000
AGGR(TY-PB GR-4S OR TY-PB GR-4)(SAC-B)
CY 16.000 $226.000 $443.100 $492.000 $880.000 $257.970 $800.000
AGGR(TY-PB GR-3 OR TY-PB GR-3S)(SAC-B)
CY 14.000 $132.000 $443.100 $544.000 $990.000 $145.170 $875.000
STRUCT EXCAV (BOX)
CY 656.000 $50.000 $15.020 $19.000 $35.000 $45.630 $25.000
CEM STABIL BKFL
CY 323.000 $195.000 $136.650 $183.000 $264.000 $242.000 $250.000
FLOWABLE BACKFILL
CY 172.000 $425.000 $196.000 $267.000 $264.000 $231.000 $300.000
TEMPORARY SPL SHORING
SF 2,426.000 $27.000 $22.400 $25.000 $3.250 $29.410 $12.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 415.000 $200.000 $268.260 $248.000 $219.440 $220.000 $300.000
RAIL (TY T223)
LF 456.300 $175.000 $171.500 $200.000 $159.390 $253.000 $285.000
CONC BOX CULV (6 FT X 6 FT)
LF 366.000 $1,000.000 $774.530 $837.000 $926.000 $1,006.680 $900.000
WINGWALL (PW - 1) (HW=11 FT)
EA 2.000 $76,000.000 $72,520.570 $67,000.000 $131,307.000 $77,430.910 $55,000.000
WINGWALL (PW - 1) (HW=8 FT)
EA 2.000 $43,000.000 $35,487.450 $39,000.000 $51,208.000 $44,621.500 $110,000.000
REMOV STR (BOX CULVERT)
EA 2.000 $12,000.000 $13,186.410 $19,137.000 $8,500.000 $10,928.470 $10,000.000
REMOV STR (WINGWALL)
EA 4.000 $10,100.000 $2,637.280 $2,908.000 $400.000 $11,033.230 $5,000.000
MOBILIZATION
LS 1.000 $147,074.000 $181,631.180 $120,000.000 $120,000.000 $167,329.480 $175,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000 $9,250.000 $5,040.000 $3,534.000 $3,250.000 $3,333.450 $10,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 390.000 $91.000 $62.720 $73.000 $0.010 $62.430 $70.000
ROCK FILTER DAMS (REMOVE)
LF 390.000 $27.000 $28.000 $46.000 $0.010 $39.600 $30.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 985.000 $6.750 $6.200 $5.000 $0.010 $5.780 $5.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 985.000 $1.750 $1.120 $2.000 $0.010 $3.580 $2.000
MTL W-BEAM GD FEN (STEEL POST)
LF 405.000 $65.000 $45.920 $38.000 $32.000 $32.180 $32.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 8.000 $2,750.000 $3,024.000 $3,495.000 $1,800.000 $2,222.000 $3,000.000
GUARDRAIL END TREATMENT (INSTALL)
EA 8.000 $3,700.000 $4,144.000 $4,475.000 $2,800.000 $3,184.500 $4,000.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 8.000 $40.000 $52.640 $40.000 $36.000 $43.450 $200.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 16.000 $52.000 $58.240 $45.000 $36.000 $46.200 $200.000
TREE AND BRUSH REMOVAL
AC 0.480 $20,000.000 $7,886.250 $16,785.000 $0.010 $21,010.000 $15,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 112.000 $80.000 $196.000 $94.000 $0.010 $76.110 $150.000
TMA (STATIONARY)
DAY 48.000 $180.000 $50.400 $270.000 $0.010 $200.440 $300.000
TMA (MOBILE OPERATION)
HR 48.000 $130.000 $56.000 $112.000 $0.010 $131.790 $60.000
Totals: $1,673,294.750 $1,411,096.468 $1,485,375.800 $1,503,773.132 $1,670,592.530 $1,799,243.500