Show Job Controls
Bid Cobra

JEFFERSON IH0010 (6479-91-001)

Items: 76

County: JEFFERSON
Length: 0.0100 MILES
Highway: IH0010
District: BEAUMONT
Control Number: 6479-91-001
DBE Goal: N/A
Project: RMC - A00213969
Guaranty: $21,000.00
Time: 365 CALENDAR DAYS
Engineer's Estimate: $1,065,545.00
Date: 06/04/2025 (1 year ago) Changed
Contract Number: 6254006
Type: METAL BEAM GUARD FENCE REPAIR
Project ID: A00213969
Project Description: MBGF & CABLE BARRIER REPAIR
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
DAVE COLLINS
RICHARD BRADLEY
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$1,065,545.00
$622,654.00
Over/Under Est: -41.56% -$442,891.00
$859,628.00
Over/Under Est: -19.33% -$205,917.00
Amt Left: 38.06% $236,974.00
Over/Under Est: -7.02% -$74,844.00
Amt Left: 59.11% $368,047.00
Delta: -15.25% -$131,073.00
$1,103,792.50
Over/Under Est: 3.59% $38,247.50
Amt Left: 77.27% $481,138.50
Delta: -11.42% -$113,091.50

Bid Items & Bid Tabulations

76 Total 0 of 76
JEFFERSON  |  IH0010  |  BEAUMONT  |  6479-91-001  |  06/04/2025  |  $1,065,545.00  |  RMC - A00213969  |  METAL BEAM GUARD FENCE REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ROSS SA ENTERPRISE LLC
RHINO EQUITY, LLC
T&L CLEANING SERVICES LLC
ISI CONTRACTING, INC.
REMOV CONC (RIPRAP)
SY 5.000 $100.000 $50.000 $500.000 $250.000 $18.700
RIPRAP (MOW STRIP)(4 IN)
CY 10.000 $1,200.000 $50.000 $600.000 $500.000 $470.000
RETROFIT RAIL (TY T131RC)
LF 50.000 $250.000 $25.000 $1.000 $300.000 $551.000
MOBILIZATION (CALLOUT)
EA 75.000 $800.000 $1.000 $1.000 $1.000 $303.000
MOBILIZATION (EMERGENCY)
EA 5.000 $3,250.000 $1,000.000 $1.000 $1.000 $605.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 5.000 $300.000 $7,870.000 $6,000.000 $200.000 $1,500.000
TMA (STATIONARY)
DAY 130.000 $350.000 $1.000 $200.000 $100.000 $500.000
MTL W-BEAM GD FEN (TIM POST)
LF 10.000 $30.000 $50.000 $20.000 $50.000 $45.000
MTL THRIE-BEAM GD FEN (TIM POST)
LF 1.000 $90.000 $50.000 $100.000 $1,000.000 $76.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 2.000 $2,250.000 $1,000.000 $1,800.000 $1,500.000 $1,644.000
MTL BEAM GD FEN TRANS (TL2)
EA 2.000 $1,250.000 $100.000 $500.000 $500.000 $1,644.000
MTL BEAM GD FEN TRANS (T101)
EA 1.000 $1,300.000 $200.000 $500.000 $600.000 $1,163.000
MTL BEAM GD FEN TRANS (T6)
EA 1.000 $500.000 $100.000 $500.000 $600.000 $1,175.000
MTL W-BEAM GD FEN ADJUSTMENT
LF 1.000 $100.000 $100.000 $1.000 $100.000 $16.000
MTL THRIE-BEAM GD FEN ADJUSTMENT
LF 1.000 $150.000 $100.000 $1.000 $100.000 $16.000
TERMINAL ANCHOR SECTION ADJUSTMENT
EA 1.000 $225.000 $1.000 $1.000 $100.000 $100.000
TRANSITION ADJUSTMENT
EA 2.000 $300.000 $1.000 $1.000 $100.000 $100.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $2,000.000 $2,500.000 $4,000.000 $2,000.000 $2,383.000
MTL BM GD FEN (LONG SPAN SYSTEM)
EA 4.000 $60.000 $1.000 $1.000 $1,000.000 $501.000
MTL BM GD FEN TRANS (31"-28")
EA 1.000 $700.000 $480.000 $1.000 $100.000 $501.000
REMOVE METAL BEAM GUARD FENCE
LF 40.000 $10.000 $10.000 $2.000 $1.000 $8.600
REMOVE TERMINAL ANCHOR SECTION
EA 4.000 $300.000 $1.000 $100.000 $1.000 $587.000
GUARDRAIL END TREATMENT (MOVE & RESET)
EA 2.000 $2,500.000 $1.000 $1.000 $1.000 $898.000
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000 $675.000 $1.000 $1.000 $1.000 $1,167.000
GUARDRAIL END TRTMNT(RETRO)(STEEL POST)
EA 1.000 $1,700.000 $2,000.000 $1.000 $2,000.000 $130.000
GUARDRAIL END TRTMNT(RETRO)(WOOD POST)
EA 1.000 $1,700.000 $2,000.000 $1.000 $1,500.000 $130.000
GDRL END TRMT(RETRO W/O HEAD)(STL POST)
EA 1.000 $1,000.000 $2,000.000 $1.000 $1.000 $309.000
GDRL END TRTMT(RETRO W/O HEAD)(WD POST)
EA 1.000 $1,100.000 $2,000.000 $1.000 $1.000 $309.000
CRASH CUSH ATTEN (REMOVE)
EA 1.000 $2,000.000 $800.000 $500.000 $1,000.000 $471.000
CRASH CUSH ATTEN (INSTL)(R)(N)(TL3)
EA 1.000 $24,500.000 $5,000.000 $54,000.000 $30,000.000 $30,123.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 10.000 $40.000 $1.000 $10.000 $30.000 $27.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BR)
EA 2.000 $40.000 $1.000 $10.000 $30.000 $27.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2(BI)
EA 10.000 $40.000 $1.000 $10.000 $30.000 $27.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2(BR)
EA 2.000 $40.000 $1.000 $10.000 $30.000 $27.000
REPLACE RAIL ELEMENT (W-BEAM)
LF 3,750.000 $20.000 $27.000 $30.000 $28.000 $35.000
REPLACE RAIL ELEMENT (THRIE-BEAM)
LF 1.000 $100.000 $50.000 $1,100.000 $40.000 $42.000
REPL RAIL ELMNT(THRIE-BM TRANS TO W-BM)
EA 10.000 $200.000 $1.000 $1,280.000 $100.000 $948.000
REPLACE SHORT RADIUS SYS (TL-2)
EA 10.000 $100.000 $1.000 $1.000 $50.000 $959.000
REPLACE TIMBER POST W/O CONC FND
EA 75.000 $165.000 $500.000 $300.000 $1.000 $122.000
REPLACE STEEL POST W/O CONC FND
EA 4.000 $70.000 $500.000 $300.000 $50.000 $122.000
REPLACE TIMBER POST W/ CONC FND
EA 40.000 $140.000 $250.000 $200.000 $100.000 $168.000
REPLACE STEEL POST W/ CONC FND
EA 4.000 $125.000 $500.000 $200.000 $100.000 $168.000
REALIGN POSTS
EA 500.000 $25.000 $0.250 $10.000 $1.000 $18.800
REPAIR OF TERMINAL ANCHORS POSTS
EA 5.000 $100.000 $1.000 $1.000 $1.000 $588.000
REPLACE TERMINAL ANCHOR POSTS
EA 4.000 $200.000 $100.000 $100.000 $1.000 $494.000
REM OBSOLETE GET & REPL W/ SGT
EA 50.000 $3,200.000 $3,000.000 $300.000 $5,000.000 $471.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 20.000 $1,000.000 $800.000 $2,000.000 $1,000.000 $1,141.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 750.000 $30.000 $1.000 $40.000 $100.000 $19.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 130.000 $90.000 $1.000 $200.000 $50.000 $50.000
REPLACE BLOCKOUT
EA 150.000 $30.000 $100.000 $100.000 $5.000 $30.000
REPAIR STEEL POST WITH BASE PLATE
EA 5.000 $300.000 $150.000 $35.000 $200.000 $302.000
RESET SGT IMPACT HEAD
EA 15.000 $30.000 $100.000 $1.000 $1.000 $407.000
REPLACE SGT OBJECT MARKER
EA 15.000 $35.000 $1.000 $450.000 $30.000 $38.000
REPLACE SGT CABLE ASSEMBLY
EA 15.000 $100.000 $1.000 $300.000 $75.000 $159.000
REPLACE SGT STRUT
EA 20.000 $100.000 $1.000 $250.000 $75.000 $111.000
REPLACE POSTS (TL-4)(GIBRALTAR)
EA 200.000 $200.000 $50.000 $60.000 $150.000 $293.000
REPLACE POSTS (TL-4)(NU-CABLE)
EA 200.000 $200.000 $1.000 $20.000 $1.000 $293.000
REPLACE POSTS (TL-4)(TRINITY)
EA 200.000 $200.000 $1.000 $60.000 $250.000 $293.000
CABLE SPLICE / TURNBUCKLE (TL-4)
EA 5.000 $250.000 $200.000 $1.000 $1.000 $880.000
REPAIR CONCRETE FOUNDATION (TL-4)
EA 2.000 $2,000.000 $1,000.000 $100.000 $1.000 $411.000
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
EA 15.000 $100.000 $1,000.000 $50.000 $1,000.000 $4,695.000
REPLACE CABLE (TL-4)
LF 100.000 $10.000 $50.000 $1.000 $1.000 $7.000
CHECK / RE-TENSION CABLE (TL-4)
EA 30.000 $800.000 $1,000.000 $1.000 $1.000 $381.000
REPLACE POST HARDWARE (TL-4)
EA 20.000 $30.000 $100.000 $1.000 $20.000 $88.000
REPLACE (SMTC) WIDE
EA 2.000 $20,000.000 $25,000.000 $25,000.000 $30,000.000 $43,127.000
REPAIR (SMTC) WIDE
LF 40.000 $400.000 $100.000 $1,000.000 $200.000 $170.000
REPLACE (QUAD - ELITE) WIDE
EA 2.000 $25,000.000 $100.000 $25,000.000 $50,000.000 $43,127.000
REPAIR (QUAD - ELITE) WIDE
LF 60.000 $400.000 $50.000 $500.000 $250.000 $170.000
REPLACE (TAU-M) NARROW
EA 1.000 $30,000.000 $5,000.000 $10,000.000 $10,000.000 $43,127.000
REPAIR (TAU-M) NARROW
LF 30.000 $400.000 $100.000 $500.000 $200.000 $170.000
REPAIR (TAU-M BAY) NARROW
EA 10.000 $550.000 $500.000 $10,000.000 $1,000.000 $1,057.000
REPAIR (QUAD)(N)(M)
LF 60.000 $350.000 $250.000 $500.000 $200.000 $170.000
REPLACE (QUAD)(N)(M)
EA 2.000 $20,000.000 $25,000.000 $25,000.000 $25,000.000 $43,127.000
CONCRETE RAIL REPAIR (IN-KIND)
LF 100.000 $1,200.000 $50.000 $50.000 $200.000 $176.000
PEDESTRIAN BARRIER (FURN & INSTALL)
LF 100.000 $50.000 $50.000 $50.000 $250.000 $117.000
PEDESTRIAN BARRIER (REMOVE & REINSTALL)
LF 100.000 $100.000 $50.000 $50.000 $250.000 $117.000
Totals: $1,065,545.000 $622,654.000 $859,628.000 $990,701.000 $1,103,792.500