JEFFERSON IH0010 (6435-38-001)

Items: 105

County: JEFFERSON
Length: N/A
Highway: IH0010
District: BEAUMONT
Control Number: 6435-38-001
DBE Goal: N/A
Project: RMC - 643538001
Guaranty: N/A
Time: 365 CALENDAR DAYS
Engineer's Estimate: $1,195,435.00
Date: 06/01/2023 (3 years ago)
Contract Number: N/A
Type: METAL BEAM GUARD FENCE REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$1,195,435.00
$706,468.40
Over/Under Est: -40.9% -$488,966.60
$1,048,580.00
Over/Under Est: -12.28% -$146,855.00
Amt Left: 48.43% $342,111.60

Bid Items & Bid Tabulations

105 Total 0 of 105
JEFFERSON  |  IH0010  |  BEAUMONT  |  6435-38-001  |  06/01/2023  |  $1,195,435.00  |  RMC - 643538001  |  METAL BEAM GUARD FENCE REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ROSS SA ENTERPRISE LLC
ISI CONTRACTING, INC.
REMOVING CONC (RIPRAP)
SY 4.000 $100.000 $51.000 $50.000
CONC STR REPR(REMOV AND REPL WINGWALL)
CY 2.000 $5,000.000 $2,850.000 $2,500.000
RIPRAP (MOW STRIP)(4 IN)
CY 9.000 $1,000.000 $642.000 $400.000
RETROFIT RAIL (TY T131RC)
LF 115.000 $350.000 $148.000 $100.000
MOBILIZATION (CALLOUT)
EA 113.000 $1,000.000 $1.140 $500.000
MOBILIZATION (EMERGENCY)
EA 5.000 $2,500.000 $989.000 $1,500.000
MTL W-BEAM GD FEN (TIM POST)
LF 8.000 $50.000 $41.000 $60.000
MTL THRIE-BEAM GD FEN (TIM POST)
LF 4.000 $100.000 $56.000 $100.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 1.000 $5,000.000 $1,800.000 $3,000.000
MTL BEAM GD FEN TRANS (TL2)
EA 2.000 $2,000.000 $1,036.000 $800.000
MTL BEAM GD FEN TRANS (T101)
EA 1.000 $2,000.000 $512.000 $800.000
MTL BEAM GD FEN TRANS (T6)
EA 1.000 $500.000 $536.000 $400.000
MTL W-BEAM GD FEN ADJUSTMENT
LF 1.000 $100.000 $15.580 $50.000
MTL THRIE-BEAM GD FEN ADJUSTMENT
LF 1.000 $150.000 $514.000 $50.000
TERMINAL ANCHOR SECTION ADJUSTMENT
EA 1.000 $400.000 $542.000 $350.000
TRANSITION ADJUSTMENT
EA 2.000 $600.000 $536.000 $500.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $2,200.000 $5,145.000 $2,500.000
MTL BM GD FEN (LONG SPAN SYSTEM)
LF 4.000 $45.000 $68.000 $40.000
MTL BM GD FEN TRANS (31"-28")
EA 1.000 $1,200.000 $575.000 $900.000
REMOVE METAL BEAM GUARD FENCE
LF 40.000 $5.000 $48.000 $2.500
REMOVE TERMINAL ANCHOR SECTION
EA 4.000 $300.000 $352.000 $250.000
GUARDRAIL END TREATMENT (MOVE & RESET)
EA 2.000 $1,200.000 $365.000 $1,000.000
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000 $500.000 $347.000 $400.000
GUARDRAIL END TRTMNT(RETRO)(STEEL POST)
EA 1.000 $5,000.000 $2,950.000 $2,800.000
GUARDRAIL END TRTMNT(RETRO)(WOOD POST)
EA 1.000 $5,200.000 $2,945.000 $4,500.000
GDRL END TRMT(RETRO W/O HEAD)(STL POST)
EA 1.000 $900.000 $904.000 $800.000
GDRL END TRTMT(RETRO W/O HEAD)(WD POST)
EA 1.000 $900.000 $908.000 $800.000
CRASH CUSH ATTEN (REMOVE)
EA 1.000 $1,000.000 $1,254.000 $1,000.000
CRASH CUSH ATTEN (INSTL)(R)(N)(TL3)
EA 1.000 $31,000.000 $29,485.000 $24,000.000
CRASH CUSHION ATTEN (INSTALL)(REACT)(N)
EA 1.000 $31,000.000 $31,451.000 $31,000.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
EA 4.000 $80.000 $39.000 $40.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 4.000 $55.000 $32.000 $50.000
INSTL DEL ASSM (D-SY)SZ (BRF)GF1
EA 35.000 $40.000 $29.000 $40.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 9.000 $40.000 $12.000 $40.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BR)
EA 2.000 $40.000 $52.000 $40.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 3,750.000 $35.000 $45.000 $26.000
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 1.000 $100.000 $1,247.000 $25.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 8.000 $80.000 $41.000 $75.000
REPAIR RAIL ELEMENT (CURVED RAIL)
LF 8.000 $80.000 $25.000 $65.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 75.000 $50.000 $42.000 $80.000
REM / REPL TIMBER / STL POST W/CONC FND
EA 38.000 $150.000 $248.000 $125.000
REM / REPL STEEL POST W / CONC FND
EA 4.000 $200.000 $254.000 $150.000
REPAIR STEEL POST WITH BASE PLATE
EA 6.000 $600.000 $415.000 $400.000
REALIGN POSTS
EA 750.000 $20.000 $1.000 $25.000
REMOVE & REPLACE BLOCKOUT
EA 150.000 $20.000 $20.000 $20.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 750.000 $20.000 $14.000 $33.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 132.000 $90.000 $20.000 $75.000
REPAIR OF TERMINAL ANCHORS POSTS
EA 4.000 $50.000 $325.000 $10.000
REPLACE TERMINAL ANCHOR POSTS
EA 4.000 $350.000 $325.000 $300.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 12.000 $5,000.000 $6,135.000 $5,000.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 23.000 $1,800.000 $1,000.000 $1,200.000
REM & RESET SGT IMPACT HEAD
EA 8.000 $250.000 $320.000 $150.000
REPLACE SGT CABLE ASSEMBLY
EA 23.000 $150.000 $1.000 $125.000
REPLACE SGT STRUT
EA 23.000 $100.000 $1.000 $125.000
REPLACE SGT OBJECT MARKER
EA 15.000 $35.000 $1.000 $30.000
REPAIR STEEL POST WITH BASE PLATE
EA 1.000 $300.000 $225.000 $200.000
REPAIR (SMTC)(N)(BAY)
EA 4.000 $550.000 $510.000 $500.000
REPLACE POSTS (TL-4)
EA 578.000 $330.000 $1.000 $310.000
CABLE SPLICE / TURNBUCKLE (TL-4)
EA 8.000 $450.000 $150.000 $450.000
REPAIR CONCRETE FOUNDATION (TL-4)
EA 2.000 $500.000 $200.000 $250.000
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
EA 15.000 $1,500.000 $1.000 $4,500.000
REPLACE CABLE (TL-4)
LF 150.000 $10.000 $6.000 $8.000
CHECK / RE-TENSION CABLE
EA 30.000 $600.000 $100.000 $200.000
REPLACE POSTS (TL-4)(FURN)
EA 19.000 $150.000 $100.000 $125.000
REPAIR (REACT)
EA 1.000 $5,700.000 $1,500.000 $1,000.000
REMOVE AND REPLACE (NARROW QUAD)
EA 1.000 $25,000.000 $1.000 $23,000.000
REPAIR (NARROW QUAD)
EA 1.000 $5,000.000 $1,200.000 $5,000.000
REMOVE AND REPLACE (WIDE QUAD)
EA 1.000 $32,000.000 $1.000 $34,000.000
REPAIR (WIDE QUAD)
EA 1.000 $7,000.000 $1,200.000 $3,000.000
REPAIR REACT (N) (MISC HARDWARE)
EA 1.000 $1,500.000 $1,000.000 $800.000
REPAIR REACT (N) (REAR SEC "S")
EA 1.000 $2,500.000 $500.000 $1,200.000
REPAIR REACT (N) (REAR SEC "B")
EA 1.000 $2,200.000 $500.000 $1,200.000
REPAIR REACT (N) (FRONT SECTION)
EA 1.000 $2,200.000 $500.000 $1,200.000
REPAIR REACT (N) (CYLINDERS)
EA 1.000 $4,000.000 $500.000 $1,500.000
REPAIR (QUAD) (N) (BAY)
EA 1.000 $1,000.000 $1,200.000 $1,500.000
REPAIR (QUAD) (W) (BAY)
EA 1.000 $4,000.000 $1,200.000 $2,000.000
REPAIR REACT (MISC) (HARDWARE)
EA 1.000 $1,500.000 $1,200.000 $800.000
REPAIR REACT (CYLINDERS)
EA 1.000 $3,500.000 $3,000.000 $3,500.000
REPAIR (QUAD - ELITE) NARROW (BAY)
EA 4.000 $1,000.000 $2,500.000 $3,000.000
REPAIR (QUAD - ELITE) WIDE (BAY)
EA 1.000 $1,500.000 $2,500.000 $3,000.000
REMOVE / REPLACE (QUAD - ELITE) NARROW
EA 1.000 $25,000.000 $34,150.000 $30,000.000
REMOVE / REPLACE (QUAD - ELITE) WIDE
EA 1.000 $37,000.000 $35,215.000 $40,000.000
REPAIR (QUADGUARD - ELITE) (CYLINDER)
EA 1.000 $2,000.000 $2,652.000 $3,500.000
REPAIR (QUAD) (N) (NOSE)
EA 1.000 $1,500.000 $1,251.000 $1,000.000
REPAIR (QUAD) (W) (NOSE)
EA 1.000 $1,300.000 $1,251.000 $1,000.000
REPAIR QUAD (W) (MISC HARDWARE)
EA 1.000 $1,500.000 $1,242.000 $900.000
QUAD(N)(BAY)CARTRIDGE(REMOVE & REPLACE)
EA 1.000 $1,400.000 $1,250.000 $1,200.000
QUAD(N)(BAY)NOSE ASSMBLY(REMOVE&REPLAC)
EA 1.000 $1,300.000 $1,250.000 $1,100.000
QUAD(N)(BAY)DIAPHRAGM(REMOVE & REPLACE)
EA 1.000 $2,000.000 $1,250.000 $1,600.000
QUAD(W)(BAY)CARTRIDGE(REMOVE & REPLACE)
EA 1.000 $1,500.000 $1,250.000 $1,400.000
QUAD(W)(BAY)NOSE ASSMBLY(REMOVE&REPLAC)
EA 1.000 $1,500.000 $1,250.000 $1,400.000
QUAD(W)(BAY)DIAPHRAGM(REMOVE & REPLACE)
EA 1.000 $3,100.000 $1,250.000 $2,500.000
QUAD FENDER PANEL
EA 1.000 $1,500.000 $1,250.000 $1,200.000
REACT DECAL
EA 1.000 $600.000 $850.000 $300.000
REMOVE AND REPLACE (QUADGUARD)(MASH)(N)
EA 1.000 $35,000.000 $34,651.000 $34,000.000
REPAIR (QUADGUARD)(MASH)(N)
EA 1.000 $5,000.000 $1,521.000 $5,000.000
REPAIR (QUADGUARD)(MASH)(N)(BAY)
EA 1.000 $1,000.000 $1,624.000 $800.000
REPAIR (QUADGUARD)(MASH)(N)
LF 30.000 $200.000 $325.000 $100.000
REPAIR (TAU)(MASH)(N)
EA 1.000 $2,500.000 $1,851.000 $2,000.000
REPAIR (TAU)(MASH)(N)(BAY)
EA 4.000 $2,200.000 $534.000 $500.000
REPAIR (TAU)(MASH)(N)
LF 30.000 $600.000 $101.000 $100.000
REMOVE AND REPLACE (QUADGUARD)(M10)(W)
EA 1.000 $31,000.000 $39,651.000 $32,000.000
REMOVE AND REPLACE (REACT)(M)(NARROW)
EA 1.000 $31,000.000 $36,548.000 $30,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 4.000 $300.000 $4,987.000 $6,000.000
TMA (STATIONARY)
DAY 113.000 $350.000 $1.000 $300.000
Totals: $1,195,435.000 $706,468.400 $1,048,580.000