Show Job Controls
Bid Cobra

JEFFERSON SH0347 (6427-11-001)

Items: 42

County: JEFFERSON
Length: N/A
Highway: SH0347
District: BEAUMONT
Control Number: 6427-11-001
DBE Goal: N/A
Project: RMC - 642711001
Guaranty: N/A
Time: 44 W
Engineer's Estimate: $998,856.58
Date: 05/04/2023 (3 years ago)
Contract Number: N/A
Type: ACP OVERLAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$998,856.58
Over/Under Est: 7.59% $75,768.14
Over/Under Est: 41.9% $418,486.65
Amt Left: 31.89% $342,718.51

Bid Items & Bid Tabulations

42 Total 0 of 42
JEFFERSON  |  SH0347  |  BEAUMONT  |  6427-11-001  |  05/04/2023  |  $998,856.58  |  RMC - 642711001  |  ACP OVERLAY  |  44 W
Item Code
Description
Unit
Quantity
Engineer's Estimate
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.
TEXAS MATERIALS GROUP, INC.
PLANE ASPH CONC PAV (1.5")
SY 32,996.000 $2.000 $2.900 $3.000
FULL-DEPTH REPAIR CPJR (VAR DEPTH)
CY 20.000 $1,850.000 $3,172.000 $3,500.000
RIPRAP (MOW STRIP)(4 IN)
CY 48.000 $1,250.000 $1,500.000 $1,650.000
CLEANING AND SEALING EXISTING JOINTS
LF 15,475.000 $5.000 $2.600 $2.900
MOBILIZATION
LS 1.000 $90,805.140 $100,000.000 $130,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 3.000 $7,300.000 $4,000.000 $10,500.000
MTL W-BEAM GD FEN (TIM POST)
LF 440.000 $25.000 $27.750 $32.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $1,500.000 $1,950.000 $2,090.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 4.000 $1,200.000 $1,675.000 $1,870.000
MTL BM GD FEN TRANS (NON - SYM)
EA 4.000 $800.000 $975.000 $1,100.000
MTL BM GD FEN TRANS (ANCHOR PLATE)
EA 8.000 $1,000.000 $950.000 $974.000
REMOVE METAL BEAM GUARD FENCE
LF 753.000 $3.000 $4.000 $3.300
REMOVE TERMINAL ANCHOR SECTION
EA 7.000 $400.000 $150.000 $275.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,500.000 $3,000.000 $3,190.000
GUARDRAIL END TREATMENT (REMOVE)
EA 1.000 $300.000 $250.000 $275.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 8.000 $40.000 $45.000 $41.250
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
EA 8.000 $25.000 $55.000 $16.500
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 9,152.000 $2.000 $0.510 $0.560
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 120.000 $0.600 $1.750 $1.930
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 250.000 $2.500 $12.400 $13.600
WK ZN PAV MRK NON-REMOV (W)(ARROW)
EA 7.000 $200.000 $162.000 $179.000
WK ZN PAV MRK NON-REMOV(W)(WORD)
EA 1.000 $120.000 $350.000 $385.000
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 6,166.000 $2.000 $0.510 $0.560
WK ZN PAV MRK REMOV (W)6"(BRK)
LF 3,240.000 $2.000 $0.680 $0.750
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 809.000 $2.000 $1.000 $3.370
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 485.000 $2.000 $1.000 $12.000
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 120.000 $1.000 $3.950 $4.350
REFL PAV MRK TY I (W)(WORD)(090MIL)
EA 1.000 $360.000 $360.000 $396.000
RE PM W/RET REQ TY I (W)6"(BRK)(090MIL)
LF 3,240.000 $0.600 $0.900 $0.990
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
LF 9,152.000 $1.500 $0.620 $0.680
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
LF 6,802.000 $1.500 $0.850 $0.940
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 250.000 $12.000 $17.000 $18.700
PREFAB PAV MRK TY C (W) (ARROW)
EA 7.000 $220.000 $320.000 $352.000
REFL PAV MRKR TY I-C
EA 25.000 $5.000 $5.000 $5.500
REFL PAV MRKR TY II-C-R
EA 164.000 $5.210 $5.000 $5.500
SPALLING REPAIR (HYDRAULIC CEMENT)
CF 50.000 $200.000 $160.000 $176.000
SPALLING REPAIR (POLYMERIC) (SEMIRIGID)
GAL 250.000 $100.000 $195.000 $214.500
SP MIXES SP-D SAC-A PG76-22
TON 2,797.000 $150.000 $185.000 $260.000
TACK COAT
GAL 1,980.000 $7.000 $4.000 $12.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 88.000 $350.000 $110.000 $173.960
TMA (STATIONARY)
DAY 44.000 $350.000 $100.000 $450.000
TMA (MOBILE OPERATION)
DAY 10.000 $450.000 $100.000 $450.000
Totals: $998,856.580 $1,074,624.720 $1,417,343.230