Show Job Controls
Bid Cobra

JEFFERSON FM1009 (6341-40-001)

Items: 41

County: JEFFERSON
Length: N/A
Highway: FM1009
District: BEAUMONT
Control Number: 6341-40-001
DBE Goal: N/A
Project: RMC - 634140001
Guaranty: N/A
Time: 135 CALENDAR DAYS
Engineer's Estimate: $196,906.15
Date: 03/26/2019 (7 years ago)
Contract Number: N/A
Type: CALL OUT STRIPING
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$196,906.15
Over/Under Est: 4.23% $8,325.65
$398,960.40
Over/Under Est: 102.61% $202,054.25
Amt Left: 94.4% $193,728.60

Bid Items & Bid Tabulations

41 Total 0 of 41
JEFFERSON  |  FM1009  |  BEAUMONT  |  6341-40-001  |  03/26/2019  |  $196,906.15  |  RMC - 634140001  |  CALL OUT STRIPING  |  135 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
CRABTREE BARRICADE SYSTEMS, INC.
STRIPE-A-ZONE, INC.
MOBILIZATION
LS 1.000 $14,491.000 $10,000.000 $100,000.000
MOBILIZATION (CALLOUT)
EA 15.000 $2,500.000 $1,500.000 $500.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $2,500.000 $1,000.000 $25,000.000
PAVEMENT SEALER 4"
LF 100.000 $0.100 $0.250 $1.000
PAVEMENT SEALER 8"
LF 120.000 $0.200 $0.500 $1.000
PAVEMENT SEALER 12"
LF 100.000 $0.350 $0.750 $1.000
PAVEMENT SEALER 24"
LF 60.000 $0.800 $1.500 $1.500
PAVEMENT SEALER (ARROW)
EA 10.000 $15.000 $25.000 $25.000
PAVEMENT SEALER (WORD)
EA 2.000 $20.000 $50.000 $25.000
PAVEMENT SEALER (DBL ARROW)
EA 1.000 $25.000 $100.000 $25.000
PAVEMENT SEALER (UTURN ARROW)
EA 1.000 $30.000 $100.000 $35.000
PAVEMENT SEALER (SYMBOL)
EA 2.000 $50.000 $100.000 $35.000
PAVEMENT SEALER (RR XING)
EA 1.000 $85.000 $200.000 $35.000
PAVEMENT SEALER (YLD TRI)
EA 10.000 $10.000 $25.000 $20.000
RE PM TY I(W)4"(BRK)(090MIL)(CALLOUT)
LF 8,000.000 $0.420 $0.600 $0.480
RE PM TY I(W)4"(SLD)(090MIL)(CALLOUT)
LF 96,500.000 $0.420 $0.480 $0.480
RE PM TY I(W)8"(SLD)(090MIL)(CALLOUT)
LF 800.000 $1.000 $2.000 $2.000
RE PM TY I(Y)4"(BRK)(090MIL)(CALLOUT)
LF 30,000.000 $0.420 $0.500 $0.480
RE PM TY I(Y)4"(SLD)(090MIL)(CALLOUT)
LF 124,500.000 $0.420 $0.450 $0.480
PREFAB PAV MRK TY C (W) (12") (SLD)
LF 48.000 $6.000 $20.000 $8.800
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 88.000 $12.000 $30.000 $17.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 2.000 $180.000 $600.000 $300.000
PREFAB PAV MRK TY C (W) (DBL ARROW)
EA 2.000 $260.000 $750.000 $490.000
PREFAB PAV MRK TY C (W) (UTURN ARROW)
EA 1.000 $350.000 $900.000 $585.000
PREFAB PAV MRK TY C (W) (LNDP ARROW)
EA 2.000 $400.000 $800.000 $870.000
PREFAB PAV MRK TY C (W) (WORD)
EA 4.000 $250.000 $750.000 $465.000
PREFAB PAV MRK TY C (W) (RR XING)
EA 2.000 $550.000 $1,500.000 $850.000
PREFAB PAV MRK TY C (W) (SYMBOL)
EA 2.000 $140.000 $1,500.000 $580.000
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 12.000 $50.000 $100.000 $72.000
PREFAB PAV MRK TY C(EVAC SYM, BLUE/WHT)
EA 1.000 $450.000 $650.000 $850.000
REFL PAV MRKR TY I-C
EA 50.000 $3.000 $15.000 $6.300
REFL PAV MRKR TY II-A-A
EA 100.000 $3.000 $15.000 $6.300
TRAFFIC BUTTON TY II-C-R
EA 100.000 $3.000 $15.000 $6.300
PAV SURF PREP FOR MRK (4")
LF 100.000 $0.050 $0.200 $0.400
PAV SURF PREP FOR MRK (8")
LF 100.000 $0.080 $0.400 $0.400
PAV SURF PREP FOR MRK (12")
LF 48.000 $0.150 $0.600 $0.500
PAV SURF PREP FOR MRK (24")
LF 24.000 $0.300 $2.000 $1.000
PAV SURF PREP FOR MRK (SYMBOL)
EA 1.000 $1.750 $50.000 $25.000
PAV SURF PREP FOR MRK (36")(YLD TRI)
EA 10.000 $5.500 $15.000 $5.000
TMA (STATIONARY)
EA 18.000 $225.000 $100.000 $15.000
TMA (MOBILE OPERATION)
HR 160.000 $50.000 $100.000 $1.000
Totals: $196,906.150 $205,231.800 $398,960.400