JEFFERSON FM 365 (0932-02-052)

Items: 78

County: JEFFERSON
Length: N/A
Highway: FM 365
District: BEAUMONT
Control Number: 0932-02-052
DBE Goal: N/A
Project: BR 2021(293)
Guaranty: N/A
Time: 171 WORKING DAYS
Engineer's Estimate: $1,813,049.74
Date: 05/06/2021 (5 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$1,813,049.74
Over/Under Est: 36% $652,665.87
Over/Under Est: 38.93% $705,792.24
Amt Left: 2.15% $53,126.37
$2,998,441.05
Over/Under Est: 65.38% $1,185,391.31
Amt Left: 21.61% $532,725.44
Delta: -19.04% -$479,599.07

Bid Items & Bid Tabulations

78 Total 0 of 78
JEFFERSON  |  FM 365  |  BEAUMONT  |  0932-02-052  |  05/06/2021  |  $1,813,049.74  |  BR 2021(293)  |  BRIDGE REPL  |  171 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
RAGLE CONSTRUCTION, INC.
TEXAS MATERIALS GROUP, INC.
MK CONSTRUCTORS
REMOVING CONC (PAV)
SY 248.000 $5.000 $12.000 $40.000 $32.000
REMOVING CONCRETE(MOW STRIP)
LF 427.000 $6.870 $13.000 $10.000 $18.000
REMOVING STAB BASE AND ASPH PAV (2")
SY 248.000 $10.000 $10.000 $20.250 $18.000
EXCAVATION (ROADWAY)
CY 571.000 $10.000 $58.000 $17.250 $40.000
EXCAVATION (CHANNEL)
CY 916.000 $10.000 $15.000 $13.250 $30.000
SUBGRADE WIDENING (DENS CONT)
STA 9.910 $550.000 $100.000 $2,443.000 $2,150.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 6,154.000 $7.510 $28.000 $24.500 $23.000
BLADING
HR 40.000 $120.000 $100.000 $133.000 $264.000
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
AC 3.120 $2,525.000 $2,807.070 $1,710.000 $1,870.000
VEGETATIVE WATERING
MG 169.400 $19.270 $20.000 $23.000 $70.000
PROOF ROLLING
HR 16.000 $100.000 $50.000 $102.000 $134.000
LIME TRT (EXST MATL) (6")
SY 2,835.000 $1.760 $6.000 $7.500 $19.000
LIME (HYD, COM, OR QK(SLURRY))
TON 42.000 $180.000 $195.000 $240.000 $241.000
D-GR HMA(SQ) TY-B PG64-22
TON 1,111.000 $93.000 $100.000 $100.000 $98.000
D-GR HMA(SQ) TY-B PG64-22 (LEVEL UP)
TON 6.000 $152.000 $145.000 $217.000 $1,100.000
TACK COAT
GAL 149.000 $3.500 $6.000 $4.750 $11.000
PLANE ASPH CONC PAV(0" TO 2")
SY 270.000 $2.000 $20.000 $20.100 $44.000
CEM STABIL BKFL
CY 66.000 $75.000 $140.000 $180.000 $222.000
TEMPORARY SPL SHORING
SF 1,431.000 $18.490 $25.000 $60.000 $113.000
PRESTR CONC PIL (18 IN SQ)
LF 1,638.000 $140.000 $110.000 $108.000 $199.000
CL C CONC (ABUT)
CY 51.600 $900.000 $1,500.000 $2,100.000 $1,800.000
CL C CONC (CAP)
CY 20.600 $1,046.650 $2,100.000 $2,500.000 $2,200.000
REINF CONC SLAB (SLAB BEAM)
SF 5,670.000 $18.000 $22.000 $30.850 $35.000
APPROACH SLAB
CY 128.000 $365.040 $500.000 $490.000 $517.000
PRESTR CONC SLAB BEAM (4SB12)
LF 532.000 $133.000 $185.000 $152.000 $259.000
PRESTR CONC SLAB BEAM (5SB12)
LF 665.000 $160.000 $190.000 $147.000 $237.000
RIPRAP (CONC)(4 IN)
CY 66.000 $500.000 $525.000 $540.000 $431.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 904.000 $125.000 $170.000 $182.000 $206.000
RAIL (TY T223)
LF 318.000 $111.680 $110.000 $169.000 $248.000
ARMOR JOINT (SEALED)
LF 152.000 $110.000 $90.000 $116.000 $175.000
RC PIPE (CL III)(18 IN)
LF 240.000 $73.400 $80.000 $48.250 $75.000
RC PIPE (CL III)(36 IN)
LF 211.000 $150.000 $125.000 $201.000 $150.000
RC PIPE (CL III)(60 IN)
LF 176.000 $245.000 $280.000 $352.000 $366.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 2.000 $800.000 $1,500.000 $854.000 $1,050.000
SET (TY II) (36 IN) (RCP) (6: 1) (P)
EA 1.000 $4,233.210 $6,000.000 $3,510.000 $10,300.000
SET (TY II) (60 IN) (RCP) (6: 1) (P)
EA 2.000 $10,000.000 $8,000.000 $8,520.000 $16,700.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 2.000 $13,000.000 $100,000.000 $64,000.000 $51,850.000
MOBILIZATION
LS 1.000 $100,000.000 $200,000.000 $250,000.000 $111,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 12.000 $6,786.700 $10,000.000 $2,000.000 $2,600.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 100.000 $33.000 $60.790 $33.000 $36.000
ROCK FILTER DAMS (REMOVE)
LF 100.000 $9.240 $14.070 $8.150 $9.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 444.000 $32.000 $45.860 $24.500 $22.000
CONSTRUCTION EXITS (REMOVE)
SY 444.000 $9.080 $9.620 $14.000 $9.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 740.000 $5.800 $6.840 $5.050 $5.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 740.000 $1.290 $2.150 $1.030 $1.000
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 10.000 $4,036.000 $5,000.000 $2,900.000 $8,240.000
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 300.000 $30.000 $70.000 $90.000 $96.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 720.000 $4.500 $3.000 $5.600 $24.000
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 270.000 $7.000 $14.000 $29.000 $154.000
0512-XXXX PTB (SSCB)(STRUCTURAL)
LF 215.000 $200.000 $60.000 $105.000 $175.000
DRIVEWAYS (BASE)
SY 960.000 $22.000 $50.000 $25.000 $32.000
MTL W-BEAM GD FEN (TIM POST)
LF 700.000 $21.270 $22.750 $22.750 $24.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 8.000 $1,892.700 $1,621.000 $1,430.000 $1,980.000
REMOVE METAL BEAM GUARD FENCE
LF 375.000 $2.500 $3.000 $2.580 $2.000
GUARDRAIL END TREATMENT (INSTALL)
EA 8.000 $2,700.000 $2,520.000 $2,350.000 $3,300.000
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000 $350.000 $250.000 $257.500 $220.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 4.000 $2,000.000 $2,000.000 $1,525.000 $358.000
CRASH CUSH ATTEN (REMOVE)
EA 6.000 $850.000 $1,200.000 $910.000 $622.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 4.000 $13,289.580 $6,995.000 $8,950.000 $9,625.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 15.000 $20.000 $26.000 $15.100 $14.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 24.000 $26.820 $45.000 $27.800 $34.000
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 540.000 $4.000 $3.000 $3.020 $3.000
WK ZN PAV MRK REMOV (TRAF BTN) TY W
LF 120.000 $1.600 $2.500 $3.020 $3.000
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
EA 4,320.000 $3.260 $3.000 $2.800 $3.000
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 96.000 $8.050 $5.000 $5.800 $6.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 170.000 $0.950 $1.000 $3.350 $1.000
PAVEMENT SEALER 4"
LF 3,234.000 $0.200 $0.250 $0.260 $0.300
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 2,264.000 $0.340 $0.500 $0.710 $0.750
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
LF 3,033.000 $0.260 $0.500 $0.710 $0.750
REFL PAV MRKR TY II-A-A
EA 154.000 $3.100 $5.000 $10.100 $11.000
ELIM EXT PAV MRK & MRKS (4")
LF 35,955.000 $0.390 $0.500 $0.360 $0.400
ELIM EXT PAV MRK & MRKS (24")
LF 96.000 $3.000 $3.000 $2.850 $3.000
PAV SURF PREP FOR MRK (4")
LF 3,234.000 $1.000 $0.010 $0.310 $0.300
SP MIXES SP-D SAC-A PG76-22
TON 335.000 $100.000 $125.000 $140.000 $275.000
TACK COAT
GAL 243.000 $3.370 $6.000 $11.000 $11.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 320.000 $60.000 $80.000 $154.000 $96.000
TMA (STATIONARY)
DAY 320.000 $200.000 $150.000 $308.000 $203.000
TMA (MOBILE OPERATION)
DAY 20.000 $200.000 $550.000 $252.000 $1,045.000
Totals: $1,813,049.738 $2,465,715.618 $2,518,841.980 $2,998,441.050