Show Job Controls
Bid Cobra

JEFFERSON FM 365 (0932-02-044)

Items: 56

County: JEFFERSON
Length: N/A
Highway: FM 365
District: BEAUMONT
Control Number: 0932-02-044
DBE Goal: N/A
Project: F 2B23(154)
Guaranty: N/A
Time: 150 WORKING DAYS
Engineer's Estimate: $7,617,748.25
Date: 08/03/2023 (2 years ago)
Contract Number: N/A
Type: ADD SHOULDERS AND OVERLAY
Mail/Deliver Bids To: N/A
DAVE COLLINS
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$7,617,748.25
Over/Under Est: 4.99% $379,792.36
Over/Under Est: 14.5% $1,104,376.97
Amt Left: 9.06% $724,584.61
Subcontractor Percentage Amount
J & M CONTRACTING, COMPANY 4.86% $379,287.49
BATTERSON, LLP 2.17% $169,352.64
ODUM SERVICES, LLC 1.83% $142,818.13
CPAVE, INC. 1.31% $102,235.93
SOUTHWEST ENVIRONMENT SERVICES LLC 0.98% $76,481.84
HIGHWAY 1 LLC 0.25% $19,510.67
PROFESSIONAL TRAFFIC CONTROL LLC 0.24% $18,730.25
Total: 11.64% $908,416.95

Bid Items & Bid Tabulations

56 Total 0 of 56
JEFFERSON  |  FM 365  |  BEAUMONT  |  0932-02-044  |  08/03/2023  |  $7,617,748.25  |  F 2B23(154)  |  ADD SHOULDERS AND OVERLAY  |  150 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.
TEXAS MATERIALS GROUP, INC.
REMOVING CONC (PAV)
SY 42.000 $20.000 $150.000 $157.500
REMOVING CONC (DRIVEWAYS)
SY 600.000 $20.000 $90.000 $89.250
SUBGRADE WIDENING (ORD COMP)
STA 446.000 $700.000 $500.000 $770.000
BACKFILL (TY A OR B)
STA 446.000 $280.000 $200.000 $306.000
BROADCAST SEED (TEMP) (WARM)
SY 59,363.000 $0.250 $0.120 $0.580
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
SY 59,363.000 $0.500 $0.370 $0.260
VEGETATIVE WATERING
MG 1,000.000 $40.000 $10.000 $66.000
FL BS (CMP IN PLACE)(TYA GR1-2)(IN VEH)
CY 73.000 $80.000 $200.000 $256.250
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 1,000.000 $90.000 $89.550 $191.500
PLANE ASPH CONC PAV(0" TO 2")
SY 4,134.000 $3.000 $3.900 $4.440
PLANE ASPH CONC PAV (1")
SY 19,788.000 $2.000 $2.000 $5.250
RIPRAP (MOW STRIP)(4 IN)
CY 86.000 $800.000 $1,000.000 $840.000
SET (TY II) (36 IN) (RCP) (3: 1) (C)
EA 2.000 $4,000.000 $5,000.000 $5,775.000
MOBILIZATION
LS 1.000 $1,000,000.000 $490,000.000 $380,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000 $10,000.000 $4,000.000 $3,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 500.000 $50.000 $48.000 $50.500
ROCK FILTER DAMS (REMOVE)
LF 500.000 $15.000 $17.000 $10.500
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 1,320.000 $10.000 $9.600 $7.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,320.000 $1.500 $1.900 $2.000
INTERSECTIONS (CONC)
SY 293.000 $125.000 $225.000 $262.500
INTERSECTIONS (ACP)
SY 1,321.000 $50.000 $61.000 $50.000
DRIVEWAYS (CONC)
SY 542.000 $120.000 $225.000 $262.500
DRIVEWAYS (ACP)
SY 43.000 $50.000 $131.000 $360.000
DRIVEWAYS (BASE)
SY 1,064.000 $30.000 $100.000 $119.000
RUMBLE STRIPS (SHOULDER)
LF 89,044.000 $1.000 $0.100 $0.620
RUMBLE STRIPS (CENTERLINE)
LF 44,522.000 $1.000 $0.100 $0.600
MTL W-BEAM GD FEN (TIM POST)
LF 1,150.000 $28.000 $35.000 $27.000
SHORT RADIUS
LF 30.000 $80.000 $450.000 $52.500
TL-3 31" SHORT RADIUS (END ANCHOR)
EA 3.000 $12,000.000 $22,000.000 $18,900.000
GUARDRAIL END TREATMENT (INSTALL)
EA 13.000 $3,000.000 $3,500.000 $3,045.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 53.000 $330.000 $325.000 $309.000
MAILBOX INSTALL-D (TWW-POST) TY 4
EA 1.000 $400.000 $330.000 $330.000
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 7.000 $700.000 $810.000 $708.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 39.000 $600.000 $800.000 $666.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 10.000 $700.000 $910.000 $708.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 2.000 $1,000.000 $1,375.000 $1,076.000
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
EA 1.000 $900.000 $1,490.000 $1,102.000
IN SM RD SN SUP&AM TYS80(1)SA(U-2EXT)
EA 1.000 $1,500.000 $1,700.000 $1,207.000
REMOVE SM RD SN SUP&AM
EA 53.000 $100.000 $150.000 $131.000
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
LF 9,750.000 $0.600 $0.320 $0.400
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 30,702.000 $0.600 $0.320 $0.400
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 4,432.000 $1.300 $1.000 $2.180
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
LF 90,920.000 $0.600 $0.550 $0.800
RE PM W/RET REQ TY I (Y)6"(BRK)(090MIL)
LF 9,750.000 $0.600 $0.550 $0.890
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
LF 30,702.000 $0.600 $0.550 $0.880
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 73.000 $15.000 $18.000 $26.250
REFL PAV MRKR TY II-A-A
EA 884.000 $5.000 $6.000 $8.400
JT / CRCK SEAL (HOT - POURED RUBBER)
LF 89,044.000 $3.000 $1.050 $1.260
D-GR HMA TY-B PG64-22 (EXEMPT)
TON 18,606.000 $120.000 $154.600 $152.000
TACK COAT
GAL 2,538.000 $6.000 $4.000 $27.000
D-GR HMA TY-D PG 64-22 (EXEMPT)
TON 1,089.000 $200.000 $155.000 $233.000
SP MIXES SP-C SAC-A PG76-22
TON 17,115.000 $130.000 $162.300 $170.000
TACK COAT
GAL 9,336.000 $6.000 $4.000 $9.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,000.000 $18,000.000 $14,500.000
TMA (STATIONARY)
DAY 143.000 $350.000 $125.000 $400.000
TMA (MOBILE OPERATION)
DAY 14.000 $350.000 $125.000 $524.000
Totals: $7,617,748.250 $7,997,540.610 $8,722,125.220