Show Job Controls
Bid Cobra

JEFFERSON 9TH AVE (0920-38-294)

Items: 93

County: JEFFERSON
Length: 0.5840 MILES
Highway: 9TH AVE
District: BEAUMONT
Control Number: 0920-38-294
DBE Goal: 4.0%
Project: STP 2025(629)VRUG
Guaranty: $47,000.00
Time: 193 WORKING DAYS
Engineer's Estimate: $2,330,486.06
Date: 08/07/2025 (10 months ago)
Contract Number: 8253021
Type: HAZARD ELIMINATION & SAFETY
Project ID: A00184303
Contract Type: Federal
Project Description: PA_NINTHAVE_1 (2021 HSIP) 9TH AVE AT TURTLE CREEK (IMPROVE TRAFFIC SIGNAL, SAFETY LIGHTING AT INTERSECTION)
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
DAVE COLLINS
RICHARD BRADLEY
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$2,330,486.06
$2,195,951.45
Over/Under Est: -5.77% -$134,534.61
Over/Under Est: 23.3% $542,914.04
Amt Left: 30.85% $677,448.65
Subcontractor Percentage Amount
WILSON BUILDING SERVICES, INC. 24.04% $529,357.78
SEMPER STRIPING LLC 2.86% $62,976.84
Total: 26.90% $592,334.62

Bid Items & Bid Tabulations

93 Total 0 of 93
JEFFERSON  |  9TH AVE  |  BEAUMONT  |  0920-38-294  |  08/07/2025  |  $2,330,486.06  |  STP 2025(629)VRUG  |  HAZARD ELIM & SAFETY  |  193 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
THIRD COAST SERVICES LLC
RAGLE CONSTRUCTION, INC.
REMOV CONC (PAV)
SY 400.000 $34.000 $123.100 $19.000
REMOV CONC (SIDEWALK, RAMP OR SUP)
SY 231.000 $22.000 $104.640 $13.000
REMOV CONC (CURB & GUTTER)
LF 135.000 $11.740 $61.550 $14.000
EXCAV (ROADWAY)
CY 63.250 $94.000 $61.550 $400.000
FURN & PLACE TOPSOIL (8")
SY 341.000 $42.000 $29.100 $20.000
BLOCK SODDING
SY 433.000 $11.000 $6.470 $17.000
VEGETATIVE WATERING
TGL 375.000 $250.000 $55.080 $1.000
D-GR HMA TY-D SAC-B PG64-22
TON 92.000 $255.000 $369.310 $400.000
TACK COAT
GAL 108.000 $37.000 $12.310 $16.000
PLANE & TEXT ASPH CONC PAV(0" TO 2")
SY 1,090.000 $3.900 $12.310 $11.000
CONC PVMT (CRCP) (8")
SY 36.000 $272.000 $369.310 $213.000
CONC PVMT (CRCP) (10")
SY 185.000 $100.000 $381.630 $150.000
CEM STABIL BKFL
CY 50.000 $203.000 $61.550 $128.000
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 184.000 $476.000 $430.890 $517.000
RC PIPE (CL III)(15 IN)
LF 9.000 $108.000 $295.450 $170.000
RC PIPE (CL III)(18 IN)
LF 28.000 $93.000 $270.830 $122.000
RC PIPE (CL III)(24 IN)
LF 300.000 $141.000 $246.210 $165.000
RC PIPE (CL III)(30 IN)
LF 79.000 $161.000 $393.940 $250.000
MANH (COMPL)(PRM)(72IN)
EA 1.000 $11,332.000 $8,617.350 $7,000.000
JCTBOX(COMPL)(PJB)(6FTX6FT)
EA 2.000 $11,542.000 $14,772.590 $11,500.000
INLET (COMP)(TY C)
EA 3.000 $6,750.000 $8,617.350 $11,700.000
INLET (COMPL)(TY BB)
EA 7.000 $6,750.000 $7,386.300 $11,700.000
REMOV STR (INLET)
EA 9.000 $1,492.000 $1,231.050 $950.000
REMOV STR (MANHOLE)
EA 1.000 $2,000.000 $1,231.050 $1,300.000
REMOV STR (PIPE)
LF 220.000 $35.000 $36.930 $33.000
MOBILIZATION
LS 1.000 $212,771.460 $219,595.450 $280,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 13.000 $2,500.000 $1,732.910 $54,600.000
TMA (STATIONARY)
DAY 360.000 $200.000 $408.830 $200.000
TMA (MOBILE OPERATION)
DAY 60.000 $200.000 $568.680 $675.000
CONC CURB & GUTTER (TY II)
LF 1,172.000 $48.000 $86.170 $32.000
CONC SIDEWALKS (4")
SY 177.000 $111.000 $184.660 $66.000
CURB RAMPS (TY 2)
SY 8.000 $3,623.000 $8,001.820 $2,200.000
CONDT (PVC) (SCH 40) (2")
LF 600.000 $18.000 $16.220 $14.100
CONDT (PVC) (SCH 40) (4")
LF 245.000 $22.500 $19.140 $20.400
CONDT (PVC) (SCH 80) (4") (BORE)
LF 915.000 $32.500 $32.960 $42.900
ELEC CONDR (NO.8) BARE
LF 1,715.000 $1.950 $2.450 $1.800
ELEC CONDR (NO.6) BARE
LF 45.000 $2.350 $2.350 $2.060
ELEC CONDR (NO.6) INSULATED
LF 90.000 $2.580 $3.180 $2.650
TRAY CABLE (4 CONDR) (12 AWG)
LF 2,330.000 $3.740 $4.110 $3.750
GROUND BOX TY C (162911)W/APRON
EA 1.000 $2,350.000 $1,251.410 $1,294.000
GROUND BOX TY D (162922)W/APRON
EA 15.000 $1,920.000 $1,263.850 $1,314.000
ELC SRV TY D 120/240 070(NS)SS(E)PS(U)
EA 3.000 $11,420.000 $9,202.940 $11,456.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 6.000 $800.000 $1,240.810 $668.000
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 1,710.000 $1.150 $1.050 $1.000
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 105.000 $14.530 $4.920 $8.000
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 4,175.000 $1.110 $1.050 $1.000
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 1,200.000 $1.660 $2.640 $1.750
REFL PAV MRK TY I (W)6"(BRK)(090MIL)
LF 1,270.000 $0.940 $1.170 $1.100
REFL PAV MRK TY I (W)6"(SLD)(090MIL)
LF 2,065.000 $0.850 $1.170 $1.000
REFL PAV MRK TY I (Y)6"(SLD)(090MIL)
LF 8,190.000 $0.850 $1.170 $1.000
PREFAB PM TY C (W)(24")(SLD)
LF 1,165.000 $19.800 $16.990 $16.250
PREFAB PM TY C (W)(ARROW)
EA 13.000 $275.000 $350.850 $273.000
PREFAB PM TY C (W)(WORD)
EA 11.000 $321.000 $443.180 $385.000
PREFAB PM TY C (Y)(24")(SLD)
LF 600.000 $15.000 $16.990 $16.250
REFL PAV MRKR TY I-C
EA 117.000 $7.000 $6.780 $5.000
REFL PAV MRKR TY II-A-A
EA 390.000 $7.000 $6.780 $5.000
REFL PAV MRKR TY II-C-R
EA 59.000 $7.000 $6.780 $5.000
ELIM EXT PM & MRKS (4")
LF 5,515.000 $0.520 $0.490 $0.410
ELIM EXT PM & MRKS (8")
LF 1,915.000 $0.820 $0.980 $0.750
ELIM EXT PM & MRKS (24")
LF 430.000 $3.100 $2.220 $3.250
ELIM EXT PM & MRKS (ARROW)
EA 31.000 $56.000 $55.400 $45.000
ELIM EXT PM & MRKS (DBL ARROW)
EA 5.000 $73.000 $55.400 $75.000
PAV SURF PREP FOR MRK (6")
LF 11,525.000 $0.030 $0.130 $0.100
PAV SURF PREP FOR MRK (8")
LF 1,200.000 $0.120 $0.180 $0.200
PAV SURF PREP FOR MRK (24")
LF 1,765.000 $1.100 $0.620 $0.650
PAV SURF PREP FOR MRK (ARROW)
EA 13.000 $27.000 $24.620 $9.000
PAV SURF PREP FOR MRK (WORD)
EA 11.000 $31.000 $24.620 $9.000
INSTALL HWY TRF SIG (ISOLATED)
EA 3.000 $46,260.000 $45,423.020 $100,000.000
REMOVING TRAFFIC SIGNALS
EA 2.000 $3,500.000 $2,995.640 $25,000.000
VEH SIG SEC (12")LED(GRN)
EA 25.000 $333.000 $347.640 $280.000
VEH SIG SEC (12")LED(GRN ARW)
EA 11.000 $338.000 $352.620 $280.000
VEH SIG SEC (12")LED(YEL)
EA 25.000 $334.000 $347.640 $280.000
VEH SIG SEC (12")LED(YEL ARW)
EA 11.000 $348.000 $352.620 $280.000
VEH SIG SEC (12")LED(RED)
EA 25.000 $335.000 $347.640 $280.000
VEH SIG SEC (12")LED(RED ARW)
EA 19.000 $370.000 $352.620 $280.000
PED SIG SEC (LED)(COUNTDOWN)
EA 24.000 $1,110.000 $746.470 $558.000
BACKPLATE W/REF BRDR(3 SEC)(VENT)ALUM
EA 27.000 $216.000 $159.470 $234.000
BACKPLATE W/REF BRDR(4 SEC)(VENT)ALUM
EA 11.000 $286.000 $229.220 $272.000
TRF SIG CBL (TY A)(12 AWG)(2 CONDR)
LF 2,145.000 $2.600 $2.620 $2.200
TRF SIG CBL (TY A)(12 AWG)(3 CONDR)
LF 3,345.000 $3.000 $3.080 $2.550
TRF SIG CBL (TY A)(12 AWG)(5 CONDR)
LF 6,035.000 $3.600 $3.920 $3.300
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
LF 1,925.000 $4.100 $4.770 $3.950
INS TRF SIG PL AM(S)(ORN) 1 ARM(36')LUM
EA 3.000 $40,000.000 $20,636.900 $20,201.000
INS TRF SIG PL AM(S)(ORN) 1 ARM(40')LUM
EA 1.000 $45,000.000 $21,253.080 $20,807.000
INS TRF SIG PL AM(S)(ORN) 1 ARM(44')LUM
EA 7.000 $50,000.000 $22,024.930 $21,672.000
INS TRF SIG PL AM(S)(ORN) 1 ARM(24')LUM
EA 1.000 $35,000.000 $15,712.720 $15,185.000
INS PED PL AM (ORN)(12')
EA 22.000 $5,500.000 $4,856.020 $6,932.000
INS PED PL AM (ORN)(18')
EA 2.000 $6,500.000 $6,723.340 $9,559.000
PED DETECT PUSH BUTTON (APS)
EA 24.000 $1,372.000 $1,109.130 $817.000
PED DETECTOR CONTROLLER UNIT
EA 3.000 $4,546.000 $3,546.200 $3,844.000
ILSN (6 D)
EA 8.000 $2,784.000 $3,160.690 $3,818.000
ILSN (8D)
EA 4.000 $3,500.000 $3,633.130 $4,281.000
RVDS (PRESENCE AND ADVANCE DETECTION)
EA 12.000 $15,000.000 $7,602.670 $7,323.000
Totals: $2,330,486.060 $2,195,951.448 $2,873,400.100
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $5,000.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $5,000.00
Total: $10,000.00