JEFFERSON ERIE ST (0920-38-287)

Items: 79

County: JEFFERSON
Length: 0.0800 MILES
Highway: ERIE ST
District: BEAUMONT
Control Number: 0920-38-287
DBE Goal: 0.0%
Project: BR 2024(674)
Guaranty: $73,000.00
Time: 125 WORKING DAYS
Engineer's Estimate: $3,223,814.05
Date: 06/03/2026 (7 days ago)
Contract Number: 6263220
Type: BRIDGE REPLACEMENT
Project ID: A00183477
Contract Type: Federal
Project Description: ERIE ST@ LNVA CANAL-BRIDGE REPLACEMENT
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
DAVE COLLINS
RICHARD BRADLEY
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$3,223,814.05
Over/Under Est: -5.02% -$161,694.82
Over/Under Est: 2.27% $73,073.70
Amt Left: 7.67% $234,768.52
$3,748,800.71
Over/Under Est: 16.28% $524,986.66
Amt Left: 22.43% $686,681.48
Delta: -13.71% -$451,912.96
Over/Under Est: 58.77% $1,894,488.52
Amt Left: 67.15% $2,056,183.34
Delta: -36.53% -$1,369,501.86

Bid Items & Bid Tabulations

79 Total 0 of 79
JEFFERSON  |  ERIE ST  |  BEAUMONT  |  0920-38-287  |  06/03/2026  |  $3,223,814.05  |  BR 2024(674)  |  BRIDGE REPL  |  125 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
R CONSTRUCTION CIVIL, LLC
ELITE CONTRACTORS AND EQUIPMENT LTD
ISI CONTRACTING, INC.
RAGLE CONSTRUCTION, INC.
PREPARING ROW
STA 10.000 $12,500.000 $3,450.000 $1,200.000 $1,808.000 $43,000.000
REMOV CONC (RIPRAP)
SY 51.000 $12.000 $62.000 $20.000 $24.000 $30.000
REMOV CONC (DRIVEWAYS)
SY 40.000 $15.500 $78.000 $20.000 $29.000 $49.000
REMOV CONC (SAWCUT)
LF 85.000 $25.000 $25.000 $20.000 $9.000 $12.000
RMV (0"-10") TRT/UNTRT BASE & ASPH PAV
SY 2,183.000 $16.000 $8.000 $8.000 $51.000 $15.000
EXCAV (ROADWAY)
CY 1,457.000 $15.000 $33.000 $15.000 $38.000 $50.000
EMBANK (FNL)(OC)(TY C)
CY 3,773.000 $23.197 $25.000 $25.000 $36.000 $42.000
BACKFILL (TY A OR B)
STA 10.000 $165.000 $1,200.000 $500.000 $2,018.000 $664.000
BROADCAST SEED (TEMP_WARM)
SY 3,056.500 $0.200 $0.250 $0.500 $0.530 $0.220
BROADCAST SEED (TEMP_COOL)
SY 2,342.000 $0.150 $0.250 $0.500 $0.260 $0.220
HYDRO MULCH SEED (PERM_RURAL_SANDY)
SY 6,113.000 $0.523 $0.600 $1.000 $0.460 $0.550
VEGETATIVE WATERING
TGL 103.000 $14.430 $250.000 $10.000 $135.000 $63.000
PROOF ROLLING
HR 30.000 $138.000 $660.000 $100.000 $113.000 $105.000
FL BS (CMP IN PLC)(TY A GR 1-2)
TON 791.000 $5.000 $83.000 $83.000 $26.000 $78.000
FL BS (CMP IN PLC)(TY A GR 1-2) (12")
SY 2,080.000 $45.000 $56.000 $50.000 $34.000 $51.000
PRIME COAT (AE-P)
GAL 575.000 $7.450 $7.000 $12.000 $18.000 $13.000
D-GR HMA TY-C PG76-22 (EXEMPT)
TON 316.000 $125.000 $290.000 $275.000 $297.000 $350.000
TACK COAT
GAL 173.000 $4.100 $7.000 $10.000 $6.000 $12.000
CEM STABIL BKFL
CY 259.000 $125.000 $108.000 $155.000 $135.000 $127.000
TEMPORARY SPL SHORING (COFFERDAM)
SF 6,455.000 $55.000 $35.000 $30.000 $32.000 $60.000
PRESTR CONC PIL (16 IN SQ)
LF 770.000 $175.000 $520.000 $180.000 $307.000 $166.000
CL C CONC (ABUT)
CY 20.600 $1,250.000 $767.000 $1,750.000 $2,169.000 $1,200.000
CL C CONC (CAP)
CY 15.200 $1,260.000 $1,260.000 $2,300.000 $2,574.000 $2,200.000
CL E CONC (SEAL SLAB)(NON-REINF)
CY 32.000 $550.000 $490.000 $425.000 $711.000 $600.000
REINF CONC SLAB (SLAB BEAM)
SF 3,309.000 $35.000 $24.000 $30.000 $49.000 $28.000
APPROACH SLAB
CY 44.900 $695.000 $840.000 $820.000 $1,267.000 $760.000
PRESTR CONC SLAB BEAM (5SB15)
LF 651.000 $255.504 $240.000 $275.000 $289.000 $272.000
RIPRAP (CONC)(5 IN)
CY 183.000 $625.000 $700.000 $500.000 $490.000 $696.000
RIPRAP (MOW STRIP)(4 IN)
CY 19.600 $638.630 $776.000 $800.000 $671.000 $615.000
RAIL (TY T221)
LF 244.000 $183.859 $300.000 $150.000 $262.000 $120.000
ARMOR JOINT (SEALED)
LF 59.000 $155.475 $125.000 $180.000 $107.000 $153.000
CONC BOX CULV (9 FT X 9 FT)
LF 168.000 $1,475.000 $1,300.000 $1,700.000 $1,012.000 $1,611.000
RC PIPE (CL III)(12 IN)
LF 52.000 $64.000 $95.000 $94.000 $85.000 $118.000
RC PIPE (CL III)(18 IN)
LF 254.000 $89.653 $99.000 $96.000 $138.000 $147.000
RC PIPE (CL III)(24 IN)
LF 124.000 $114.307 $152.000 $105.000 $119.000 $178.000
RC PIPE (CL III)(36 IN)
LF 114.000 $175.453 $214.000 $168.000 $175.000 $225.000
SET (TY I)(S= 9 FT)(HW= 10 FT)(3:1)(C)
EA 6.000 $25,000.000 $20,000.000 $20,250.000 $20,468.000 $21,000.000
SET (TY II) (12 IN) (RCP) (6: 1) (P)
EA 2.000 $1,250.000 $2,300.000 $1,100.000 $2,806.000 $1,927.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 5.000 $1,288.570 $2,700.000 $1,100.000 $2,900.000 $2,100.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 2.000 $2,052.060 $2,900.000 $1,500.000 $3,168.000 $2,150.000
SET (TY II) (36 IN) (RCP) (4: 1) (C)
EA 2.000 $4,250.000 $5,125.000 $3,500.000 $3,833.000 $4,000.000
SET (TY II)(18 IN)(RCP)(3:1)(P)
EA 1.000 $3,500.000 $2,430.000 $1,800.000 $2,764.000 $2,550.000
REMOV STR (PIPE)
LF 290.000 $27.000 $32.000 $20.000 $45.000 $24.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 2.000 $24,000.000 $54,000.000 $30,000.000 $71,986.000 $100,000.000
MOBILIZATION
LS 1.000 $300,000.000 $70,000.000 $200,000.000 $250,000.000 $500,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 9.000 $8,250.000 $5,000.000 $5,000.000 $10,619.000 $15,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 226.000 $42.709 $50.000 $50.000 $36.810 $48.000
ROCK FILTER DAMS (REMOVE)
LF 226.000 $11.003 $15.000 $12.000 $15.780 $15.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 360.000 $31.000 $45.000 $30.000 $26.290 $45.000
CONSTRUCTION EXITS (REMOVE)
SY 360.000 $11.900 $12.000 $10.000 $10.520 $12.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,493.000 $4.218 $5.000 $4.000 $2.370 $5.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,493.000 $1.212 $1.000 $1.500 $0.630 $1.000
CONSTRUCTING DETOURS (TY3)
SY 1,195.000 $200.000 $45.000 $150.000 $136.000 $135.000
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 220.000 $43.500 $85.000 $36.000 $85.000 $42.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 40.000 $48.500 $90.000 $50.000 $97.000 $42.000
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 220.000 $11.304 $13.000 $12.000 $18.830 $20.000
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 40.000 $15.000 $13.000 $50.000 $8.160 $20.000
DRIVEWAYS (CONC)
SY 40.000 $115.000 $140.000 $180.000 $324.000 $135.000
DRIVEWAYS (ACP)
SY 934.000 $50.000 $37.000 $50.000 $65.000 $87.000
DRIVEWAYS (BASE)
SY 1,124.000 $32.500 $43.000 $30.000 $60.000 $66.000
MTL W-BEAM GD FEN (TIM POST)
LF 725.000 $26.450 $26.000 $35.000 $48.000 $29.950
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $1,950.000 $1,950.000 $2,000.000 $1,696.000 $2,050.000
DRIVEWAY TERMINAL ANCHOR SECTION
EA 2.000 $450.000 $1,300.000 $1,600.000 $2,130.000 $1,340.000
MTL W-BEAM GD FEN (SPECIAL)
LF 175.000 $32.000 $57.000 $80.000 $78.000 $63.500
GUARDRAIL END TREATMENT (INSTALL)
EA 6.000 $3,006.410 $3,170.000 $3,400.000 $3,932.000 $3,455.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL2)
EA 4.000 $27,000.000 $25,000.000 $32,500.000 $34,889.000 $32,150.000
RELOCATE EXISTING MAILBOX
EA 1.000 $403.750 $335.000 $250.000 $642.360 $280.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 1.000 $650.000 $1,775.000 $780.000 $348.150 $965.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 1.000 $775.000 $1,900.000 $880.000 $348.150 $1,115.000
REMOVE SM RD SN SUP&AM
EA 3.000 $102.140 $240.000 $150.000 $84.490 $110.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BI)
EA 14.000 $26.360 $21.000 $25.000 $3.560 $24.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 4,085.000 $1.000 $1.000 $2.000 $1.360 $0.900
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 18.000 $6.750 $17.000 $16.000 $7.940 $16.000
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 3,200.000 $0.800 $1.000 $1.500 $1.600 $0.900
PREFAB PM TY C (W)(24")(SLD)
LF 12.000 $13.520 $31.000 $30.000 $21.560 $30.000
POST AND CABLE FENCE (REMOVAL)
LF 380.000 $4.301 $3.000 $10.000 $5.520 $3.000
POST AND CABLE FENCE (NEW INSTALLATION)
LF 367.000 $12.000 $15.000 $40.000 $26.030 $18.000
TEMPORARY DETOUR BRIDGE
EA 1.000 $178,000.000 $190,000.000 $500,000.000 $435,303.000 $1,000,000.000
RESIDENTIAL DRIVEWAY TEMP SIGNAL SYSTEM
MO 4.000 $17,500.000 $12,250.000 $20,000.000 $17,304.000 $11,500.000
Totals: $3,223,814.057 $3,062,119.225 $3,296,887.750 $3,748,800.705 $5,118,302.570
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $20,000.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $20,000.00
Total: $40,000.00