|
|
PREPARING ROW
|
AC
|
0.470
|
$8,000.000
|
$7,500.000
|
$31,500.000
|
$12,400.000
|
$15,000.000
|
$37,000.000
|
$68,000.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
828.000
|
$25.000
|
$14.500
|
$6.100
|
$34.000
|
$45.000
|
$14.000
|
$17.700
|
|
|
REMOVING STAB BASE AND ASPH PAV (6")
|
SY
|
1,252.000
|
$6.000
|
$5.100
|
$5.750
|
$7.000
|
$6.500
|
$4.000
|
$8.250
|
|
|
REMOVING STAB BASE & ASPH PAV (9")
|
SY
|
5,681.000
|
$7.000
|
$5.100
|
$3.500
|
$6.200
|
$6.500
|
$7.000
|
$6.750
|
|
|
REMOVING STAB BASE AND ASPH PAV(8")
|
SY
|
783.000
|
$7.000
|
$6.600
|
$3.500
|
$9.500
|
$7.500
|
$6.000
|
$11.000
|
|
|
REMOVING STAB BASE & ASPH PAV(15"-16")
|
SY
|
1,542.000
|
$12.000
|
$9.100
|
$4.700
|
$11.000
|
$12.000
|
$11.000
|
$12.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
5,926.000
|
$8.000
|
$10.500
|
$20.000
|
$13.000
|
$18.000
|
$18.000
|
$10.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
4,642.000
|
$11.000
|
$23.000
|
$24.000
|
$15.000
|
$25.000
|
$15.000
|
$23.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
20,912.000
|
$1.000
|
$3.200
|
$3.250
|
$3.600
|
$2.500
|
$1.000
|
$4.750
|
|
|
BLOCK SODDING
|
SY
|
2,279.000
|
$3.000
|
$3.550
|
$5.850
|
$3.810
|
$10.000
|
$4.500
|
$5.000
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
9,319.000
|
$0.100
|
$0.120
|
$0.300
|
$0.130
|
$0.300
|
$0.900
|
$0.150
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
9,319.000
|
$0.100
|
$0.120
|
$0.300
|
$0.130
|
$0.300
|
$0.650
|
$0.150
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
|
SY
|
18,633.000
|
$0.250
|
$0.300
|
$0.400
|
$0.300
|
$0.450
|
$0.450
|
$0.350
|
|
|
VEGETATIVE WATERING
|
MG
|
352.000
|
$12.000
|
$13.500
|
$35.000
|
$60.000
|
$25.000
|
$25.000
|
$28.000
|
|
|
PROOF ROLLING
|
HR
|
40.000
|
$75.000
|
$95.000
|
$138.000
|
$55.000
|
$100.000
|
$120.000
|
$159.000
|
|
|
LIME TRT (EXST MATL) (6")
|
SY
|
14,806.000
|
$3.000
|
$3.900
|
$3.500
|
$4.910
|
$10.500
|
$2.400
|
$10.500
|
|
|
LIME (HYDRATED OR COMMERCIAL)(SLURRY)
|
TON
|
222.000
|
$160.000
|
$180.000
|
$207.000
|
$200.000
|
$350.000
|
$190.000
|
$200.000
|
|
|
CEM TRT(PLNT MX) (CL L)(TYA)(GR1-2)(6")
|
SY
|
14,806.000
|
$12.000
|
$16.500
|
$18.700
|
$17.800
|
$15.000
|
$25.000
|
$17.200
|
|
|
ASPHALT STAB BASE (GR 4)(PG 64)
|
TON
|
5,089.000
|
$95.000
|
$69.000
|
$78.800
|
$85.000
|
$90.000
|
$140.000
|
$99.000
|
|
|
PRIME COAT (AE-P)
|
GAL
|
2,962.000
|
$5.000
|
$4.100
|
$2.800
|
$5.440
|
$5.500
|
$11.000
|
$8.000
|
|
|
ASPH (AC-20-5TR OR AC-20XP)
|
GAL
|
3,741.000
|
$3.200
|
$3.000
|
$3.100
|
$5.000
|
$5.750
|
$5.800
|
$8.000
|
|
|
AGGR(TY-PD GR-4 OR TY-PL GR-4)
|
CY
|
79.000
|
$250.000
|
$230.000
|
$182.000
|
$305.710
|
$400.000
|
$330.000
|
$490.000
|
|
|
D-GR HMA(SQ) TY-D PG64-22
|
TON
|
814.000
|
$75.000
|
$109.000
|
$108.000
|
$157.750
|
$130.000
|
$170.000
|
$150.000
|
|
|
D-GR HMA (SQ) TY-D PG64_22(LEVEL-UP)
|
TON
|
542.000
|
$135.000
|
$103.000
|
$93.400
|
$151.220
|
$125.000
|
$165.000
|
$148.000
|
|
|
TOM (ASPHALT) PG 76-22
|
TON
|
95.000
|
$103.000
|
$130.000
|
$127.000
|
$171.900
|
$560.000
|
$180.000
|
$673.500
|
|
|
TOM-C (AGGREGATE) SAC-A
|
TON
|
1,484.000
|
$106.000
|
$118.000
|
$127.000
|
$155.580
|
$100.000
|
$170.000
|
$114.000
|
|
|
PLANE ASPH CONC PAV (8")
|
SY
|
1,252.000
|
$3.000
|
$5.100
|
$3.300
|
$7.000
|
$8.000
|
$15.000
|
$7.250
|
|
|
PLANE ASPH CONC PAV (3"- 5")
|
SY
|
5,681.000
|
$2.500
|
$2.050
|
$2.900
|
$3.510
|
$7.500
|
$12.000
|
$4.000
|
|
|
CONC PVMT (CONT REINF - CRCP) (9")
|
SY
|
13,654.000
|
$50.000
|
$55.000
|
$61.000
|
$75.000
|
$52.000
|
$56.000
|
$83.000
|
|
|
CONC PVMT (CONT REINF)(FAST TRK)(12")
|
SY
|
529.000
|
$100.000
|
$78.000
|
$98.000
|
$220.000
|
$90.000
|
$70.000
|
$111.000
|
|
|
CEM STABIL BKFL
|
CY
|
113.000
|
$150.000
|
$63.000
|
$61.000
|
$62.000
|
$55.000
|
$66.000
|
$62.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (36 IN)
|
LF
|
59.000
|
$350.000
|
$400.000
|
$350.000
|
$408.000
|
$454.000
|
$227.000
|
$463.000
|
|
|
CL A CONC (COLLAR)
|
EA
|
10.000
|
$800.000
|
$510.000
|
$520.000
|
$500.000
|
$1,500.000
|
$2,500.000
|
$1,430.000
|
|
|
RIPRAP (CONC) (CL B) (4")
|
CY
|
8.000
|
$400.000
|
$510.000
|
$910.000
|
$500.000
|
$750.000
|
$750.000
|
$1,030.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
31.000
|
$500.000
|
$510.000
|
$715.000
|
$500.000
|
$700.000
|
$725.000
|
$790.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
868.000
|
$50.000
|
$50.000
|
$64.000
|
$49.000
|
$60.000
|
$65.000
|
$56.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
836.000
|
$60.000
|
$59.000
|
$75.000
|
$58.000
|
$62.000
|
$78.000
|
$70.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
516.000
|
$100.000
|
$82.000
|
$91.000
|
$81.000
|
$75.000
|
$106.000
|
$87.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (C)
|
EA
|
4.000
|
$1,000.000
|
$740.000
|
$810.000
|
$730.000
|
$1,000.000
|
$1,100.000
|
$1,990.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
26.000
|
$1,000.000
|
$740.000
|
$810.000
|
$730.000
|
$1,500.000
|
$970.000
|
$1,114.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
32.000
|
$1,300.000
|
$1,010.000
|
$1,345.000
|
$1,000.000
|
$1,500.000
|
$1,300.000
|
$1,355.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$1,750.000
|
$1,790.000
|
$2,130.000
|
$1,800.000
|
$1,500.000
|
$2,500.000
|
$4,427.000
|
|
|
REMOV STR (SET)
|
EA
|
29.000
|
$300.000
|
$204.000
|
$200.000
|
$200.000
|
$600.000
|
$1,100.000
|
$469.000
|
|
|
REMOV STR (PIPE)
|
LF
|
1,243.000
|
$15.000
|
$13.200
|
$18.000
|
$13.000
|
$35.000
|
$23.000
|
$7.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$300,000.000
|
$257,900.000
|
$347,000.000
|
$320,000.000
|
$301,350.000
|
$375,000.000
|
$400,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
12.000
|
$5,000.000
|
$2,500.000
|
$1,750.000
|
$2,620.000
|
$13,000.000
|
$4,000.000
|
$3,843.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
97.000
|
$25.000
|
$30.000
|
$35.000
|
$33.000
|
$30.000
|
$35.000
|
$32.500
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
97.000
|
$10.000
|
$8.100
|
$10.000
|
$9.000
|
$10.000
|
$10.000
|
$9.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
333.000
|
$15.000
|
$29.000
|
$16.000
|
$28.500
|
$30.000
|
$25.000
|
$31.350
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
333.000
|
$10.000
|
$7.100
|
$5.000
|
$7.000
|
$10.000
|
$8.200
|
$7.700
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
1,178.000
|
$4.500
|
$5.100
|
$6.000
|
$5.000
|
$11.000
|
$4.000
|
$5.500
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,178.000
|
$1.000
|
$1.000
|
$1.500
|
$1.000
|
$3.000
|
$1.250
|
$1.100
|
|
|
COLORED TEXTURED CONC (6")
|
SY
|
1,183.000
|
$70.000
|
$71.000
|
$86.000
|
$71.000
|
$100.000
|
$86.000
|
$86.000
|
|
|
CONC CURB (MONO) (TY II)
|
LF
|
1,256.000
|
$3.000
|
$14.000
|
$6.200
|
$5.000
|
$40.000
|
$3.700
|
$10.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
1,716.000
|
$85.000
|
$66.000
|
$67.600
|
$66.000
|
$70.000
|
$85.000
|
$61.500
|
|
|
DRIVEWAYS (ACP)
|
SY
|
484.000
|
$35.000
|
$74.000
|
$63.000
|
$66.000
|
$50.000
|
$32.000
|
$33.000
|
|
|
TURNOUTS (ACP)
|
SY
|
55.000
|
$47.000
|
$260.000
|
$85.000
|
$66.000
|
$50.000
|
$32.000
|
$71.500
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
325.000
|
$20.000
|
$19.000
|
$27.000
|
$20.000
|
$30.000
|
$17.000
|
$20.500
|
|
|
SHORT RADIUS
|
LF
|
25.000
|
$20.000
|
$32.500
|
$54.000
|
$35.000
|
$53.250
|
$60.000
|
$35.200
|
|
|
DRIVEWAY TERMINAL ANCHOR SECTION
|
EA
|
2.000
|
$1,000.000
|
$800.000
|
$1,170.000
|
$875.000
|
$1,150.000
|
$1,200.000
|
$875.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
3.000
|
$950.000
|
$930.000
|
$1,520.000
|
$1,020.000
|
$1,495.000
|
$915.000
|
$1,018.000
|
|
|
MTL BM GD FEN (LONG SPAN SYSTEM)
|
LF
|
150.000
|
$25.000
|
$20.400
|
$30.000
|
$22.000
|
$29.500
|
$16.000
|
$22.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
3.000
|
$2,200.000
|
$2,050.000
|
$2,545.000
|
$2,230.000
|
$2,500.000
|
$2,500.000
|
$2,228.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
2.000
|
$220.000
|
$198.000
|
$320.000
|
$215.000
|
$300.000
|
$315.000
|
$215.000
|
|
|
MAILBOX INSTALL-D (TWW-POST) TY 4
|
EA
|
2.000
|
$225.000
|
$209.000
|
$470.000
|
$225.000
|
$300.000
|
$380.000
|
$226.000
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
1.000
|
$530.000
|
$480.000
|
$585.000
|
$522.000
|
$600.000
|
$442.000
|
$523.000
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
70.000
|
$6.000
|
$15.700
|
$7.300
|
$10.880
|
$20.000
|
$15.000
|
$17.000
|
|
|
CONDT (PVC) (SCH 80) (3")
|
LF
|
300.000
|
$11.000
|
$19.100
|
$11.650
|
$13.060
|
$25.000
|
$17.000
|
$21.000
|
|
|
CONDT (PVC) (SCH 80) (4")
|
LF
|
30.000
|
$16.000
|
$21.100
|
$14.450
|
$14.140
|
$30.000
|
$20.000
|
$23.000
|
|
|
CONDT (PVC) (SCH 80) (4") (BORE)
|
LF
|
830.000
|
$20.000
|
$35.000
|
$18.600
|
$18.500
|
$40.150
|
$28.000
|
$38.500
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
1,235.000
|
$2.000
|
$2.040
|
$1.600
|
$1.580
|
$3.000
|
$1.700
|
$2.200
|
|
|
ELEC CONDR (NO.4) BARE
|
LF
|
70.000
|
$3.000
|
$2.550
|
$1.950
|
$2.180
|
$4.000
|
$2.200
|
$2.750
|
|
|
ELEC CONDR (NO.4) INSULATED
|
LF
|
130.000
|
$5.000
|
$3.050
|
$2.040
|
$2.180
|
$4.000
|
$2.400
|
$3.300
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
5.000
|
$950.000
|
$980.000
|
$1,145.000
|
$788.760
|
$1,500.000
|
$950.000
|
$1,073.000
|
|
|
ELC SRV TY D 120/240 070(NS)SS(E)SP(O)
|
EA
|
1.000
|
$5,000.000
|
$7,800.000
|
$5,120.000
|
$4,895.760
|
$8,900.000
|
$4,800.000
|
$8,510.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
26.000
|
$450.000
|
$370.000
|
$425.000
|
$398.000
|
$500.000
|
$460.000
|
$402.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
3.000
|
$550.000
|
$480.000
|
$555.000
|
$517.000
|
$700.000
|
$600.000
|
$523.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
4.000
|
$675.000
|
$660.000
|
$760.000
|
$707.000
|
$800.000
|
$820.000
|
$715.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
1.000
|
$750.000
|
$640.000
|
$740.000
|
$680.000
|
$1,000.000
|
$800.000
|
$693.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
25.000
|
$70.000
|
$76.000
|
$50.000
|
$76.000
|
$75.000
|
$98.000
|
$83.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
12.000
|
$95.000
|
$51.000
|
$58.500
|
$54.000
|
$75.000
|
$63.000
|
$50.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
12.000
|
$25.000
|
$15.200
|
$17.000
|
$16.000
|
$52.000
|
$19.000
|
$17.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
3,320.000
|
$0.200
|
$0.400
|
$0.500
|
$0.420
|
$0.500
|
$0.150
|
$0.500
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
30.000
|
$2.500
|
$2.040
|
$2.350
|
$2.180
|
$2.750
|
$5.050
|
$2.200
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
3,320.000
|
$0.200
|
$0.400
|
$0.500
|
$0.420
|
$0.500
|
$0.150
|
$0.500
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
8,965.000
|
$0.750
|
$0.460
|
$0.550
|
$0.490
|
$0.800
|
$0.550
|
$0.500
|
|
|
WK ZN PAV MRK REMOV (W)8"(SLD)
|
LF
|
120.000
|
$1.200
|
$1.020
|
$1.150
|
$1.090
|
$2.500
|
$4.000
|
$1.100
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
40.000
|
$7.000
|
$3.050
|
$3.500
|
$3.260
|
$3.750
|
$10.000
|
$3.300
|
|
|
WK ZN PAV MRK REMOV (W)(ARROW)
|
EA
|
2.000
|
$100.000
|
$153.000
|
$175.000
|
$163.190
|
$200.000
|
$82.000
|
$165.000
|
|
|
WK ZN PAV MRK REMOV (W)(WORD)
|
EA
|
2.000
|
$120.000
|
$168.000
|
$195.000
|
$179.510
|
$200.000
|
$107.000
|
$182.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
8,610.000
|
$0.750
|
$0.460
|
$0.500
|
$0.490
|
$1.000
|
$0.550
|
$0.500
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
4,765.000
|
$0.750
|
$0.660
|
$0.750
|
$0.710
|
$1.200
|
$0.750
|
$0.750
|
|
REFL PAV MRK TY I (W)12"(SLD)(090MIL)
|
LF
|
192.000
|
$2.500
|
$2.550
|
$2.900
|
$2.720
|
$4.000
|
$2.500
|
$2.750
|
|
|
PAVEMENT SEALER 4"
|
LF
|
27,230.000
|
$0.150
|
$0.150
|
$0.200
|
$0.160
|
$0.300
|
$0.060
|
$0.200
|
|
|
PAVEMENT SEALER 8"
|
LF
|
4,765.000
|
$0.250
|
$0.300
|
$0.350
|
$0.330
|
$0.600
|
$0.150
|
$0.330
|
|
|
PAVEMENT SEALER 12"
|
LF
|
192.000
|
$1.000
|
$1.250
|
$1.500
|
$1.360
|
$2.000
|
$0.250
|
$1.400
|
|
|
PAVEMENT SEALER 24"
|
LF
|
168.000
|
$1.750
|
$2.300
|
$2.650
|
$2.450
|
$3.000
|
$0.650
|
$2.500
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
10.000
|
$25.000
|
$61.000
|
$70.000
|
$65.280
|
$70.000
|
$13.000
|
$66.000
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
10.000
|
$35.000
|
$51.000
|
$58.000
|
$54.400
|
$70.000
|
$15.000
|
$55.000
|
|
|
PAVEMENT SEALER (DBL ARROW)
|
EA
|
2.000
|
$80.000
|
$112.000
|
$129.000
|
$119.680
|
$150.000
|
$19.000
|
$121.000
|
|
|
PAVEMENT SEALER (LNDP ARROW)
|
EA
|
4.000
|
$40.000
|
$102.000
|
$117.000
|
$108.800
|
$125.000
|
$25.000
|
$110.000
|
|
|
PAVEMENT SEALER (RR XING)
|
EA
|
2.000
|
$35.000
|
$255.000
|
$290.000
|
$271.990
|
$300.000
|
$32.000
|
$275.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
|
LF
|
1,210.000
|
$0.300
|
$0.310
|
$0.350
|
$0.340
|
$0.600
|
$0.500
|
$0.340
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
11,180.000
|
$0.250
|
$0.310
|
$0.350
|
$0.340
|
$0.600
|
$0.500
|
$0.340
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
|
LF
|
740.000
|
$0.300
|
$0.310
|
$0.350
|
$0.340
|
$0.450
|
$0.500
|
$0.340
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
14,100.000
|
$0.250
|
$0.310
|
$0.350
|
$0.340
|
$0.500
|
$0.500
|
$0.340
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
168.000
|
$15.000
|
$11.200
|
$13.000
|
$11.970
|
$15.000
|
$15.000
|
$12.100
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
10.000
|
$200.000
|
$149.000
|
$170.000
|
$192.000
|
$220.000
|
$208.000
|
$193.000
|
|
PREFAB PAV MRK TY C (W) (DBL ARROW)
|
EA
|
2.000
|
$450.000
|
$255.000
|
$290.000
|
$324.000
|
$400.000
|
$240.000
|
$325.000
|
|
PREFAB PAV MRK TY C (W) (LNDP ARROW)
|
EA
|
4.000
|
$425.000
|
$405.000
|
$470.000
|
$523.000
|
$550.000
|
$570.000
|
$523.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
10.000
|
$250.000
|
$204.000
|
$235.000
|
$264.000
|
$400.000
|
$335.000
|
$264.000
|
|
PREFAB PAV MRK TY C (W) (RR XING)
|
EA
|
2.000
|
$600.000
|
$430.000
|
$500.000
|
$556.000
|
$600.000
|
$820.000
|
$556.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
276.000
|
$3.500
|
$3.050
|
$3.500
|
$3.260
|
$4.000
|
$3.150
|
$3.300
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
638.000
|
$3.000
|
$3.050
|
$3.500
|
$3.260
|
$7.000
|
$3.150
|
$3.300
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
4.000
|
$3.500
|
$3.050
|
$3.500
|
$3.270
|
$10.000
|
$3.800
|
$3.300
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
4,180.000
|
$0.500
|
$0.360
|
$0.400
|
$0.380
|
$0.800
|
$0.350
|
$0.400
|
|
|
ELIM EXT PAV MRK & MRKS (12")
|
LF
|
78.000
|
$1.500
|
$2.040
|
$2.350
|
$2.180
|
$2.250
|
$1.250
|
$2.200
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
2.000
|
$75.000
|
$51.000
|
$58.000
|
$55.000
|
$100.000
|
$32.000
|
$55.000
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
2.000
|
$80.000
|
$61.000
|
$70.000
|
$66.000
|
$100.000
|
$37.000
|
$66.000
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
27,230.000
|
$0.050
|
$0.010
|
$0.010
|
$0.010
|
$0.050
|
$0.010
|
$0.020
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
4,765.000
|
$0.150
|
$0.020
|
$0.020
|
$0.020
|
$0.100
|
$0.030
|
$0.020
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
192.000
|
$0.500
|
$0.030
|
$0.040
|
$0.030
|
$0.200
|
$0.060
|
$0.030
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
166.000
|
$1.000
|
$0.100
|
$0.100
|
$0.110
|
$0.200
|
$0.150
|
$0.110
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
14.000
|
$15.000
|
$20.400
|
$23.000
|
$22.000
|
$30.000
|
$1.250
|
$22.000
|
|
|
PAV SURF PREP FOR MRK (DBL ARROW)
|
EA
|
2.000
|
$10.000
|
$20.400
|
$23.000
|
$22.000
|
$30.000
|
$2.500
|
$22.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
10.000
|
$20.000
|
$25.500
|
$30.000
|
$27.000
|
$35.000
|
$5.050
|
$28.000
|
|
|
PAV SURF PREP FOR MRK (RR XING)
|
EA
|
2.000
|
$30.000
|
$25.500
|
$30.000
|
$28.000
|
$30.000
|
$7.500
|
$28.000
|
|
|
INSTALL HWY TRF SIG (SYSTEM)
|
EA
|
1.000
|
$25,000.000
|
$66,000.000
|
$31,425.000
|
$34,800.000
|
$75,700.000
|
$49,000.000
|
$72,347.000
|
|
|
TEMP TRAF SIGNALS
|
EA
|
1.000
|
$28,000.000
|
$91,000.000
|
$51,340.000
|
$81,595.000
|
$104,246.000
|
$65,000.000
|
$99,713.000
|
|
|
VEH SIG SEC (12")LED(GRN)
|
EA
|
8.000
|
$230.000
|
$380.000
|
$210.000
|
$217.000
|
$431.000
|
$270.000
|
$413.000
|
|
|
VEH SIG SEC (12")LED(GRN ARW)
|
EA
|
5.000
|
$230.000
|
$380.000
|
$210.000
|
$217.000
|
$431.000
|
$270.000
|
$413.000
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
8.000
|
$230.000
|
$380.000
|
$210.000
|
$217.000
|
$431.000
|
$270.000
|
$413.000
|
|
|
VEH SIG SEC (12")LED(YEL ARW)
|
EA
|
6.000
|
$230.000
|
$380.000
|
$210.000
|
$217.000
|
$431.000
|
$270.000
|
$413.000
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
8.000
|
$230.000
|
$380.000
|
$210.000
|
$223.000
|
$431.000
|
$270.000
|
$413.000
|
|
|
VEH SIG SEC (12")LED(RED ARW)
|
EA
|
4.000
|
$230.000
|
$380.000
|
$210.000
|
$223.000
|
$431.000
|
$270.000
|
$413.000
|
|
|
BACK PLATE (12")(3 SEC)
|
EA
|
8.000
|
$80.000
|
$151.000
|
$90.000
|
$108.000
|
$172.000
|
$175.000
|
$165.000
|
|
|
BACK PLATE (12")(4 SEC)
|
EA
|
3.000
|
$90.000
|
$204.000
|
$103.000
|
$119.000
|
$230.000
|
$190.000
|
$220.000
|
|
|
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
|
LF
|
1,960.000
|
$3.000
|
$3.000
|
$2.600
|
$2.000
|
$3.430
|
$2.700
|
$3.300
|
|
|
INS TRF SIG PL AM (S)1 ARM(24')
|
EA
|
1.000
|
$5,000.000
|
$9,800.000
|
$5,760.000
|
$6,400.000
|
$11,253.000
|
$6,015.000
|
$10,764.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(44')
|
EA
|
3.000
|
$7,500.000
|
$12,000.000
|
$7,830.000
|
$9,250.000
|
$13,593.000
|
$9,300.000
|
$13,000.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$7,500.000
|
$13,500.000
|
$1,315.000
|
$22,000.000
|
$10,000.000
|
$14,800.000
|
$14,000.000
|
|
|
VIVDS PROCESSOR SYSTEM
|
EA
|
1.000
|
$8,000.000
|
$7,300.000
|
$3,800.000
|
$7,000.000
|
$8,400.000
|
$6,400.000
|
$8,000.000
|
|
|
VIVDS CAMERA ASSEMBLY
|
EA
|
4.000
|
$1,500.000
|
$1,780.000
|
$2,190.000
|
$2,700.000
|
$2,020.000
|
$1,450.000
|
$925.000
|
|
|
VIVDS SET-UP SYSTEM
|
EA
|
1.000
|
$1,000.000
|
$2,040.000
|
$650.000
|
$490.000
|
$2,300.000
|
$1,900.000
|
$2,200.000
|
|
|
VIVDS CENTRAL CONTROL
|
EA
|
1.000
|
$5,000.000
|
$1,530.000
|
$2,150.000
|
$1,090.000
|
$2,000.000
|
$3,800.000
|
$1,650.000
|
|
|
VIVDS COMMUNICATION CABLE (COAXIAL)
|
LF
|
870.000
|
$2.000
|
$3.150
|
$2.500
|
$2.000
|
$3.600
|
$3.500
|
$3.400
|
|
|
VIVDS TEMPORARY
|
EA
|
1.000
|
$15,000.000
|
$23,800.000
|
$13,500.000
|
$30,000.000
|
$26,950.000
|
$18,000.000
|
$25,757.000
|
|
|
BBU SYSTEM (EXTERNAL BATT CABINET)
|
EA
|
1.000
|
$7,000.000
|
$7,800.000
|
$8,325.000
|
$7,900.000
|
$8,970.000
|
$11,400.000
|
$8,578.000
|
|
Totals: |
$3,319,927.750
|
$3,523,494.740
|
$3,737,333.780
|
$4,180,316.980
|
$4,343,691.650
|
$4,479,983.520
|
$4,698,435.170
|