Show Job Controls
Bid Cobra

JEFFERSON SH 124 (0368-04-033)

Items: 74

County: JEFFERSON
Length: N/A
Highway: SH 124
District: BEAUMONT
Control Number: 0368-04-033
DBE Goal: N/A
Project: BR 2021(375)
Guaranty: N/A
Time: 134 WORKING DAYS
Engineer's Estimate: $2,417,380.21
Date: 03/04/2021 (5 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (6)
E
Engineer's Estimate
$2,417,380.21
1
$2,659,519.15
Over/Under Est: 10.02% $242,138.94
Over/Under Est: 10.49% $253,554.74
Amt Left: 0.43% $11,415.80
$2,861,291.18
Over/Under Est: 18.36% $443,910.97
Amt Left: 7.59% $201,772.03
Delta: -7.13% -$190,356.23
Over/Under Est: 25.14% $607,662.51
Amt Left: 13.74% $365,523.57
Delta: -5.72% -$163,751.54
Over/Under Est: 33.52% $810,378.99
Amt Left: 21.37% $568,240.05
Delta: -6.70% -$202,716.48
Over/Under Est: 54.57% $1,319,159.62
Amt Left: 40.5% $1,077,020.68
Delta: -15.76% -$508,780.63

Bid Items & Bid Tabulations

74 Total 0 of 74
JEFFERSON  |  SH 124  |  BEAUMONT  |  0368-04-033  |  03/04/2021  |  $2,417,380.21  |  BR 2021(375)  |  BRIDGE REPL  |  134 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TREVWAY, INC.
TEXAS MATERIALS GROUP, INC.
ISI CONTRACTING, INC.
RAGLE CONSTRUCTION, INC.
STATELINE CONSTRUCTION, LLC
HARPER BROTHERS CONSTRUCTION LLC
REMOVING CONC (PAV)
CY 265.000 $15.000 $22.000 $59.000 $2.500 $35.000 $22.000 $22.500
REMOVING CONC (RIPRAP)
SY 100.000 $5.000 $29.740 $41.000 $1,550.000 $8.000 $22.000 $10.000
REMOVING STAB BASE AND ASPH PAV(4"-16")
SY 1,680.000 $12.000 $7.000 $6.000 $7.500 $5.000 $12.000 $8.000
EXCAVATION (ROADWAY)
CY 154.000 $12.000 $47.460 $25.000 $18.000 $85.000 $25.000 $40.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 410.000 $16.000 $19.060 $40.000 $56.000 $12.000 $25.000 $20.000
BROADCAST SEED (TEMP) (WARM)
SY 1,112.000 $0.240 $1.260 $0.710 $0.170 $1.430 $1.000 $1.120
BROADCAST SEED (TEMP) (COOL)
SY 1,112.000 $0.240 $1.260 $0.710 $0.110 $1.430 $1.000 $1.120
CELL FBR MLCH SEED(PERM)(URBAN)(CLAY)
SY 2,224.000 $0.370 $2.000 $0.710 $0.330 $1.570 $2.650 $2.010
VEGETATIVE WATERING
MG 18.700 $15.000 $100.000 $70.000 $13.000 $20.000 $25.000 $40.000
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
CY 235.000 $36.000 $91.000 $81.000 $90.000 $95.000 $87.000 $125.000
CEM TRT(PLNT MX) (CL L)(TYA)(GR1-2)(6")
SY 1,408.000 $8.000 $16.000 $19.000 $16.000 $20.000 $46.000 $20.000
PRIME COAT (AE-P)
GAL 259.000 $10.000 $63.160 $6.250 $5.550 $10.000 $18.000 $5.000
D-GR HMA(SQ) TY-D PG64-22
TON 77.400 $125.000 $430.000 $150.000 $125.000 $200.000 $295.000 $200.000
TACK COAT
GAL 84.000 $5.000 $8.720 $8.000 $6.000 $10.000 $12.000 $5.000
CONC PVMT (CONT REINF - CRCP) (9")
SY 1,289.000 $36.000 $83.890 $68.000 $79.000 $65.000 $97.000 $95.000
CEM STABIL BKFL
CY 343.000 $85.000 $70.000 $50.000 $44.000 $65.000 $365.000 $135.000
FLOWABLE BACKFILL
CY 20.000 $150.000 $100.000 $175.000 $3,000.000 $150.000 $365.000 $375.000
DRILL SHAFT (48 IN)
LF 1,600.000 $425.000 $607.000 $459.000 $445.000 $480.000 $515.000 $725.000
CL C CONC (ABUT)
CY 117.200 $1,400.000 $400.000 $1,055.000 $630.000 $600.000 $1,225.000 $1,200.000
CL C CONC (BENT)
CY 96.200 $1,600.000 $600.000 $1,219.000 $620.000 $775.000 $1,465.000 $1,200.000
REINF CONC SLAB
SF 12,258.000 $20.000 $20.000 $25.000 $17.000 $17.400 $18.950 $27.500
APPROACH SLAB
CY 140.000 $350.000 $350.000 $425.000 $586.000 $495.000 $660.000 $550.000
PRESTR CONC GIRDER (TX28)
LF 1,911.000 $155.000 $144.000 $133.000 $148.000 $130.000 $210.000 $225.000
RIPRAP (CONC)(CL B)(5 IN)
CY 20.000 $370.000 $568.000 $861.000 $3,000.000 $465.000 $600.000 $600.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 351.000 $140.000 $143.000 $178.000 $200.000 $125.000 $167.000 $55.000
RIPRAP (MOW STRIP)(4 IN)
CY 12.000 $438.000 $300.000 $616.000 $720.000 $480.000 $525.000 $650.000
STR STEEL (MISC NON - BRIDGE)
LB 250.000 $75.000 $31.960 $29.000 $18.000 $16.500 $35.000 $20.000
RAIL (TY T223)
LF 500.000 $140.000 $71.000 $125.000 $88.000 $85.000 $135.000 $150.000
RAIL (TY PR11)
LF 262.400 $90.000 $154.000 $110.000 $73.000 $70.000 $165.000 $155.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 121.000 $110.000 $66.000 $151.000 $100.000 $115.000 $105.000 $165.000
RC PIPE (CL III)(24 IN)
LF 40.000 $77.000 $107.000 $107.000 $110.000 $100.000 $85.000 $145.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 2.000 $1,200.000 $2,847.000 $3,500.000 $1,300.000 $1,650.000 $1,600.000 $1,725.000
REMOV STR (SET)
EA 2.000 $350.000 $390.000 $300.000 $980.000 $450.000 $500.000 $500.000
REMOV STR (PIPE)
LF 40.000 $14.000 $63.000 $30.000 $30.000 $13.000 $10.000 $35.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 1.000 $70,000.000 $100,000.000 $120,000.000 $200,000.000 $744,000.000 $245,000.000 $365,000.000
MOBILIZATION
LS 1.000 $220,000.000 $250,000.000 $266,400.000 $280,000.000 $300,000.000 $300,000.000 $190,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 9.000 $4,000.000 $800.000 $2,000.000 $10,000.000 $2,500.000 $2,600.000 $15,000.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 75.000 $32.000 $18.000 $190.000 $22.000 $83.760 $45.000 $66.750
CONSTRUCTION EXITS (REMOVE)
SY 75.000 $10.000 $10.000 $98.000 $7.000 $14.980 $12.000 $11.940
TEMP SEDMT CONT FENCE (INSTALL)
LF 306.000 $2.750 $3.000 $3.100 $10.000 $4.920 $3.000 $3.920
TEMP SEDMT CONT FENCE (REMOVE)
LF 306.000 $1.000 $1.000 $1.260 $1.000 $1.310 $1.000 $1.040
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 91.000 $7.750 $11.000 $5.100 $5.000 $4.590 $9.000 $3.660
BIODEG EROSN CONT LOGS (REMOVE)
LF 91.000 $2.000 $1.000 $1.020 $1.000 $1.310 $4.000 $1.040
DRIVEWAYS (ACP)
SY 343.000 $35.000 $35.000 $49.000 $65.000 $25.000 $65.000 $138.970
CONC SIDEWALKS (4")
SY 249.000 $100.000 $60.000 $47.000 $52.000 $50.000 $18.000 $113.810
MTL W-BEAM GD FEN (STEEL POST)
LF 150.000 $27.000 $20.000 $32.500 $50.000 $30.000 $26.000 $30.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 2.000 $1,750.000 $2,072.000 $1,800.000 $1,800.000 $2,000.000 $1,600.000 $2,000.000
REMOVE METAL BEAM GUARD FENCE
LF 150.000 $3.000 $8.000 $2.550 $1.250 $5.000 $2.000 $20.000
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $2,750.000 $2,971.000 $2,450.000 $2,300.000 $2,800.000 $2,600.000 $2,800.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $410.000 $195.000 $252.000 $214.000 $250.000 $300.000 $250.000
CRASH CUSH ATTEN (INSTL)(R)(N)(TL3)
EA 2.000 $15,000.000 $28,000.000 $23,900.000 $24,000.000 $14,651.070 $10,875.000 $27,900.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 1.000 $305.000 $300.000 $280.500 $445.000 $170.000 $600.000 $700.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 6.000 $22.000 $5.000 $15.250 $27.000 $13.000 $45.000 $28.000
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 10.000 $65.000 $22.000 $54.500 $70.000 $29.000 $45.000 $65.000
REFL PAV MRK TY I (W)8"(DOT)(090MIL)
LF 119.000 $1.600 $2.530 $2.120 $2.100 $1.850 $2.000 $1.850
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 202.000 $1.000 $2.530 $2.030 $2.100 $1.500 $2.000 $1.500
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
LF 26.000 $6.000 $11.370 $12.500 $9.500 $5.500 $6.000 $5.500
PAVEMENT SEALER 4"
LF 2,605.000 $0.200 $1.010 $0.260 $0.850 $0.150 $1.000 $0.150
PAVEMENT SEALER 8"
LF 321.000 $0.500 $1.010 $0.510 $0.850 $0.300 $2.000 $0.300
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 1,243.000 $0.450 $1.890 $1.020 $1.600 $0.450 $2.000 $0.450
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 1,362.000 $0.250 $1.890 $1.020 $1.600 $0.450 $2.000 $0.450
PREFAB PAV MRK TY B (W)(ARROW)
EA 2.000 $500.000 $600.000 $628.000 $505.000 $220.000 $150.000 $220.000
PREFAB PAV MRK TY B (W)(WORD)
EA 2.000 $480.000 $631.000 $798.000 $530.000 $300.000 $150.000 $300.000
REFL PAV MRKR TY I-C
EA 10.000 $4.000 $5.050 $4.050 $4.250 $3.500 $10.000 $3.500
REFL PAV MRKR TY II-A-A
EA 38.000 $3.150 $5.050 $4.050 $4.250 $3.500 $10.000 $3.500
ELIM EXT PAV MRK & MRKS (4")
LF 369.000 $0.300 $1.260 $1.010 $1.100 $0.400 $1.000 $0.400
ELIM EXT PAV MRK & MRKS (8")
LF 104.000 $0.600 $2.150 $2.010 $1.800 $0.800 $2.000 $0.800
ELIM EXT PAV MRK & MRKS (24")
LF 26.000 $3.000 $2.530 $6.050 $2.100 $1.500 $3.000 $1.500
ELIM EXT PAV MRK & MRKS (ARROW)
EA 1.000 $44.000 $94.740 $45.500 $80.000 $50.000 $50.000 $50.000
PAV SURF PREP FOR MRK (4")
LF 2,605.000 $0.050 $0.510 $0.020 $0.500 $0.050 $1.000 $0.050
PAV SURF PREP FOR MRK (8")
LF 321.000 $0.120 $0.870 $0.060 $0.750 $0.100 $1.000 $0.100
PORTABLE CHANGEABLE MESSAGE SIGN
EA 5.000 $9,000.000 $16,000.000 $11,980.000 $13,000.000 $7,500.000 $15,000.000 $20,000.000
TMA (STATIONARY)
DAY 135.000 $175.000 $100.000 $350.000 $200.000 $200.000 $165.000 $250.000
TMA (MOBILE OPERATION)
DAY 10.000 $150.000 $300.000 $51.000 $480.000 $100.000 $400.000 $450.000
Totals: $2,417,380.210 $2,659,519.150 $2,670,934.950 $2,861,291.180 $3,025,042.720 $3,227,759.200 $3,736,539.830