JEFFERSON US 69 (0200-16-020)

Items: 268

County: JEFFERSON
Length: N/A
Highway: US 69
District: BEAUMONT
Control Number: 0200-16-020
DBE Goal: N/A
Project: F 2022(013)
Guaranty: N/A
Time: 695 WORKING DAYS
Engineer's Estimate: $66,513,432.45
Date: 09/02/2021 (4 years ago)
Contract Number: N/A
Type: HIGHWAY IMPROVEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (5)
E
Engineer's Estimate
$66,513,432.45
Over/Under Est: 5.27% $3,507,886.08
Over/Under Est: 16.31% $10,849,410.48
Amt Left: 10.48% $7,341,524.40
$77,665,665.00
Over/Under Est: 16.77% $11,152,232.55
Amt Left: 10.92% $7,644,346.47
Delta: -0.39% -$302,822.07
Over/Under Est: 20.62% $13,713,258.22
Amt Left: 14.57% $10,205,372.14
Delta: -3.30% -$2,561,025.67
$83,384,490.09
Over/Under Est: 25.36% $16,871,057.64
Amt Left: 19.08% $13,363,171.56
Delta: -3.94% -$3,157,799.42
Subcontractor Percentage Amount
TRAFFIC SYSTEMS CONSTRUCTION, INC. 1.83% $1,492,963.47
AMERICAN REMEDIATION OPTIONS, INC. 1.52% $1,240,057.09
TRP CONSTRUCTION GROUP, LLC 0.58% $473,179.68
BORTUNCO 0.58% $473,179.68
BARRICADES UNLIMITED 0.56% $456,863.14
BATTERSON, LLP 0.33% $269,222.92
SK CONCRETE SERVICES LLC 0.32% $261,064.65
SWEEPING CORPORATION OF AMERICA, LLC 0.17% $138,690.60
BUYERS BARRICADES HOUSTON, LLC 0.16% $130,532.32
HIGHWAY PAVEMENT SPECIALTIES, INC. 0.16% $130,532.32
TEXAS MAINTENANCE AND CONSTRUCTION LLC 0.15% $122,374.05
RAY'S THREADING AND FAB SHOP 0.15% $122,374.05
SCOTT DERR PAINTING CO, LLC 0.04% $32,633.08
STRUCTURAL INTEGRITY GROUP LLC 0.02% $16,316.54
LONG LEGACY ENTERPRISES, LLC 0.02% $16,316.54
Total: 6.59% $5,376,300.13

Bid Items & Bid Tabulations

268 Total 0 of 268
JEFFERSON  |  US 69  |  BEAUMONT  |  0200-16-020  |  09/02/2021  |  $66,513,432.45  |  F 2022(013)  |  HWY IMPRV  |  695 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
WILLIAMS BROTHERS CONSTRUCTION CO., INC.
GRANITE CONSTRUCTION COMPANY
WEBBER, LLC
JOHNSON BROS. CORPORATION, A SOUTHLAND COMPANY
COPASA INC
PREPARING ROW
STA 255.000 $2,000.000 $27,500.000 $10,000.000 $27,750.000 $22,000.000 $1,900.000
REMOVING CONC (PAV)
SY 7,064.000 $12.000 $12.000 $9.570 $12.000 $20.000 $5.790
REMOVING CONC (RIPRAP)
SY 516.000 $10.000 $11.000 $14.600 $30.000 $24.000 $29.740
REMOVING CONC (RIPRAP)
CY 7.680 $105.000 $250.000 $210.970 $90.000 $500.000 $87.000
REMOVING CONC (MEDIANS)
SY 120.000 $12.000 $25.000 $14.500 $10.000 $22.000 $9.910
REMOVING CONC (CURB)
LF 675.000 $8.000 $10.000 $1.700 $8.000 $15.000 $7.180
REMOVING CONC (CTB)
LF 11,175.000 $8.000 $12.000 $12.450 $30.000 $11.000 $40.000
REMOVE CONC (RAIL)
LF 192.000 $13.000 $15.000 $17.680 $20.000 $15.000 $18.320
REMOVING CONCRETE(MOW STRIP)
LF 9,867.000 $6.000 $5.000 $1.850 $8.000 $12.000 $17.000
REMOVING STAB BASE & ASPH PAV(12"-27")
SY 25,761.000 $13.000 $15.000 $2.360 $8.500 $7.000 $8.230
OBLITERATING ABANDONED ROAD
SY 40,343.000 $5.500 $2.500 $1.700 $3.500 $10.000 $5.000
EXCAVATION (ROADWAY)
CY 90,729.000 $8.000 $15.000 $7.890 $9.000 $17.000 $9.000
EXCAVATION (CHANNEL)
CY 115,612.000 $8.000 $1.000 $4.530 $10.000 $17.000 $9.360
EMBANKMENT (FINAL) (DENS CONT) (TY C1)
CY 64,218.000 $15.000 $30.000 $25.000 $6.000 $10.000 $17.320
EMBANKMENT (FINAL) (DENS CONT) (TY C2)
CY 58,105.000 $15.000 $20.000 $25.000 $18.000 $15.000 $17.320
EMBANKMENT (FINAL)(DENS CONT)(TY C3)
CY 1,774.000 $10.000 $20.000 $2.900 $15.000 $30.000 $17.320
BLADING
HR 255.000 $145.000 $100.000 $117.840 $130.000 $150.000 $128.570
FURNISHING AND PLACING TOPSOIL (4")
SY 53,901.000 $1.250 $1.000 $1.410 $2.000 $4.000 $1.500
BLOCK SODDING
SY 1,000.000 $6.000 $5.000 $4.000 $7.000 $6.000 $7.050
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
AC 11.140 $1,400.000 $1,695.000 $1,450.000 $2,000.000 $1,600.000 $2,823.240
CELL FBR MLCH SEED(TEMP)(WARM)
AC 5.570 $1,400.000 $1,595.000 $1,450.000 $2,000.000 $1,400.000 $2,640.500
CELL FBR MLCH SEED(TEMP)(COOL)
AC 5.570 $1,400.000 $1,595.000 $1,450.000 $2,000.000 $1,400.000 $2,677.170
VEGETATIVE WATERING
MG 1,359.000 $15.000 $18.000 $23.930 $12.000 $10.000 $38.450
SOIL RETENTION BLANKETS (CL 1) (TY B)
SY 1,000.000 $2.000 $2.000 $2.290 $3.000 $2.300 $3.250
PROOF ROLLING
HR 254.000 $100.000 $100.000 $89.360 $215.000 $75.000 $60.000
FL BS (CMP IN PLC)(TYA GR1-2) (6")
SY 21,447.000 $20.000 $9.000 $12.230 $25.000 $20.000 $15.160
FL BS (CMP IN PLACE)(TY A GR 1-2)(10")
SY 4,782.000 $20.000 $15.000 $18.440 $20.000 $35.000 $24.370
LIME TRT (EXST MATL) (12")
SY 84,431.000 $2.500 $4.000 $3.820 $6.500 $5.000 $3.290
LIME (HYD, COM, OR QK(SLURRY))
TON 4,964.000 $180.000 $200.000 $199.600 $220.000 $175.000 $178.220
LIME TRT (EXST MATL)(8")
SY 47,531.000 $3.000 $4.000 $3.250 $5.000 $6.000 $3.260
CM TRT(PT MX)(CL L)(TYD)(GR1-2)(FN POS)
CY 17,012.000 $55.000 $70.000 $96.450 $50.000 $75.000 $109.050
PRIME COAT (AE-P)
GAL 24,992.000 $5.000 $3.250 $4.450 $4.000 $5.000 $4.000
D-GR HMA(SQ) TY-D PG64-22
TON 5,614.000 $153.000 $101.000 $102.250 $92.000 $95.000 $92.000
TACK COAT
GAL 6,124.000 $3.000 $3.250 $3.330 $3.000 $4.000 $3.000
PLANE ASPH CONC PAV (2")
SY 90,757.000 $1.650 $2.680 $1.370 $2.500 $2.000 $2.020
FABRIC
SY 1.000 $40.000 $450.000 $663.610 $250.000 $3.000 $1,000.000
PAV JT UNDERSEAL (24")
LF 139.000 $15.000 $84.000 $30.100 $50.000 $5.000 $12.410
CONC PVMT (CONT REINF - CRCP) (9")
SY 3,279.000 $45.000 $40.000 $60.000 $40.000 $55.000 $75.400
CONC PVMT (CONT REINF - CRCP) (11")
SY 30,725.000 $54.000 $55.000 $80.000 $55.000 $60.000 $80.050
CONC PVMT (CONT REINF - CRCP) (9.5")
SY 3,014.000 $58.000 $60.000 $63.000 $43.000 $55.000 $77.550
CONC PVMT (CONT REINF - CRCP) (10.5")
SY 37,902.000 $63.000 $40.000 $65.000 $50.000 $60.000 $77.160
CONC PVMT (CONT REINF - CRCP) (12.5")
SY 13,645.000 $66.000 $45.000 $87.000 $60.000 $60.000 $86.080
CONC PVMT (JOINTED - CPCD) (13")
SY 3,087.000 $72.000 $60.000 $76.380 $70.000 $60.000 $93.740
CONC PVMT(CRCP)(TRANSITION SLAB)
SY 288.000 $75.000 $200.000 $107.410 $170.000 $80.000 $92.490
CONC PVMT (JC) (TRANSITION SLAB)
SY 209.000 $75.000 $200.000 $104.030 $170.000 $65.000 $171.710
CEM STABIL BKFL
CY 345.000 $150.000 $50.000 $72.370 $80.000 $100.000 $75.560
CUT & RESTORE CONC PAVING
SY 218.000 $186.000 $251.000 $159.840 $250.000 $115.000 $200.000
TRENCH EXCAVATION PROTECTION
LF 164.000 $25.000 $4.400 $96.770 $5.000 $1,000.000 $3.720
TEMPORARY SPL SHORING
SF 4,311.000 $25.000 $1.000 $77.660 $30.000 $45.000 $50.000
FOUNDATION LOAD TEST (D4945) (PILE)
EA 7.000 $12,000.000 $10,000.000 $4,925.010 $15,000.000 $5,000.000 $5,000.000
FOUNDATON LOADTEST(D4945)(DRILLD SHAFT)
EA 7.000 $25,000.000 $7,500.000 $26,635.060 $25,000.000 $12,000.000 $25,000.000
PRESTR CONC PIL (16 IN SQ)
LF 3,584.000 $150.000 $65.000 $113.460 $95.000 $150.000 $110.000
PRESTR CONC PIL (20 IN SQ)
LF 360.000 $200.000 $90.000 $161.290 $105.000 $265.000 $200.000
PRESTR CONC PIL (24 IN SQ)
LF 2,784.000 $250.000 $100.000 $99.590 $130.000 $235.000 $280.000
DRILL SHAFT (18 IN)
LF 1,578.000 $105.000 $100.000 $180.000 $90.000 $75.000 $250.000
DRILL SHAFT (36 IN)
LF 4,686.000 $180.000 $150.000 $300.000 $140.000 $250.000 $300.000
DRILL SHAFT (42 IN)
LF 24,072.000 $230.000 $215.000 $375.000 $200.000 $345.000 $375.000
DRILL SHAFT (SIGN MTS) (24 IN)
LF 333.000 $150.000 $115.000 $129.520 $187.000 $400.000 $167.000
DRILL SHAFT (SIGN MTS) (36 IN)
LF 844.000 $250.000 $300.000 $307.690 $529.000 $400.000 $300.000
DRILL SHAFT (SIGN MTS) (54 IN)
LF 79.000 $450.000 $500.000 $512.820 $633.000 $505.000 $500.000
DRILL SHAFT (HIGH MAST POLE) (60 IN)
LF 135.000 $615.000 $605.000 $626.080 $743.000 $650.000 $605.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 70.000 $151.000 $205.000 $212.140 $241.000 $210.000 $205.000
DRILL SHAFT (SPECIAL)
LF 42,930.000 $50.000 $30.000 $35.000 $75.000 $50.000 $75.000
CL C CONC (ABUT)
CY 363.500 $1,000.000 $1,000.000 $847.210 $915.000 $800.000 $900.000
CL C CONC (ABUT)(EXTEND)
CY 26.200 $1,750.000 $2,000.000 $1,500.000 $1,850.000 $1,250.000 $1,049.530
CL C CONC (CAP)
CY 1,549.600 $950.000 $1,000.000 $1,500.000 $1,030.000 $1,200.000 $1,300.000
CL C CONC (CAP)(EXTEND)
CY 16.800 $2,500.000 $2,000.000 $1,500.000 $1,250.000 $1,500.000 $3,000.000
CL C CONC (COLUMN)
CY 1,568.300 $930.000 $800.000 $1,500.000 $950.000 $1,000.000 $1,000.000
CL C CONC (RAIL FOUNDATION)
CY 25.000 $452.000 $500.000 $1,000.000 $500.000 $400.000 $500.000
REINF CONC SLAB
SF 284,816.000 $18.000 $20.000 $18.000 $18.500 $14.000 $19.000
REINF CONC SLAB (EXTEND SLAB)
SF 4,060.000 $30.000 $30.000 $23.770 $20.000 $32.000 $25.000
APPROACH SLAB
CY 562.000 $500.000 $400.000 $750.000 $450.000 $450.000 $350.000
APPROACH SLAB (EXTEND)
CY 38.000 $700.000 $550.000 $528.670 $525.000 $520.000 $500.000
RETAINING WALL (MSE) (ASHLAR STONE FIN)
SF 654.600 $425.000 $80.000 $150.000 $60.000 $90.000 $100.000
RETAINING WALL (TEMP WALL)
SF 1,051.000 $25.000 $25.000 $30.000 $95.000 $20.000 $19.000
PRESTR CONC GIRDER (TX28)
LF 3,452.840 $150.000 $85.000 $168.870 $200.000 $140.000 $140.530
PRESTR CONC GIRDER (TX34)
LF 487.500 $160.000 $90.000 $177.590 $225.000 $155.000 $156.860
PRESTR CONC GIRDER (TX40)
LF 31,741.100 $120.000 $95.000 $155.010 $250.000 $155.000 $160.620
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 4.000 $270.000 $1,000.000 $706.070 $2,500.000 $1,000.000 $168.430
RIPRAP (STONE COMMON)(DRY)(18 IN)
CY 45.000 $140.000 $275.000 $300.000 $150.000 $175.000 $180.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 1,890.000 $130.000 $190.000 $250.000 $140.000 $175.000 $173.000
RIPRAP (STONE PROTECTION)(15 IN)
CY 60.000 $120.000 $250.000 $275.000 $135.000 $175.000 $194.000
RIPRAP (CONC)(FLUME)
CY 6.000 $520.000 $1,000.000 $399.240 $1,000.000 $350.000 $554.060
RIPRAP (MOW STRIP)(4 IN)
CY 651.800 $450.000 $550.000 $436.930 $500.000 $620.000 $533.610
CLEANING AND SEALING EXIST JOINTS(CL3)
LF 139.000 $10.000 $35.000 $89.110 $15.000 $18.000 $50.000
RAIL (TY T551)
LF 283.000 $42.000 $30.000 $119.630 $45.000 $52.000 $45.960
RAIL (TY T552)
LF 215.000 $100.000 $30.000 $101.820 $35.000 $52.000 $35.000
RAIL (TY SSTR)
LF 15,881.300 $45.000 $30.000 $58.400 $42.000 $48.000 $45.900
ARMOR JOINT (SEALED)
LF 50.000 $110.000 $100.000 $118.590 $110.000 $140.000 $102.950
HEADER TYPE EXPANSION JOINT
CF 104.000 $390.000 $280.000 $321.070 $400.000 $280.000 $384.380
JOINT SEALANT
LF 1,250.000 $15.000 $16.000 $9.980 $18.000 $10.000 $18.840
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 1,689.000 $110.000 $100.000 $152.850 $95.000 $145.000 $69.300
CONC BOX CULV (4 FT X 3 FT)
LF 184.000 $300.000 $308.250 $450.000 $260.000 $600.000 $268.820
CONC BOX CULV (6 FT X 4 FT)(EXTEND)
LF 15.000 $450.000 $1,185.700 $1,500.000 $800.000 $5,000.000 $755.450
CONC BOX CULV (6 FT X 2 FT)
LF 270.000 $500.000 $404.050 $400.000 $550.000 $700.000 $555.960
CONC BOX CULV (8 FT X 10 FT) (EXTEND)
LF 46.000 $750.000 $1,929.850 $2,500.000 $1,350.000 $3,000.000 $3,000.000
RC PIPE (CL III)(24 IN)
LF 466.000 $100.000 $156.300 $120.000 $105.000 $135.000 $107.470
RC PIPE (CL III)(36 IN)
LF 70.000 $150.000 $162.550 $160.000 $130.000 $300.000 $137.140
RC PIPE (CL IV)(24 IN)
LF 434.000 $200.000 $93.200 $170.000 $95.000 $130.000 $97.510
RC PIPE (CL IV)(30 IN)
LF 256.000 $200.000 $139.850 $200.000 $110.000 $175.000 $112.770
INLET (COMPL)(TY AAD)
EA 1.000 $7,500.000 $4,568.000 $7,500.000 $6,709.000 $5,000.000 $6,758.670
INLET (COMPL)(TY AD)
EA 1.000 $4,800.000 $2,847.000 $5,000.000 $3,810.000 $4,400.000 $3,907.060
INLET (COMPL)(CURB)(TY 2)(10')
EA 1.000 $7,500.000 $5,606.000 $9,000.000 $8,000.000 $5,000.000 $8,308.020
INLET (STG II)(CURB)(TY C1)
EA 1.000 $2,500.000 $1,933.000 $8,700.000 $2,200.000 $3,200.000 $2,195.820
WINGWALL (PW - 1) (HW=11 FT)
EA 2.000 $70,000.000 $66,676.000 $40,000.000 $55,000.000 $55,000.000 $53,102.610
WINGWALL (PW - 1) (HW=4 FT)
EA 2.000 $10,000.000 $13,216.000 $10,000.000 $11,000.000 $22,000.000 $11,056.400
WINGWALL (PW - 1) (HW=5 FT)
EA 1.000 $12,500.000 $14,931.000 $15,000.000 $15,000.000 $22,000.000 $15,653.520
WINGWALL (PW - 1) (HW=6 FT)
EA 2.000 $20,000.000 $18,365.000 $25,000.000 $19,500.000 $28,000.000 $20,412.210
SET (TY I)(S= 4 FT)(HW= 4 FT)(3:1) (C)
EA 1.000 $5,500.000 $14,026.000 $15,000.000 $6,800.000 $7,000.000 $7,099.490
SET (TY I)(S= 4 FT)(HW= 4 FT)(6:1) (C)
EA 1.000 $7,000.000 $19,045.000 $25,000.000 $6,300.000 $15,000.000 $6,510.000
SET (TY I)(S= 4 FT)(HW= 5 FT)(4:1) (C)
EA 1.000 $12,000.000 $23,050.000 $22,000.000 $11,500.000 $10,000.000 $11,933.410
SET (TY I)(S= 4 FT)(HW= 5 FT)(6:1) (C)
EA 1.000 $13,000.000 $23,050.000 $40,000.000 $13,000.000 $24,000.000 $12,983.410
SET (TY I)(S= 6 FT)(HW= 3 FT)(4:1) (C)
EA 2.000 $7,000.000 $13,385.000 $15,000.000 $6,500.000 $6,000.000 $6,632.470
SET (TY I)(S= 6 FT)(HW= 3 FT)(6:1) (C)
EA 2.000 $10,000.000 $13,385.000 $20,000.000 $7,200.000 $9,500.000 $6,346.300
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 2.000 $1,400.000 $1,527.000 $1,500.000 $1,300.000 $2,600.000 $997.500
SET (TY II) (24 IN) (RCP) (6: 1) (C)
EA 4.000 $1,800.000 $1,627.000 $1,800.000 $1,830.000 $3,300.000 $1,876.170
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 9.000 $1,500.000 $1,627.000 $1,800.000 $1,350.000 $3,300.000 $1,320.780
SET (TY II) (36 IN) (RCP) (6: 1) (P)
EA 2.000 $4,500.000 $4,153.000 $5,500.000 $5,900.000 $4,500.000 $6,205.500
JACK BOR TUN BOX CULV (4 FT X 3 FT)
LF 444.000 $1,850.000 $1,357.550 $2,500.000 $2,000.000 $1,450.000 $1,746.860
CLEAN EXIST CULVERTS
EA 7.000 $2,000.000 $22,098.000 $1,500.000 $2,000.000 $1,400.000 $1,120.000
REMOV STR (INLET)
EA 2.000 $1,000.000 $563.000 $1,000.000 $500.000 $1,500.000 $500.000
REMOV STR (HEADWALL)
EA 33.000 $1,300.000 $1,126.000 $2,000.000 $1,000.000 $1,700.000 $750.000
REMOV STR (PIPE)
LF 1,663.000 $15.000 $20.700 $25.000 $21.000 $45.000 $20.570
REMOV STR (BOX CULVERT)
LF 89.000 $50.000 $48.850 $750.000 $80.000 $400.000 $50.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 2.000 $25,000.000 $25,000.000 $100,000.000 $300,000.000 $400,000.000 $175,000.000
MOBILIZATION
LS 1.000 $5,900,000.000 $7,707,594.000 $7,000,000.000 $7,800,000.000 $7,900,000.000 $8,000,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 46.000 $9,000.000 $10,000.000 $9,000.000 $1,480.000 $12,000.000 $17,000.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 3,300.000 $35.000 $42.000 $38.910 $22.000 $25.000 $141.770
ROCK FILTER DAMS (REMOVE)
LF 3,300.000 $10.000 $9.000 $7.000 $8.000 $8.000 $33.580
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 3,120.000 $30.000 $29.000 $22.930 $20.000 $21.000 $43.430
CONSTRUCTION EXITS (REMOVE)
SY 3,120.000 $10.000 $9.000 $9.000 $9.000 $6.000 $7.800
TEMP SEDMT CONT FENCE (INSTALL)
LF 9,765.000 $2.000 $2.450 $1.520 $3.000 $2.500 $2.860
TEMP SEDMT CONT FENCE (REMOVE)
LF 9,765.000 $1.000 $1.000 $0.250 $1.000 $0.500 $0.460
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 220.000 $6.000 $5.500 $2.490 $5.000 $6.000 $7.100
BIODEG EROSN CONT LOGS (REMOVE)
LF 220.000 $2.000 $1.000 $0.520 $2.000 $1.000 $0.530
CONSTRUCTING DETOURS (TY 1)
SY 7,931.000 $75.000 $116.000 $125.000 $76.000 $125.000 $99.040
CONSTRUCTING DETOURS (TY 2)
SY 8,384.000 $60.000 $91.000 $125.000 $76.000 $100.000 $96.130
CONSTRUCTING DETOURS (TY 3)
SY 2,306.000 $30.000 $38.000 $125.000 $76.000 $30.000 $45.120
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 26,970.000 $25.000 $10.000 $33.000 $32.000 $50.000 $40.000
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 3,000.000 $29.000 $40.000 $41.000 $40.000 $70.000 $50.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 340.000 $33.000 $40.000 $40.000 $42.000 $65.000 $50.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 71,790.000 $6.500 $4.000 $2.290 $5.000 $14.000 $6.000
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 10,160.000 $5.000 $4.000 $3.080 $10.000 $14.000 $6.000
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 1,140.000 $8.250 $4.000 $4.350 $10.000 $14.000 $6.000
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 26,970.000 $8.500 $4.000 $3.620 $7.000 $12.000 $8.000
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 3,000.000 $6.750 $4.000 $3.230 $7.000 $12.000 $6.000
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 340.000 $10.000 $4.000 $8.070 $7.000 $12.000 $8.000
PERM CTB (SGL SLOPE) (TY 1) (42 )
LF 2,382.000 $60.000 $35.000 $79.520 $75.000 $57.000 $155.000
PERM CTB (SGL SLOPE) (TY 1) (54 )
LF 10,888.000 $120.000 $50.000 $90.000 $130.000 $72.000 $134.400
PERM CTB (SGL SLOPE) (TY 3) (54 )
LF 1,439.000 $150.000 $150.000 $239.170 $150.000 $270.000 $149.400
PERM CTB (SGL SLOPE)(TY 1)(TRANSITION)
LF 80.000 $225.000 $250.000 $204.630 $255.000 $170.000 $239.850
CONC CURB (RIBBON)
LF 250.000 $25.000 $20.000 $40.000 $40.000 $20.000 $36.090
DRIVEWAYS (CONC)
SY 1,481.000 $83.000 $70.000 $66.710 $85.000 $57.000 $81.490
DRIVEWAYS (ACP)
SY 809.000 $46.000 $50.000 $40.830 $45.000 $48.000 $38.980
MTL W-BEAM GD FEN (STEEL POST)
LF 9,750.000 $25.000 $31.000 $34.010 $32.500 $25.000 $33.070
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 26.000 $1,905.000 $2,200.000 $2,588.830 $2,200.000 $1,850.000 $2,635.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 31.000 $1,382.000 $1,300.000 $1,116.750 $1,200.000 $1,100.000 $1,670.000
MTL BM GD FEN TRANS (NON - SYM)
EA 22.000 $1,100.000 $850.000 $812.180 $750.000 $667.000 $976.000
REMOVE METAL BEAM GUARD FENCE
LF 8,850.000 $4.000 $5.000 $2.030 $0.850 $2.500 $2.370
REMOVE TERMINAL ANCHOR SECTION
EA 22.000 $245.000 $313.000 $152.280 $180.000 $175.000 $325.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 15.000 $187.000 $287.000 $152.280 $180.000 $230.000 $325.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 11.000 $265.000 $295.000 $152.280 $225.000 $225.000 $325.000
REMOVE CABLE BARRIER
LF 1,515.000 $3.000 $7.000 $3.000 $3.000 $5.000 $20.000
REMOVE CABLE BARRIER TERMINAL SECTION
EA 3.000 $400.000 $613.000 $400.000 $600.000 $650.000 $20.000
GUARDRAIL END TREATMENT (INSTALL)
EA 29.000 $2,700.000 $2,800.000 $2,842.640 $3,180.000 $2,650.000 $3,072.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 61.000 $1,675.000 $1,900.000 $2,510.380 $1,500.000 $1,200.000 $500.000
CRASH CUSH ATTEN (REMOVE)
EA 19.000 $847.000 $900.000 $1,501.470 $800.000 $650.000 $250.000
CRASH CUSH ATTEN (INSTL)(R)(N)(TL3)
EA 23.000 $19,250.000 $24,500.000 $20,181.280 $23,800.000 $26,000.000 $35,000.000
REMOVE RD IL ASM (TRANS-BASE)
EA 6.000 $3,000.000 $2,890.000 $403.590 $839.000 $850.000 $390.000
IN RD IL (TY SA) 50T-8 (400W EQ) LED
EA 7.000 $3,467.000 $4,690.000 $4,594.680 $4,770.000 $4,100.000 $4,440.000
CONDT (PVC) (SCH 40) (2")
LF 6,994.000 $8.000 $11.400 $11.800 $9.700 $11.000 $11.400
CONDT (PVC) (SCH 40) (2") (BORE)
LF 323.000 $15.000 $12.500 $12.940 $16.700 $22.000 $12.500
CONDT (PVC) (SCH 80) (2")
LF 1,695.000 $10.000 $12.800 $13.250 $11.600 $11.000 $12.800
CONDT (PVC) (SCH 80) (2") (BORE)
LF 480.000 $20.000 $14.250 $14.750 $18.700 $24.000 $14.250
ELEC CONDR (NO.8) BARE
LF 3,936.000 $1.000 $1.450 $1.500 $1.000 $2.500 $1.450
ELEC CONDR (NO.8) INSULATED
LF 7,872.000 $1.000 $1.800 $1.860 $1.250 $1.500 $1.800
ELEC CONDR (NO.6) BARE
LF 5,906.000 $2.000 $1.750 $1.810 $1.300 $1.500 $1.750
ELEC CONDR (NO.6) INSULATED
LF 11,812.000 $2.000 $2.050 $2.120 $1.500 $2.250 $2.050
GROUND BOX TY A (122311)W/APRON
EA 38.000 $835.000 $825.000 $853.740 $646.000 $1,000.000 $825.000
REMOVE GROUND BOX
EA 18.000 $250.000 $195.000 $201.790 $129.000 $200.000 $195.000
ELC SRV TY D 120/240 060(NS)SS(N)SP(O)
EA 5.000 $5,500.000 $5,320.000 $4,987.920 $4,630.000 $6,000.000 $4,820.000
ALUMINUM SIGNS (TY A)
SF 108.000 $23.000 $15.000 $27.520 $26.000 $31.000 $28.760
ALUMINUM SIGNS (TY G)
SF 2,605.000 $39.000 $25.000 $28.760 $25.000 $27.000 $27.830
ALUMINUM SIGNS (TY O)
SF 3,396.000 $25.000 $19.500 $20.000 $25.300 $25.000 $19.500
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 39.000 $524.000 $500.000 $548.220 $535.000 $600.000 $448.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 21.000 $610.000 $600.000 $690.360 $750.000 $700.000 $607.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 1.000 $1,070.000 $865.000 $781.730 $825.000 $900.000 $662.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 4.000 $615.000 $810.000 $852.790 $1,100.000 $600.000 $848.000
IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL)
EA 6.000 $1,614.000 $1,260.000 $1,299.490 $2,000.000 $1,750.000 $1,473.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 7.000 $2,515.000 $1,100.000 $1,462.760 $2,500.000 $2,000.000 $2,240.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
EA 1.000 $2,280.000 $1,200.000 $1,629.970 $2,500.000 $2,300.000 $2,240.000
REMOVE SM RD SN SUP&AM
EA 99.000 $94.000 $115.000 $20.300 $60.000 $90.000 $51.000
INSTALL LRSS (STRUCT STEEL)
LB 11,492.000 $7.000 $4.000 $5.200 $5.600 $4.500 $4.910
RELOCATE LRSA
EA 8.000 $3,000.000 $4,500.000 $2,141.260 $3,440.000 $3,500.000 $1,088.000
REMOVE LRSA
EA 14.000 $960.000 $2,800.000 $203.610 $674.000 $1,000.000 $1,800.000
INS OH SN SUP(30 FT CANT)
EA 1.000 $23,355.000 $30,600.000 $31,384.620 $32,820.000 $40,000.000 $30,600.000
INS OH SN SUP(40 FT CANT)
EA 1.000 $24,765.000 $38,990.000 $39,989.740 $45,330.000 $50,000.000 $38,990.000
INS OH SN SUP(65 FT BRDG)
EA 1.000 $34,000.000 $51,100.000 $52,410.260 $46,110.000 $70,000.000 $51,100.000
INS OH SN SUP(70 FT BRDG)
EA 1.000 $34,500.000 $51,200.000 $52,512.820 $46,060.000 $70,000.000 $51,200.000
INS OH SN SUP(75 FT BRDG)
EA 4.000 $34,630.000 $54,300.000 $55,692.310 $48,480.000 $75,000.000 $54,300.000
INS OH SN SUP(80 FT BRDG)
EA 1.000 $35,000.000 $63,400.000 $65,025.640 $53,000.000 $88,000.000 $63,400.000
REMOVE OVERHD SIGN SUP
EA 4.000 $6,250.000 $9,000.000 $4,102.570 $3,770.000 $6,000.000 $4,000.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 16.000 $21.000 $55.000 $12.180 $25.000 $40.000 $12.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 140.000 $21.000 $25.000 $12.240 $35.000 $35.000 $12.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 28.000 $23.000 $30.000 $7.650 $20.000 $25.000 $7.000
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
EA 14.000 $75.000 $75.000 $75.340 $65.000 $75.000 $100.000
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 2,940.000 $0.300 $0.300 $0.320 $0.400 $0.300 $0.350
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 15,006.000 $0.200 $0.300 $0.320 $0.300 $0.300 $0.300
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 12,749.000 $0.200 $0.300 $0.320 $0.300 $0.300 $0.300
WK ZN PAV MRK REMOV (REFL) TY II-A-A
LF 8.000 $1.000 $5.000 $5.320 $10.000 $5.000 $4.000
WK ZN PAV MRK REMOV (REFL) TY II-C-R
EA 20.000 $1.000 $5.000 $5.320 $10.000 $5.000 $4.000
WK ZN PAV MRK REMOV (W)4"(BRK)
LF 41,965.000 $1.000 $0.800 $0.850 $1.000 $0.800 $1.300
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 229,077.000 $0.850 $0.650 $0.690 $1.000 $0.700 $0.900
WK ZN PAV MRK REMOV (W)8"(DOT)
LF 1,455.000 $2.000 $1.500 $1.600 $4.000 $1.500 $2.250
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 127.000 $7.500 $10.000 $10.640 $8.000 $7.500 $10.000
WK ZN PAV MRK REMOV (W)(ARROW)
EA 13.000 $150.000 $375.000 $399.110 $200.000 $380.000 $165.000
WK ZN PAV MRK REMOV (W)(WORD)
EA 2.000 $180.000 $500.000 $532.160 $200.000 $505.000 $220.000
WK ZN PAV MRK REMOV (W)36"(YLD TRI)
EA 12.000 $10.000 $15.000 $15.970 $30.000 $15.000 $78.000
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 205,595.000 $1.000 $0.650 $0.690 $1.000 $0.650 $0.900
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 4,467.000 $1.000 $2.000 $1.360 $3.000 $0.800 $1.210
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 1,490.000 $2.000 $2.000 $1.370 $3.000 $0.500 $1.390
REFL PAV MRK TY I (W)8"(DOT)(090MIL)
LF 30.000 $1.000 $1.000 $1.060 $3.000 $1.000 $4.000
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 8,841.000 $1.000 $0.720 $0.770 $1.000 $0.750 $1.000
REFL PAV MRK TY I (W)12"(SLD)(090MIL)
LF 3,975.000 $3.750 $1.500 $1.600 $3.500 $1.500 $3.400
REF PAV MRK TY I(W)36"(YLD TRI)(090MIL)
EA 3.000 $47.000 $50.000 $53.220 $32.000 $50.000 $75.000
PAVEMENT SEALER 4"
LF 31,822.000 $0.500 $0.150 $0.160 $0.250 $0.150 $0.170
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
LF 9,428.000 $0.500 $0.360 $0.380 $0.500 $0.360 $0.470
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 51,323.000 $0.500 $0.360 $0.380 $0.500 $0.350 $0.420
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 48,729.000 $0.500 $0.360 $0.380 $0.500 $0.360 $0.420
REFL PAV MRK TY I (W)12"(DOT)(090MIL)
LF 1,647.000 $2.500 $1.500 $1.600 $4.000 $1.500 $3.150
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 266.000 $11.500 $13.000 $13.840 $13.000 $13.000 $14.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 27.000 $225.500 $225.000 $239.470 $250.000 $205.000 $245.000
PREFAB PAV MRK TY C (W) (DBL ARROW)
EA 5.000 $440.000 $400.000 $425.720 $400.000 $400.000 $389.000
PREFAB PAV MRK TY C (W) (WORD)
EA 15.000 $330.000 $300.000 $319.290 $300.000 $303.000 $300.000
REFL PAV MRKR TY II-A-A
EA 30.000 $4.000 $4.000 $4.260 $5.000 $4.000 $4.000
REFL PAV MRKR TY II-C-R
EA 1,274.000 $3.500 $3.000 $3.190 $5.000 $3.000 $4.000
ELIM EXT PAV MRK & MRKS (4")
LF 65,184.000 $0.500 $0.550 $0.590 $0.600 $0.500 $0.310
ELIM EXT PAV MRK & MRKS (ARROW)
EA 5.000 $48.000 $75.000 $79.820 $100.000 $70.000 $48.000
PAV SURF PREP FOR MRK (4")
LF 31,822.000 $0.500 $0.150 $0.160 $0.050 $0.150 $0.200
TEMP TRAF SIGNALS
EA 2.000 $48,000.000 $37,500.000 $38,806.460 $59,600.000 $40,000.000 $37,500.000
REMOVAL OF CONDUIT
LF 7,040.000 $2.000 $0.750 $0.780 $6.700 $1.000 $0.750
REMOVAL OF CABLES
LF 15,310.000 $1.000 $0.300 $0.310 $0.550 $0.300 $0.300
CNC CRACK REPAIR (DISCRETE)(SURF SEAL)
LF 97.000 $50.000 $50.000 $52.280 $1,000.000 $21.000 $501.250
TERMINAL ANCHOR JOINT CONT REINF
CY 186.500 $700.000 $1,156.000 $1,335.210 $500.000 $840.000 $200.000
D-GR HMA TY-B PG64-22
TON 16,142.000 $72.500 $80.000 $94.470 $100.000 $80.000 $85.000
TACK COAT
GAL 4,328.000 $3.000 $3.250 $2.780 $2.500 $4.000 $2.500
SP MIXES SP-D SAC-A PG76-22
TON 18,241.000 $108.000 $100.000 $111.140 $110.000 $100.000 $100.000
TACK COAT
GAL 9,543.000 $3.000 $3.250 $2.780 $2.500 $4.000 $2.500
UNDERSEAL COURSE
GAL 15,032.000 $3.000 $8.000 $8.340 $2.500 $4.000 $2.410
TIP TESTING(DRILL SHAFT)
EA 37.000 $5,500.000 $5,000.000 $5,421.760 $5,180.000 $5,000.000 $5,175.000
WICK DRAINS
LF 1,420,607.000 $4.000 $3.500 $1.870 $2.000 $2.000 $4.500
WELL POINTING
LF 11,800.000 $10.000 $0.100 $25.000 $10.000 $7.000 $50.000
GEOGRID BASE REINFORCEMENT (TY II)
SY 143,083.000 $1.350 $2.000 $1.040 $2.000 $3.000 $1.280
SETTLEMENT GAUGE
EA 8.000 $25,000.000 $15,000.000 $5,752.750 $5,000.000 $1,250.000 $40,220.370
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 77.000 $95.000 $10.000 $35.400 $50.000 $100.000 $34.740
PORTABLE CHANGEABLE MESSAGE SIGN
EA 12.000 $8,200.000 $100.000 $15,855.820 $15,600.000 $14,500.000 $15,428.570
CCTV FIELD EQUIPMENT (DIGITAL)
EA 5.000 $7,800.000 $3,630.000 $3,756.470 $3,400.000 $10,000.000 $3,630.000
CCTV MOUNT (POLE)
EA 5.000 $1,000.000 $465.000 $481.200 $579.000 $1,000.000 $465.000
GROUND BOX (PREPARE)
EA 6.000 $200.000 $390.000 $403.590 $193.000 $300.000 $390.000
ITS POLE (50 FT)(130 MPH)
EA 5.000 $14,000.000 $15,500.000 $16,040.000 $15,080.000 $15,000.000 $15,500.000
ITS POLE MNT CAB (TY 2)(CONF 1)
EA 5.000 $5,000.000 $4,560.000 $4,718.870 $4,410.000 $5,000.000 $4,560.000
REPLACE LED HIGH MAST ILLUM ASSEMBBLIES
EA 3.000 $7,000.000 $7,100.000 $7,347.360 $8,410.000 $25,000.000 $7,100.000
RELOCATE HIGH MAST LIGHTING (150 FT)
EA 3.000 $10,000.000 $11,350.000 $7,813.030 $9,160.000 $15,000.000 $7,550.000
TMA (STATIONARY)
DAY 122.000 $208.000 $288.000 $353.710 $170.000 $200.000 $169.160
TMA (MOBILE OPERATION)
HR 1,695.000 $22.000 $75.000 $75.760 $34.000 $75.000 $92.080
INSTALL OF CELLULAR MODEM
EA 5.000 $3,200.000 $235.000 $243.190 $60.000 $5,000.000 $2.350
TEMP Q-DETECT SYS
EA 3.000 $75,000.000 $79,315.000 $42,236.830 $60,100.000 $75,000.000 $45,000.000
VIVDS TEMPORARY
EA 2.000 $12,000.000 $8,200.000 $8,485.680 $12,610.000 $20,000.000 $8,200.000
Totals: $66,513,432.450 $70,021,318.530 $77,362,842.960 $77,665,665.000 $80,226,690.670 $83,384,490.127