REMOVING CONC (PAV)
|
SY
|
33,825.000
|
$10.000
|
$8.250
|
$9.750
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
821.000
|
$8.000
|
$17.500
|
$8.750
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
883.000
|
$15.000
|
$31.500
|
$16.000
|
|
|
REMOVING CONC (CURB)
|
LF
|
21,905.000
|
$5.000
|
$1.300
|
$3.000
|
|
|
REMOVING STAB BASE & ASPH PAV (8"-10")
|
SY
|
422.000
|
$8.000
|
$37.000
|
$7.500
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
22,162.000
|
$20.000
|
$19.000
|
$45.000
|
|
|
BACKFILL (TY B)
|
STA
|
89.000
|
$400.000
|
$815.000
|
$225.000
|
|
|
BLOCK SODDING
|
SY
|
3,058.000
|
$8.000
|
$5.150
|
$10.500
|
|
|
CELL FBR MLCH SEED(PERM)(URBAN)(CLAY)
|
SY
|
18,336.000
|
$1.000
|
$0.510
|
$0.850
|
|
|
VEGETATIVE WATERING
|
MG
|
407.000
|
$20.000
|
$23.000
|
$20.000
|
|
|
PROOF ROLLING
|
HR
|
352.000
|
$150.000
|
$98.000
|
$60.000
|
|
|
LIME (HYD, COM, OR QK(SLURRY))
|
TON
|
571.000
|
$300.000
|
$360.000
|
$225.000
|
|
|
LIME TRT (SUBGRADE)(6")
|
SY
|
35,208.000
|
$5.000
|
$5.950
|
$4.250
|
|
|
CEM TRT(PLNT MX) (CL L)(TYA)(GR1-2)(6")
|
SY
|
35,208.000
|
$20.000
|
$30.850
|
$25.000
|
|
|
PRIME COAT (AE-P)
|
GAL
|
6,050.000
|
$15.000
|
$9.000
|
$6.000
|
|
|
CONC PVMT (CONT REINF - CRCP) (10")
|
SY
|
30,246.000
|
$85.000
|
$149.000
|
$110.000
|
|
|
CONC PVMT (CONT REINF)(FAST TRK)(13")
|
SY
|
6,451.000
|
$140.000
|
$155.800
|
$175.000
|
|
|
CONC PVMT(CRCP)(TRANSITION SLAB)
|
SY
|
114.000
|
$175.000
|
$340.000
|
$250.000
|
|
|
CEM STABIL BKFL
|
CY
|
1,264.000
|
$100.000
|
$114.000
|
$140.000
|
|
|
CEMENT STAB BACKFILL (INLET OR MH)
|
CY
|
343.000
|
$100.000
|
$113.000
|
$140.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
166.000
|
$3.000
|
$28.500
|
$5.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
43.000
|
$610.000
|
$625.000
|
$550.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
2,224.000
|
$110.000
|
$81.000
|
$60.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
862.000
|
$120.000
|
$98.000
|
$85.000
|
|
|
JCTBOX(COMPL)(PJB)(3FTX3FT)
|
EA
|
1.000
|
$5,750.000
|
$6,600.000
|
$6,100.000
|
|
|
INLET (COMPL)(PCO)(3FT)(NONE)
|
EA
|
4.000
|
$6,850.000
|
$6,000.000
|
$6,500.000
|
|
|
INLET (COMPL)(PCO)(3FT)(LEFT)
|
EA
|
11.000
|
$8,500.000
|
$7,300.000
|
$8,050.000
|
|
|
INLET (COMPL)(PCO)(3FT)(RIGHT)
|
EA
|
10.000
|
$7,750.000
|
$7,300.000
|
$8,100.000
|
|
|
INLET (COMPL)(PCO)(3FT)(BOTH)
|
EA
|
21.000
|
$8,500.000
|
$8,000.000
|
$9,100.000
|
|
|
INLET (COMPL)(PCO)(5FT)(LEFT)
|
EA
|
5.000
|
$7,500.000
|
$7,300.000
|
$8,750.000
|
|
|
INLET (COMPL)(PCO)(5FT)(RIGHT)
|
EA
|
1.000
|
$10,496.210
|
$7,300.000
|
$8,800.000
|
|
|
INLET (COMPL)(PCO)(5FT)(BOTH)
|
EA
|
1.000
|
$9,762.120
|
$8,000.000
|
$8,600.000
|
|
|
INLET (COMPL)(PAZD)(SL)(4FTX4FT)
|
EA
|
19.000
|
$7,000.000
|
$7,100.000
|
$7,750.000
|
|
|
MANH (COMPL)(TY A)
|
EA
|
2.000
|
$7,500.000
|
$7,400.000
|
$6,050.000
|
|
|
REMOV STR (INLET)
|
EA
|
13.000
|
$690.000
|
$570.000
|
$550.000
|
|
|
REMOV STR (PIPE)
|
LF
|
703.000
|
$25.000
|
$17.300
|
$16.000
|
|
|
REMOVE STR (ANCHOR LUG)
|
EA
|
1.000
|
$762.120
|
$15,200.000
|
$950.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,241,140.630
|
$1,035,495.000
|
$1,220,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
18.000
|
$6,000.000
|
$5,000.000
|
$67,500.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
30.000
|
$50.000
|
$35.000
|
$68.420
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
30.000
|
$25.000
|
$15.250
|
$27.370
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
4,015.000
|
$5.000
|
$3.300
|
$5.590
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
4,015.000
|
$3.000
|
$1.050
|
$1.070
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
450.000
|
$8.000
|
$5.600
|
$8.880
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
450.000
|
$3.000
|
$1.050
|
$1.780
|
|
|
TEMP SDMT CONT FENCE (INLET PROTECTION)
|
LF
|
450.000
|
$15.000
|
$5.100
|
$14.500
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
540.000
|
$70.000
|
$101.000
|
$90.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
3,780.000
|
$70.000
|
$88.000
|
$90.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
120.000
|
$70.000
|
$59.000
|
$90.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
13,120.000
|
$8.000
|
$10.320
|
$8.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
440.000
|
$8.000
|
$19.300
|
$8.000
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
540.000
|
$20.000
|
$14.650
|
$10.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
3,780.000
|
$10.000
|
$14.750
|
$10.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
120.000
|
$10.000
|
$24.800
|
$10.000
|
|
|
CONC CURB (MONO) (TY II)
|
LF
|
21,214.000
|
$8.000
|
$11.300
|
$5.500
|
|
|
DRIVEWAYS (CONC)
|
SY
|
733.000
|
$115.000
|
$162.500
|
$85.000
|
|
|
DRIVEWAYS (CONC) (FAST TRACK)
|
SY
|
332.000
|
$100.000
|
$183.000
|
$350.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
500.000
|
$35.000
|
$29.500
|
$20.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
3.000
|
$1,500.000
|
$1,470.000
|
$1,685.150
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
3.000
|
$3,500.000
|
$3,100.000
|
$2,178.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
1.000
|
$15,000.000
|
$10,100.000
|
$8,500.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
24.000
|
$35.000
|
$34.500
|
$36.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
|
EA
|
7.000
|
$725.000
|
$825.000
|
$650.000
|
|
|
RELOCATE SM RD SN SUP&AM(SIGN ONLY)
|
EA
|
5.000
|
$600.000
|
$355.000
|
$350.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
1.000
|
$100.000
|
$117.000
|
$85.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(BRK)
|
LF
|
800.000
|
$5.000
|
$1.300
|
$4.480
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
2,435.000
|
$5.000
|
$1.720
|
$1.580
|
|
|
WK ZN PAV MRK REMOV (W)8"(SLD)
|
LF
|
1,600.000
|
$5.000
|
$2.100
|
$8.960
|
|
|
WK ZN PAV MRK REMOV (W)(ARROW)
|
EA
|
1.000
|
$250.000
|
$198.000
|
$1,418.180
|
|
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
|
LF
|
168.000
|
$1.810
|
$8.100
|
$0.880
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
2,005.000
|
$1.500
|
$7.450
|
$3.000
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
382.000
|
$5.000
|
$8.100
|
$6.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
185.000
|
$8.000
|
$20.500
|
$12.000
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
7.000
|
$143.340
|
$660.000
|
$130.000
|
|
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
|
EA
|
1.000
|
$184.210
|
$660.000
|
$200.000
|
|
REFL PAV MRK TY I(W)(UTURN ARW)(100MIL)
|
EA
|
5.000
|
$200.000
|
$660.000
|
$175.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
7.000
|
$141.340
|
$660.000
|
$175.000
|
|
REFL PAV MRK TY I (W)(RR XING)(100MIL)
|
EA
|
2.000
|
$465.620
|
$660.000
|
$500.000
|
|
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
|
EA
|
42.000
|
$45.000
|
$660.000
|
$30.000
|
|
REFL PAV MRK TY I (Y)8"(SLD)(100MIL)
|
LF
|
610.000
|
$1.010
|
$18.250
|
$3.000
|
|
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
|
LF
|
430.000
|
$3.570
|
$15.250
|
$6.000
|
|
|
PAVEMENT SEALER 6"
|
LF
|
24,088.000
|
$0.500
|
$0.210
|
$0.220
|
|
|
PAVEMENT SEALER 8"
|
LF
|
2,615.000
|
$0.500
|
$0.390
|
$0.300
|
|
|
PAVEMENT SEALER 12"
|
LF
|
812.000
|
$1.000
|
$8.100
|
$1.470
|
|
|
PAVEMENT SEALER 24"
|
LF
|
185.000
|
$3.000
|
$18.250
|
$2.940
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
7.000
|
$40.000
|
$1,525.000
|
$26.450
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
7.000
|
$45.000
|
$1,525.000
|
$29.390
|
|
|
PAVEMENT SEALER (DBL ARROW)
|
EA
|
1.000
|
$60.000
|
$2,530.000
|
$47.030
|
|
|
PAVEMENT SEALER (UTURN ARROW)
|
EA
|
5.000
|
$65.000
|
$3,550.000
|
$39.680
|
|
|
PAVEMENT SEALER (RR XING)
|
EA
|
2.000
|
$100.000
|
$3,550.000
|
$85.230
|
|
|
PAVEMENT SEALER (YLD TRI)
|
EA
|
42.000
|
$15.000
|
$560.000
|
$2.210
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
1,580.000
|
$0.460
|
$0.780
|
$0.880
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
12,285.000
|
$0.530
|
$0.660
|
$0.880
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
10,055.000
|
$0.500
|
$1.230
|
$0.840
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
186.000
|
$8.000
|
$15.250
|
$9.940
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
24,088.000
|
$0.250
|
$0.510
|
$0.180
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
2,615.000
|
$1.000
|
$0.260
|
$0.240
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
812.000
|
$1.000
|
$5.100
|
$1.180
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
185.000
|
$3.000
|
$0.720
|
$2.360
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
7.000
|
$20.000
|
$355.000
|
$21.190
|
|
|
PAV SURF PREP FOR MRK (DBL ARROW)
|
EA
|
1.000
|
$20.000
|
$455.000
|
$37.670
|
|
|
PAV SURF PREP FOR MRK (UTURN ARR)
|
EA
|
5.000
|
$75.000
|
$455.000
|
$31.780
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
7.000
|
$75.000
|
$326.000
|
$23.540
|
|
|
PAV SURF PREP FOR MRK (RR XING)
|
EA
|
2.000
|
$75.000
|
$415.000
|
$68.260
|
|
|
PAV SURF PREP FOR MRK (36")(YLD TRI)
|
EA
|
42.000
|
$15.000
|
$425.000
|
$1.770
|
|
|
TACK COAT
|
GAL
|
3,025.000
|
$5.000
|
$9.480
|
$10.000
|
|
|
D-GR HMA TY-D PG 64-22 (EXEMPT)
|
TON
|
2,197.000
|
$200.000
|
$201.000
|
$195.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
1.000
|
$22,500.000
|
$48,650.000
|
$50,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
16.000
|
$225.000
|
$347.000
|
$500.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
16.000
|
$370.000
|
$347.000
|
$600.000
|
|
Totals: |
$9,616,976.920
|
$12,100,656.820
|
$12,251,354.440
|