Show Job Controls
Bid Cobra

JEFFERSON US 69 (0200-14-086)

Items: 85

County: JEFFERSON
Length: N/A
Highway: US 69
District: BEAUMONT
Control Number: 0200-14-086
DBE Goal: N/A
Project: STP 2019(622)
Guaranty: N/A
Time: 120 WORKING DAYS
Engineer's Estimate: $2,347,355.91
Date: 03/06/2019 (7 years ago)
Contract Number: N/A
Type: REMOVE CONCRETE, GR, BS, SMA
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$2,347,355.91
$2,395,589.66
Over/Under Est: 2.05% $48,233.75
$3,560,186.50
Over/Under Est: 51.67% $1,212,830.59
Amt Left: 48.61% $1,164,596.84
Over/Under Est: 58.51% $1,373,370.92
Amt Left: 55.32% $1,325,137.17
Delta: -4.51% -$160,540.33

Bid Items & Bid Tabulations

85 Total 0 of 85
JEFFERSON  |  US 69  |  BEAUMONT  |  0200-14-086  |  03/06/2019  |  $2,347,355.91  |  STP 2019(622)  |  REMOVE CONC, GR, BS, SMA  |  120 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TEXAS MATERIALS GROUP, INC.
FNH CONSTRUCTION, LLC
HERITAGE ASPHALT COMPANY LLC
REMOVING CONC (PAV)
SY 13,511.000 $3.710 $7.500 $17.500 $7.000
REMOVING CONC (DRIVEWAYS)
SY 779.000 $11.530 $20.000 $20.000 $20.000
REMOVING CONC (CURB)
LF 143.000 $2.000 $9.500 $20.000 $13.000
REMOVING CONC (CURB AND GUTTER)
LF 6,067.000 $2.200 $1.280 $12.500 $8.000
REMOVING STAB BASE AND ASPH PAV (6")
SY 13,511.000 $3.040 $3.050 $6.000 $5.000
REMOVING STAB BASE & ASPH PAV (12")
SY 513.000 $3.500 $15.100 $20.000 $20.000
EXCAVATION (ROADWAY)
CY 3,499.000 $8.600 $13.250 $20.000 $15.000
EMBANKMENT (FINAL)(ORD COMP)(TY A)
CY 70.000 $14.000 $39.000 $30.000 $25.000
BACKFILL (TY B)
STA 64.200 $234.450 $150.000 $250.000 $402.000
BLOCK SODDING
SY 1,605.000 $5.600 $5.100 $5.000 $6.230
CELL FBR MLCH SEED(PERM)(URBAN)(CLAY)
SY 510.000 $0.360 $2.050 $2.000 $2.500
VEGETATIVE WATERING
MG 37.000 $18.970 $26.000 $50.000 $23.000
FL BS (RDWY DEL) (TY D GR 1-2)
TON 111.000 $40.000 $77.000 $40.000 $72.000
LIME (HYD, COM, OR QK(SLURRY))
TON 208.000 $160.000 $190.000 $180.000 $181.000
LIME TRT (SUBGRADE)(6")
SY 15,429.000 $6.000 $4.500 $3.500 $4.000
CEM TRT(PLNT MX) (CL L)(TYA)(GR1-2)(6")
SY 15,429.000 $12.580 $14.000 $31.000 $25.000
ASPHALT STAB BASE (GR 2)(PG 64)
TON 282.000 $78.000 $84.000 $120.000 $85.000
D-GR HMA(SQ) TY-D PG64-22
TON 906.000 $108.850 $80.000 $120.000 $120.000
CONC PVMT (CONT REINF - CRCP) (10")
SY 13,511.000 $63.000 $62.000 $80.000 $92.000
CURB (TYPE II)
LF 1,766.000 $6.600 $22.000 $10.000 $12.000
CONC PVMT (CONT REINF)(FAST TRK)(14")
SY 127.000 $96.110 $150.000 $150.000 $250.000
TRENCH EXCAVATION PROTECTION
LF 80.000 $1.000 $44.000 $4.000 $1.790
CMP (GAL STL 12 IN)
LF 203.000 $45.360 $91.000 $65.000 $60.000
RC PIPE (CL III)(18 IN)
LF 12.000 $56.880 $335.000 $85.000 $100.000
RC PIPE (CL III)(24 IN)
LF 24.000 $75.410 $365.000 $125.000 $120.000
INLET (COMPL)(PCO)(3FT)(NONE)
EA 1.000 $3,380.440 $6,510.000 $5,000.000 $5,000.000
INLET (COMPL)(PCO)(3FT)(LEFT)
EA 3.000 $3,733.920 $6,850.000 $5,000.000 $5,500.000
INLET (COMPL)(PCO)(3FT)(RIGHT)
EA 2.000 $4,254.000 $6,850.000 $5,000.000 $5,500.000
INLET (COMPL)(PCO)(3FT)(BOTH)
EA 2.000 $4,893.880 $7,550.000 $5,000.000 $6,000.000
PIPE (PVC) (SCH 80) (6 IN)
LF 266.000 $14.120 $69.000 $40.000 $30.000
REMOV STR (INLET)
EA 8.000 $926.940 $1,165.000 $2,500.000 $2,300.000
REMOV STR (PIPE)
LF 36.000 $10.680 $24.000 $50.000 $65.000
MOBILIZATION
LS 1.000 $193,710.810 $197,441.000 $300,000.000 $362,013.860
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $3,009.180 $600.000 $8,500.000 $10,000.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,480.000 $3.500 $2.700 $4.000 $5.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,480.000 $1.250 $1.050 $2.000 $2.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 154.000 $6.460 $5.100 $18.000 $5.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 154.000 $1.560 $1.050 $12.000 $0.900
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 720.000 $85.000 $88.000 $75.000 $125.000
PORT CTB (DES SOURCE)(LOW PROF)(TY 1)
LF 2,940.000 $7.280 $11.500 $30.000 $80.000
PORT CTB (DES SOURCE)(LOW PROF)(TY 2)
LF 460.000 $10.530 $23.000 $30.000 $79.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 1,020.000 $7.000 $15.000 $20.000 $8.000
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 3,700.000 $7.750 $14.000 $20.000 $8.000
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 20.000 $7.500 $225.000 $20.000 $15.000
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 720.000 $10.570 $32.000 $20.000 $9.000
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 2,940.000 $8.500 $10.500 $20.000 $9.000
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 460.000 $9.750 $17.000 $20.000 $12.000
CONC CURB (MONO) (TY II)
LF 4,301.000 $6.080 $11.500 $12.000 $10.000
DRIVEWAYS (CONC)
SY 652.000 $118.600 $78.000 $85.000 $100.000
CRASH CUSH ATTEN (INSTL)
EA 2.000 $21,000.000 $19,150.000 $20,000.000 $30,000.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000 $2,960.000 $1,910.000 $5,000.000 $3,500.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $866.500 $910.000 $2,500.000 $1,000.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 2,192.000 $0.440 $0.850 $2.000 $0.500
WK ZN PAV MRK REMOV (W)12"(SLD)
LF 600.000 $3.100 $2.050 $6.000 $2.000
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 240.000 $0.440 $1.050 $2.000 $0.700
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,067.000 $0.720 $1.510 $6.000 $0.700
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 30.000 $5.630 $10.250 $20.000 $2.500
REFL PAV MRK TY I (Y)8"(SLD)(100MIL)
LF 860.000 $0.830 $1.510 $6.000 $1.000
REFL PAV MRK TY II (W) (EXIT GORE)
EA 1.000 $508.500 $305.000 $1,500.000 $100.000
PAVEMENT SEALER 4"
LF 11,117.000 $0.380 $0.130 $1.000 $0.030
PAVEMENT SEALER 8"
LF 1,499.000 $0.250 $0.260 $4.000 $0.070
PAVEMENT SEALER 24"
LF 303.000 $1.260 $0.510 $20.000 $0.350
PAVEMENT SEALER (WORD)
EA 12.000 $25.270 $15.100 $250.000 $11.000
PAVEMENT SEALER (UTURN ARROW)
EA 1.000 $13.000 $5.050 $250.000 $13.000
PAVEMENT SEALER (YLD TRI)
EA 9.000 $16.270 $5.050 $250.000 $20.000
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
LF 1,220.000 $0.460 $0.810 $1.000 $0.720
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 858.000 $0.430 $1.050 $1.000 $0.720
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 95.000 $11.480 $12.100 $20.000 $30.000
PREFAB PAV MRK TY C (W) (UTURN ARROW)
EA 1.000 $351.200 $455.000 $150.000 $400.000
PREFAB PAV MRK TY C (W) (WORD)
EA 12.000 $256.480 $520.000 $150.000 $400.000
PREFAB PAV MRK TY C (W) (18")(YLD TRI)
EA 9.000 $25.250 $35.500 $150.000 $300.000
PREFAB PAV MRK TY C (Y) (24") (SLD)
LF 208.000 $12.000 $12.100 $20.000 $12.000
REFL PAV MRKR TY II-C-R
EA 170.000 $3.120 $5.100 $15.000 $5.000
ELIM EXT PAV MRK & MRKS (4")
LF 500.000 $0.150 $0.610 $1.000 $0.310
ELIM EXT PAV MRK & MRKS (12")
LF 600.000 $1.140 $2.050 $6.000 $2.500
ELIM EXT PAV MRK & MRKS (EXIT GORE)
EA 1.000 $342.700 $1,010.000 $250.000 $30.000
PAV SURF PREP FOR MRK (4")
LF 11,117.000 $0.110 $0.040 $1.000 $0.030
PAV SURF PREP FOR MRK (8")
LF 1,499.000 $0.040 $0.160 $6.000 $0.070
PAV SURF PREP FOR MRK (24")
LF 303.000 $0.380 $0.210 $20.000 $0.210
PAV SURF PREP FOR MRK (UTURN ARR)
EA 1.000 $10.500 $10.100 $250.000 $12.000
PAV SURF PREP FOR MRK (WORD)
EA 12.000 $17.020 $10.100 $245.000 $12.000
PV SRF PRP FOR MK (BLT CLN)(18"YLD TRI)
LF 24.000 $1.000 $5.050 $20.000 $20.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 1.000 $11,464.710 $17,000.000 $12,500.000 $30,000.000
TMA (STATIONARY)
EA 1.000 $1,500.000 $27,000.000 $15,000.000 $100,000.000
TMA (MOBILE OPERATION)
HR 1,920.000 $114.640 $20.500 $55.000 $78.000
Totals: $2,347,355.910 $2,395,589.660 $3,560,186.500 $3,720,726.830