REMOVING CONC (PAV)
|
SY
|
13,511.000
|
$3.710
|
$7.500
|
$17.500
|
$7.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
779.000
|
$11.530
|
$20.000
|
$20.000
|
$20.000
|
|
|
REMOVING CONC (CURB)
|
LF
|
143.000
|
$2.000
|
$9.500
|
$20.000
|
$13.000
|
|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
6,067.000
|
$2.200
|
$1.280
|
$12.500
|
$8.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (6")
|
SY
|
13,511.000
|
$3.040
|
$3.050
|
$6.000
|
$5.000
|
|
|
REMOVING STAB BASE & ASPH PAV (12")
|
SY
|
513.000
|
$3.500
|
$15.100
|
$20.000
|
$20.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
3,499.000
|
$8.600
|
$13.250
|
$20.000
|
$15.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY A)
|
CY
|
70.000
|
$14.000
|
$39.000
|
$30.000
|
$25.000
|
|
|
BACKFILL (TY B)
|
STA
|
64.200
|
$234.450
|
$150.000
|
$250.000
|
$402.000
|
|
|
BLOCK SODDING
|
SY
|
1,605.000
|
$5.600
|
$5.100
|
$5.000
|
$6.230
|
|
|
CELL FBR MLCH SEED(PERM)(URBAN)(CLAY)
|
SY
|
510.000
|
$0.360
|
$2.050
|
$2.000
|
$2.500
|
|
|
VEGETATIVE WATERING
|
MG
|
37.000
|
$18.970
|
$26.000
|
$50.000
|
$23.000
|
|
|
FL BS (RDWY DEL) (TY D GR 1-2)
|
TON
|
111.000
|
$40.000
|
$77.000
|
$40.000
|
$72.000
|
|
|
LIME (HYD, COM, OR QK(SLURRY))
|
TON
|
208.000
|
$160.000
|
$190.000
|
$180.000
|
$181.000
|
|
|
LIME TRT (SUBGRADE)(6")
|
SY
|
15,429.000
|
$6.000
|
$4.500
|
$3.500
|
$4.000
|
|
|
CEM TRT(PLNT MX) (CL L)(TYA)(GR1-2)(6")
|
SY
|
15,429.000
|
$12.580
|
$14.000
|
$31.000
|
$25.000
|
|
|
ASPHALT STAB BASE (GR 2)(PG 64)
|
TON
|
282.000
|
$78.000
|
$84.000
|
$120.000
|
$85.000
|
|
|
D-GR HMA(SQ) TY-D PG64-22
|
TON
|
906.000
|
$108.850
|
$80.000
|
$120.000
|
$120.000
|
|
|
CONC PVMT (CONT REINF - CRCP) (10")
|
SY
|
13,511.000
|
$63.000
|
$62.000
|
$80.000
|
$92.000
|
|
|
CURB (TYPE II)
|
LF
|
1,766.000
|
$6.600
|
$22.000
|
$10.000
|
$12.000
|
|
|
CONC PVMT (CONT REINF)(FAST TRK)(14")
|
SY
|
127.000
|
$96.110
|
$150.000
|
$150.000
|
$250.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
80.000
|
$1.000
|
$44.000
|
$4.000
|
$1.790
|
|
|
CMP (GAL STL 12 IN)
|
LF
|
203.000
|
$45.360
|
$91.000
|
$65.000
|
$60.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
12.000
|
$56.880
|
$335.000
|
$85.000
|
$100.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
24.000
|
$75.410
|
$365.000
|
$125.000
|
$120.000
|
|
|
INLET (COMPL)(PCO)(3FT)(NONE)
|
EA
|
1.000
|
$3,380.440
|
$6,510.000
|
$5,000.000
|
$5,000.000
|
|
|
INLET (COMPL)(PCO)(3FT)(LEFT)
|
EA
|
3.000
|
$3,733.920
|
$6,850.000
|
$5,000.000
|
$5,500.000
|
|
|
INLET (COMPL)(PCO)(3FT)(RIGHT)
|
EA
|
2.000
|
$4,254.000
|
$6,850.000
|
$5,000.000
|
$5,500.000
|
|
|
INLET (COMPL)(PCO)(3FT)(BOTH)
|
EA
|
2.000
|
$4,893.880
|
$7,550.000
|
$5,000.000
|
$6,000.000
|
|
|
PIPE (PVC) (SCH 80) (6 IN)
|
LF
|
266.000
|
$14.120
|
$69.000
|
$40.000
|
$30.000
|
|
|
REMOV STR (INLET)
|
EA
|
8.000
|
$926.940
|
$1,165.000
|
$2,500.000
|
$2,300.000
|
|
|
REMOV STR (PIPE)
|
LF
|
36.000
|
$10.680
|
$24.000
|
$50.000
|
$65.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$193,710.810
|
$197,441.000
|
$300,000.000
|
$362,013.860
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
8.000
|
$3,009.180
|
$600.000
|
$8,500.000
|
$10,000.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
2,480.000
|
$3.500
|
$2.700
|
$4.000
|
$5.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,480.000
|
$1.250
|
$1.050
|
$2.000
|
$2.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
154.000
|
$6.460
|
$5.100
|
$18.000
|
$5.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
154.000
|
$1.560
|
$1.050
|
$12.000
|
$0.900
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
720.000
|
$85.000
|
$88.000
|
$75.000
|
$125.000
|
|
|
PORT CTB (DES SOURCE)(LOW PROF)(TY 1)
|
LF
|
2,940.000
|
$7.280
|
$11.500
|
$30.000
|
$80.000
|
|
|
PORT CTB (DES SOURCE)(LOW PROF)(TY 2)
|
LF
|
460.000
|
$10.530
|
$23.000
|
$30.000
|
$79.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
1,020.000
|
$7.000
|
$15.000
|
$20.000
|
$8.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
3,700.000
|
$7.750
|
$14.000
|
$20.000
|
$8.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
20.000
|
$7.500
|
$225.000
|
$20.000
|
$15.000
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
720.000
|
$10.570
|
$32.000
|
$20.000
|
$9.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
2,940.000
|
$8.500
|
$10.500
|
$20.000
|
$9.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
460.000
|
$9.750
|
$17.000
|
$20.000
|
$12.000
|
|
|
CONC CURB (MONO) (TY II)
|
LF
|
4,301.000
|
$6.080
|
$11.500
|
$12.000
|
$10.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
652.000
|
$118.600
|
$78.000
|
$85.000
|
$100.000
|
|
|
CRASH CUSH ATTEN (INSTL)
|
EA
|
2.000
|
$21,000.000
|
$19,150.000
|
$20,000.000
|
$30,000.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$2,960.000
|
$1,910.000
|
$5,000.000
|
$3,500.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$866.500
|
$910.000
|
$2,500.000
|
$1,000.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
2,192.000
|
$0.440
|
$0.850
|
$2.000
|
$0.500
|
|
|
WK ZN PAV MRK REMOV (W)12"(SLD)
|
LF
|
600.000
|
$3.100
|
$2.050
|
$6.000
|
$2.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
240.000
|
$0.440
|
$1.050
|
$2.000
|
$0.700
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
1,067.000
|
$0.720
|
$1.510
|
$6.000
|
$0.700
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
30.000
|
$5.630
|
$10.250
|
$20.000
|
$2.500
|
|
REFL PAV MRK TY I (Y)8"(SLD)(100MIL)
|
LF
|
860.000
|
$0.830
|
$1.510
|
$6.000
|
$1.000
|
|
REFL PAV MRK TY II (W) (EXIT GORE)
|
EA
|
1.000
|
$508.500
|
$305.000
|
$1,500.000
|
$100.000
|
|
|
PAVEMENT SEALER 4"
|
LF
|
11,117.000
|
$0.380
|
$0.130
|
$1.000
|
$0.030
|
|
|
PAVEMENT SEALER 8"
|
LF
|
1,499.000
|
$0.250
|
$0.260
|
$4.000
|
$0.070
|
|
|
PAVEMENT SEALER 24"
|
LF
|
303.000
|
$1.260
|
$0.510
|
$20.000
|
$0.350
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
12.000
|
$25.270
|
$15.100
|
$250.000
|
$11.000
|
|
|
PAVEMENT SEALER (UTURN ARROW)
|
EA
|
1.000
|
$13.000
|
$5.050
|
$250.000
|
$13.000
|
|
|
PAVEMENT SEALER (YLD TRI)
|
EA
|
9.000
|
$16.270
|
$5.050
|
$250.000
|
$20.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
|
LF
|
1,220.000
|
$0.460
|
$0.810
|
$1.000
|
$0.720
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
858.000
|
$0.430
|
$1.050
|
$1.000
|
$0.720
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
95.000
|
$11.480
|
$12.100
|
$20.000
|
$30.000
|
|
PREFAB PAV MRK TY C (W) (UTURN ARROW)
|
EA
|
1.000
|
$351.200
|
$455.000
|
$150.000
|
$400.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
12.000
|
$256.480
|
$520.000
|
$150.000
|
$400.000
|
|
PREFAB PAV MRK TY C (W) (18")(YLD TRI)
|
EA
|
9.000
|
$25.250
|
$35.500
|
$150.000
|
$300.000
|
|
PREFAB PAV MRK TY C (Y) (24") (SLD)
|
LF
|
208.000
|
$12.000
|
$12.100
|
$20.000
|
$12.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
170.000
|
$3.120
|
$5.100
|
$15.000
|
$5.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
500.000
|
$0.150
|
$0.610
|
$1.000
|
$0.310
|
|
|
ELIM EXT PAV MRK & MRKS (12")
|
LF
|
600.000
|
$1.140
|
$2.050
|
$6.000
|
$2.500
|
|
|
ELIM EXT PAV MRK & MRKS (EXIT GORE)
|
EA
|
1.000
|
$342.700
|
$1,010.000
|
$250.000
|
$30.000
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
11,117.000
|
$0.110
|
$0.040
|
$1.000
|
$0.030
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
1,499.000
|
$0.040
|
$0.160
|
$6.000
|
$0.070
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
303.000
|
$0.380
|
$0.210
|
$20.000
|
$0.210
|
|
|
PAV SURF PREP FOR MRK (UTURN ARR)
|
EA
|
1.000
|
$10.500
|
$10.100
|
$250.000
|
$12.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
12.000
|
$17.020
|
$10.100
|
$245.000
|
$12.000
|
|
|
PV SRF PRP FOR MK (BLT CLN)(18"YLD TRI)
|
LF
|
24.000
|
$1.000
|
$5.050
|
$20.000
|
$20.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
1.000
|
$11,464.710
|
$17,000.000
|
$12,500.000
|
$30,000.000
|
|
|
TMA (STATIONARY)
|
EA
|
1.000
|
$1,500.000
|
$27,000.000
|
$15,000.000
|
$100,000.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
1,920.000
|
$114.640
|
$20.500
|
$55.000
|
$78.000
|
|
Totals: |
$2,347,355.910
|
$2,395,589.660
|
$3,560,186.500
|
$3,720,726.830
|