PREPARING ROW
|
STA
|
166.000
|
$7,500.000
|
$319,000.000
|
|
|
|
REMOVING CONC (PAV)
|
SY
|
267,804.000
|
$10.400
|
$8.000
|
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
8,466.000
|
$10.000
|
$8.000
|
|
|
|
REMOVING CONC (MEDIANS)
|
SY
|
105.000
|
$20.000
|
$50.000
|
|
|
|
REMOVING CONC (SIDEWALKS)
|
SY
|
1,886.000
|
$12.500
|
$10.000
|
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
13,080.000
|
$15.000
|
$13.000
|
|
|
|
REMOVING CONC (CTB)
|
LF
|
10,194.000
|
$7.000
|
$6.000
|
|
|
|
REMOVE CONC (RAIL)
|
LF
|
9,545.000
|
$20.000
|
$16.000
|
|
|
|
REMOVING CONC (PAVERS)
|
SY
|
1,864.000
|
$20.000
|
$9.000
|
|
|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
7,600.000
|
$7.000
|
$15.000
|
|
|
|
REMOVING STAB BASE AND ASPH PAV (6")
|
SY
|
11,673.000
|
$4.000
|
$9.000
|
|
|
|
REMOVING STAB BASE & ASPH PAV (8"-10")
|
SY
|
117,253.000
|
$5.000
|
$6.000
|
|
|
|
REMOVING STAB BASE AND ASPH PAV (7")
|
SY
|
138,878.000
|
$7.000
|
$6.000
|
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
544,792.000
|
$6.000
|
$3.000
|
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
52,567.000
|
$16.000
|
$20.000
|
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
96,671.000
|
$7.500
|
$5.000
|
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY C2)(DS)
|
CY
|
17,089.000
|
$20.000
|
$60.000
|
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
226,463.000
|
$2.070
|
$2.000
|
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
34,530.000
|
$0.950
|
$2.000
|
|
|
|
BLOCK SODDING
|
SY
|
13,852.000
|
$6.500
|
$5.500
|
|
|
|
STRAW OR HAY MULCH
|
SY
|
34,530.000
|
$0.180
|
$0.350
|
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
226,463.000
|
$2.050
|
$0.170
|
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
226,463.000
|
$2.600
|
$0.170
|
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
|
SY
|
226,463.000
|
$0.580
|
$0.350
|
|
|
|
DRILL SEEDING (PERM)(WARM OR COOL)
|
SY
|
17,265.000
|
$0.140
|
$0.170
|
|
|
|
VEGETATIVE WATERING
|
MG
|
1,180.000
|
$118.800
|
$35.000
|
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY A)
|
SY
|
40,220.000
|
$4.140
|
$1.090
|
|
|
|
PROOF ROLLING
|
HR
|
10,000.000
|
$100.000
|
$50.000
|
|
|
|
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
|
CY
|
43,184.000
|
$82.750
|
$90.000
|
|
|
|
FL BS (CMP IN PLC)(TY D GR 3)(FNAL POS)
|
CY
|
2,356.000
|
$82.750
|
$100.000
|
|
|
|
LIME (HYD, COM, OR QK(SLURRY))
|
TON
|
3,937.000
|
$200.000
|
$450.000
|
|
|
|
LIME TRT (SUBGRADE)(6")
|
SY
|
243,044.000
|
$3.500
|
$3.000
|
|
|
|
CEM TRT(PLNT MX) (CL L)(TYD)(GR1-2)(6")
|
SY
|
156,495.000
|
$10.000
|
$12.000
|
|
|
|
CEM TRT(PLNT MX)(CL N)(TY D)(GR1-2)(8")
|
SY
|
86,550.000
|
$20.000
|
$18.000
|
|
|
|
PRIME COAT (AE-P)
|
GAL
|
48,609.000
|
$3.500
|
$4.000
|
|
|
|
CONC PVMT (CONT REINF - CRCP) (10")
|
SY
|
123,374.000
|
$55.000
|
$60.000
|
|
|
|
CONC PVMT (CONT REINF - CRCP) (13")
|
SY
|
81,777.000
|
$60.000
|
$100.000
|
|
|
|
CONC PVMT (CONT REINF)(FAST TRK)(13")
|
SY
|
20,087.000
|
$95.000
|
$145.000
|
|
|
|
CEM STABIL BKFL
|
CY
|
54,209.700
|
$110.000
|
$73.960
|
|
|
|
CUT & RESTORING PAV
|
SY
|
200.000
|
$90.590
|
$342.940
|
|
|
|
CUT & RESTORE CONC PAVING
|
SY
|
74.000
|
$200.000
|
$415.480
|
|
|
|
CEMENT STAB BACKFILL (INLET OR MH)
|
CY
|
4,892.300
|
$200.000
|
$73.960
|
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
60,135.000
|
$25.000
|
$3.940
|
|
|
|
TEMPORARY SPL SHORING
|
SF
|
326,779.700
|
$30.000
|
$40.000
|
|
|
|
PRESTR CONC PIL (18 IN SQ)
|
LF
|
225,000.000
|
$105.000
|
$50.000
|
|
|
|
DRILL SHAFT (24 IN)
|
LF
|
332.000
|
$224.000
|
$250.000
|
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
10,111.000
|
$250.000
|
$400.000
|
|
|
|
DRILL SHAFT (48 IN)
|
LF
|
2,364.000
|
$650.000
|
$500.000
|
|
|
|
DRILL SHAFT (60 IN)
|
LF
|
93,087.000
|
$580.000
|
$600.000
|
|
|
|
DRILL SHAFT (72 IN)
|
LF
|
6,340.000
|
$1,171.000
|
$800.000
|
|
|
|
DRILL SHAFT (78 IN)
|
LF
|
15,480.000
|
$1,050.000
|
$900.000
|
|
|
|
DRILL SHAFT (84 IN)
|
LF
|
1,460.000
|
$1,172.000
|
$1,100.000
|
|
|
|
DRILL SHAFT (SIGN MTS) (36 IN)
|
LF
|
104.000
|
$358.100
|
$474.410
|
|
|
|
DRILL SHAFT (SIGN MTS) (42 IN)
|
LF
|
468.000
|
$455.490
|
$462.100
|
|
|
|
DRILL SHAFT (SIGN MTS) (48 IN)
|
LF
|
375.000
|
$639.160
|
$531.950
|
|
|
|
DRILL SHAFT (SIGN MTS) (54 IN)
|
LF
|
290.000
|
$656.060
|
$583.510
|
|
|
|
DRILL SHAFT (HIGH MAST POLE) (60 IN)
|
LF
|
1,045.000
|
$650.000
|
$667.500
|
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
730.000
|
$220.000
|
$224.080
|
|
|
|
DRILL SHAFT (TRF SIG POLE) (24 IN)
|
LF
|
288.000
|
$130.000
|
$197.570
|
|
|
|
DRILL SHAFT (TRF SIG POLE) (36 IN)
|
LF
|
378.000
|
$430.000
|
$277.580
|
|
|
|
DRILL SHAFT (TRF SIG POLE) (42 IN)
|
LF
|
90.000
|
$500.000
|
$335.070
|
|
|
|
DRILL SHAFT (TRF SIG POLE) (48 IN)
|
LF
|
22.000
|
$530.000
|
$444.050
|
|
|
|
DRILL SHAFT (90 IN)
|
LF
|
170.000
|
$1,425.000
|
$1,500.000
|
|
|
|
CL C CONC (ABUT)
|
CY
|
459.900
|
$1,000.000
|
$1,900.000
|
|
|
|
CL C CONC (CAP)
|
CY
|
10,716.200
|
$1,250.000
|
$1,100.000
|
|
|
|
CL C CONC (CAP)(MASS)
|
CY
|
1,278.800
|
$1,160.000
|
$1,200.000
|
|
|
|
CL C CONC (COLUMN)
|
CY
|
4,120.400
|
$1,000.000
|
$2,000.000
|
|
|
|
CL C CONC (WINGWALLS)
|
CY
|
8.700
|
$2,142.000
|
$1,585.370
|
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
2,689.000
|
$400.000
|
$500.000
|
|
|
|
CL C CONC (COLLAR)
|
EA
|
10.000
|
$2,000.000
|
$3,249.290
|
|
|
|
CL C CONC (MISC)
|
CY
|
3,333.000
|
$500.000
|
$1,400.000
|
|
|
|
CL F CONC (CAP)
|
CY
|
7,377.100
|
$1,300.000
|
$1,200.000
|
|
|
|
CL F CONC (CAP)(MASS)
|
CY
|
3,389.200
|
$1,117.000
|
$1,000.000
|
|
|
|
CL F CONC (COLUMN)
|
CY
|
7,664.200
|
$1,000.000
|
$1,500.000
|
|
|
|
CL F CONC (COLUMN)(MASS)
|
CY
|
7,980.200
|
$1,000.000
|
$1,100.000
|
|
|
|
CL F CONC (FOOTING)(MASS)
|
CY
|
25,016.300
|
$1,000.000
|
$800.000
|
|
|
|
REINF CONC SLAB
|
SF
|
1,707,271.400
|
$14.000
|
$20.000
|
|
|
|
APPROACH SLAB
|
CY
|
775.700
|
$450.000
|
$600.000
|
|
|
|
RETAINING WALL (MSE)
|
SF
|
42,032.000
|
$60.000
|
$97.000
|
|
|
|
RETAINING WALL (TEMP WALL)
|
SF
|
28,115.000
|
$27.050
|
$15.000
|
|
|
|
PRESTR CONC GIRDER (TX40)
|
LF
|
1,692.600
|
$185.000
|
$120.000
|
|
|
|
PRESTR CONC GIRDER (TX54)
|
LF
|
212,626.400
|
$165.000
|
$130.000
|
|
|
|
PRESTR CONC GIRDER (TX62)
|
LF
|
3,291.300
|
$162.980
|
$135.000
|
|
|
|
PRESTR CONC GIRDER (TX70)
|
LF
|
1,763.900
|
$250.000
|
$185.000
|
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
12.800
|
$475.000
|
$800.000
|
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
177.000
|
$400.000
|
$800.000
|
|
|
|
RIPRAP (CONC)(CL B)
|
CY
|
541.000
|
$500.000
|
$800.000
|
|
|
|
RIPRAP (CONC)(CL B)(RR8&RR9)
|
CY
|
20.000
|
$611.000
|
$800.000
|
|
|
|
RIPRAP (CONC) (CL B) (4")
|
CY
|
111.000
|
$525.000
|
$800.000
|
|
|
|
RIPRAP (CONC)(CL B)(5 IN)
|
CY
|
65.000
|
$480.000
|
$800.000
|
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
329.000
|
$550.000
|
$850.000
|
|
|
|
ELASTOMERIC BEARING (EE5)
|
EA
|
14.000
|
$4,500.000
|
$5,000.000
|
|
|
|
HLMR BEARING (F - 1200)
|
EA
|
3.000
|
$9,000.000
|
$8,000.000
|
|
|
|
HLMR BEARING (E - 500)
|
EA
|
8.000
|
$7,000.000
|
$8,000.000
|
|
|
|
HLMR BEARING (GE - 500)
|
EA
|
6.000
|
$7,000.000
|
$8,000.000
|
|
|
|
HLMR BEARING (GE - 1200)
|
EA
|
3.000
|
$9,000.000
|
$8,000.000
|
|
|
|
STR STEEL (PLATE GIRDER)
|
LB
|
4,873,504.000
|
$2.000
|
$2.500
|
|
|
|
STR STEEL (MISCELLANEOUS BRIDGE)
|
LB
|
303,849.000
|
$10.000
|
$2.500
|
|
|
|
STR STEEL (DIAPHRAGM & STIFFENER)
|
LB
|
744,594.000
|
$2.000
|
$2.500
|
|
|
|
STR STEEL (SHEAR CONNECTOR)
|
LB
|
29,295.000
|
$7.000
|
$2.500
|
|
|
|
STR STEEL (FINGER JOINT)
|
LB
|
18,100.000
|
$30.000
|
$10.000
|
|
|
|
RAIL (TY SSTR)
|
LF
|
32,972.500
|
$57.690
|
$60.000
|
|
|
|
RAIL (TY T80SS)
|
LF
|
7,759.300
|
$140.000
|
$175.000
|
|
|
|
RAIL (TY SSTR) (W/DRAIN SLOTS)
|
LF
|
20,135.900
|
$55.000
|
$60.000
|
|
|
|
RAIL (TY T80SS) W/DRAIN SLOTS
|
LF
|
1,260.100
|
$150.000
|
$170.000
|
|
|
|
RAIL (TY T80PP)
|
LF
|
2,655.900
|
$140.000
|
$170.000
|
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
10,807.000
|
$111.000
|
$175.000
|
|
|
|
SEALED EXPANSION JOINT (5 IN) (SEJ - M)
|
LF
|
155.000
|
$165.000
|
$175.000
|
|
|
|
CONC BOX CULV (3 FT X 2 FT)
|
LF
|
3,261.000
|
$240.000
|
$429.800
|
|
|
|
CONC BOX CULV (3 FT X 3 FT)
|
LF
|
832.000
|
$260.000
|
$455.900
|
|
|
|
CONC BOX CULV (4 FT X 2 FT)
|
LF
|
534.000
|
$275.000
|
$452.960
|
|
|
|
CONC BOX CULV (4 FT X 3 FT)
|
LF
|
881.000
|
$320.000
|
$490.930
|
|
|
|
CONC BOX CULV (4 FT X 4 FT)
|
LF
|
1,681.000
|
$310.000
|
$528.400
|
|
|
|
CONC BOX CULV (5 FT X 3 FT)
|
LF
|
292.000
|
$315.000
|
$605.600
|
|
|
|
CONC BOX CULV (5 FT X 4 FT)
|
LF
|
1,203.000
|
$335.000
|
$646.990
|
|
|
|
CONC BOX CULV (5 FT X 5 FT)
|
LF
|
2,389.000
|
$400.000
|
$673.260
|
|
|
|
CONC BOX CULV (6 FT X 5 FT)
|
LF
|
4,728.000
|
$480.000
|
$809.920
|
|
|
|
CONC BOX CULV (7 FT X 3 FT)
|
LF
|
301.000
|
$420.000
|
$863.480
|
|
|
|
CONC BOX CULV (7 FT X 4 FT)
|
LF
|
1,841.000
|
$525.000
|
$900.930
|
|
|
|
CONC BOX CULV (7 FT X 5 FT)
|
LF
|
1,219.000
|
$605.000
|
$968.310
|
|
|
|
CONC BOX CULV (7 FT X 6 FT)
|
LF
|
1,341.000
|
$700.000
|
$1,013.760
|
|
|
|
CONC BOX CULV (7 FT X 7 FT)
|
LF
|
146.000
|
$725.000
|
$1,140.130
|
|
|
|
CONC BOX CULV (8 FT X 6 FT)
|
LF
|
2,066.000
|
$760.000
|
$1,101.890
|
|
|
|
CONC BOX CULV (8 FT X 7 FT)
|
LF
|
6,386.000
|
$900.000
|
$1,137.020
|
|
|
|
CONC BOX CULV (8 FT X 8 FT)
|
LF
|
11,027.000
|
$1,000.000
|
$1,237.520
|
|
|
|
CONC BOX CULV (9 FT X 6 FT)
|
LF
|
177.000
|
$850.000
|
$1,444.320
|
|
|
|
CONC BOX CULV (9 FT X 8 FT)
|
LF
|
218.000
|
$1,300.000
|
$1,383.340
|
|
|
|
CONC BOX CULV (10 FT X 6 FT)
|
LF
|
272.000
|
$1,115.000
|
$1,536.130
|
|
|
|
CONC BOX CULV (11 FT X 4 FT)
|
LF
|
1,030.000
|
$1,500.000
|
$1,526.490
|
|
|
|
MANH (COMPL)(PRM)(48IN)
|
EA
|
11.000
|
$4,000.000
|
$7,516.960
|
|
|
|
MANH (COMPL)(PRM)(60IN)
|
EA
|
2.000
|
$6,000.000
|
$9,484.340
|
|
|
|
JCTBOX(COMPL)(PJB)(3FTX3FT)
|
EA
|
1.000
|
$4,000.000
|
$7,318.210
|
|
|
|
JCTBOX(COMPL)(PJB)(4FTX4FT)
|
EA
|
15.000
|
$4,500.000
|
$9,075.720
|
|
|
|
JCTBOX(COMPL)(PJB)(4FTX5FT)
|
EA
|
2.000
|
$8,200.000
|
$9,589.280
|
|
|
|
JCTBOX(COMPL)(PJB)(5FTX5FT)
|
EA
|
7.000
|
$6,650.000
|
$10,871.330
|
|
|
|
JCTBOX(COMPL)(PJB)(5FTX6FT)
|
EA
|
3.000
|
$8,000.000
|
$14,864.280
|
|
|
|
JCTBOX(COMPL)(PJB)(6FTX6FT)
|
EA
|
4.000
|
$5,000.000
|
$14,465.430
|
|
|
|
JCTBOX(COMPL)(PJB)(8FTX8FT)
|
EA
|
10.000
|
$18,000.000
|
$23,558.730
|
|
|
|
INLET (COMPL)(PCO)(3FT)(NONE)
|
EA
|
4.000
|
$4,500.000
|
$6,224.380
|
|
|
|
INLET (COMPL)(PCO)(3FT)(LEFT)
|
EA
|
11.000
|
$4,900.000
|
$7,713.400
|
|
|
|
INLET (COMPL)(PCO)(3FT)(RIGHT)
|
EA
|
3.000
|
$4,900.000
|
$7,683.140
|
|
|
|
INLET (COMPL)(PCO)(3FT)(BOTH)
|
EA
|
15.000
|
$5,800.000
|
$8,686.390
|
|
|
|
INLET (COMPL)(PCU)(3FT)(NONE)
|
EA
|
55.000
|
$4,100.000
|
$8,288.270
|
|
|
|
INLET (COMPL)(PCU)(3FT)(LEFT)
|
EA
|
98.000
|
$6,000.000
|
$11,083.700
|
|
|
|
INLET (COMPL)(PCU)(3FT)(RIGHT)
|
EA
|
95.000
|
$6,000.000
|
$9,931.470
|
|
|
|
INLET (COMPL)(PCU)(4FT)(NONE)
|
EA
|
2.000
|
$4,900.000
|
$7,567.710
|
|
|
|
INLET (COMPL)(PCU)(4FT)(LEFT)
|
EA
|
5.000
|
$6,900.000
|
$9,112.300
|
|
|
|
INLET (COMPL)(PCU)(4FT)(RIGHT)
|
EA
|
2.000
|
$6,900.000
|
$9,177.760
|
|
|
|
INLET (COMPL)(PCU)(5FT)(NONE)
|
EA
|
2.000
|
$4,750.000
|
$11,735.200
|
|
|
|
INLET (COMPL)(PCU)(6FT)(NONE)
|
EA
|
2.000
|
$5,200.000
|
$21,212.750
|
|
|
|
INLET (COMPL)(PMBD)(4FT)
|
EA
|
15.000
|
$4,300.000
|
$11,255.590
|
|
|
|
INLET (COMPL)(POD)(SFG)(4FTX4FT)
|
EA
|
22.000
|
$5,500.000
|
$9,647.250
|
|
|
|
INLET (COMPL)(POD)(SFG)(3FTX5FT)
|
EA
|
16.000
|
$4,500.000
|
$10,208.150
|
|
|
|
INLET (COMPL)(PAZD)(SL)(4FTX4FT)
|
EA
|
5.000
|
$5,000.000
|
$9,095.990
|
|
|
|
INLET (COMPL)(PAZD)(SL)(5FTX5FT)
|
EA
|
9.000
|
$5,500.000
|
$7,638.090
|
|
|
|
INLET(COMPL)(PAZD)(FG)(4FTX4FT-4FTX4FT)
|
EA
|
45.000
|
$5,200.000
|
$12,984.860
|
|
|
|
INLET(COMPL)(PAZD)(FG)(5FTX5FT-4FTX4FT)
|
EA
|
1.000
|
$5,500.000
|
$13,333.230
|
|
|
|
INLET (COMPL)(TY MSE1)
|
EA
|
4.000
|
$2,500.000
|
$11,876.450
|
|
|
|
JCT BOX (COMPL)(SPL)
|
EA
|
2.000
|
$60,000.000
|
$136,076.890
|
|
|
|
MANH (COMPL)(RISER ONLY)
|
EA
|
77.000
|
$4,500.000
|
$8,928.480
|
|
|
|
INLET (STAGE II) (PCU) (3 FT) (LEFT)
|
EA
|
14.000
|
$4,200.000
|
$5,756.010
|
|
|
|
INLET (STAGE II) (PCU) (3 FT) (NONE)
|
EA
|
15.000
|
$4,000.000
|
$4,915.970
|
|
|
|
INLET (STAGE II) (PCU) (3 FT) (RIGHT)
|
EA
|
22.000
|
$4,200.000
|
$5,772.700
|
|
|
|
JCT BOX (COMPL) (CIP) (13FTX8FT)
|
EA
|
1.000
|
$50,000.000
|
$86,653.390
|
|
|
|
WINGWALL (PW - 2) (HW=10 FT)
|
EA
|
1.000
|
$30,000.000
|
$55,253.470
|
|
|
|
SET (TY I)(S= 4 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
1.000
|
$15,000.000
|
$24,876.550
|
|
|
|
SET (TY I)(S= 6 FT)(HW= 5 FT)(4:1) (C)
|
EA
|
1.000
|
$15,000.000
|
$26,680.860
|
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$1,100.000
|
$2,383.820
|
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$1,000.000
|
$2,485.820
|
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
6.000
|
$1,500.000
|
$2,667.030
|
|
|
|
GRATE AND FRAME (BRIDGE DRAIN)
|
EA
|
86.000
|
$2,280.000
|
$8,000.000
|
|
|
|
JACK BOR TUN BOX CULV (10 FT X 4 FT)
|
LF
|
312.000
|
$3,300.000
|
$6,500.000
|
|
|
|
JACK BOR TUN BOX CULV (11 FT X 4 FT)
|
LF
|
162.000
|
$4,000.000
|
$7,500.000
|
|
|
|
ADJUSTING MANHOLES
|
EA
|
2.000
|
$1,000.000
|
$6,500.000
|
|
|
|
REMOV STR (INLET)
|
EA
|
310.000
|
$500.000
|
$306.200
|
|
|
|
REMOV STR (MANHOLE)
|
EA
|
3.000
|
$500.000
|
$227.220
|
|
|
|
REMOV STR (PIPE)
|
LF
|
28,436.000
|
$20.000
|
$25.880
|
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
18,648.000
|
$200.000
|
$50.520
|
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
5.000
|
$50,000.000
|
$200,000.000
|
|
|
|
REMOV STR (BRIDGE 500 - 999 FT LENGTH)
|
EA
|
1.000
|
$225,000.000
|
$700,000.000
|
|
|
|
REMOV STR (BRIDGE 1000 FT OR GREATER)
|
EA
|
3.000
|
$350,000.000
|
$400,000.000
|
|
|
|
REMOV STR (RET WALL)
|
LF
|
3,739.000
|
$50.000
|
$300.000
|
|
|
|
REMOVE STR (PILING)
|
EA
|
42.000
|
$6,750.000
|
$1,500.000
|
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$43,172,161.510
|
$58,400,000.000
|
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
57.000
|
$48,000.000
|
$20,000.000
|
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
435.000
|
$56.400
|
$45.000
|
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
435.000
|
$17.320
|
$10.000
|
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
1,904.000
|
$28.570
|
$35.000
|
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
1,904.000
|
$10.580
|
$10.000
|
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
5,465.000
|
$4.870
|
$3.000
|
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
5,465.000
|
$2.250
|
$1.000
|
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
11,428.000
|
$10.850
|
$5.000
|
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
11,428.000
|
$4.300
|
$1.000
|
|
|
|
TEMP SDMT CONT FENCE (INLET PROTECTION)
|
LF
|
840.000
|
$12.000
|
$10.000
|
|
|
|
CONSTRUCTING DETOURS (TY 1)
|
SY
|
4,695.000
|
$58.360
|
$180.000
|
|
|
|
CONSTRUCTING DETOURS (TY 2)
|
SY
|
31,160.000
|
$47.500
|
$163.000
|
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
40,170.000
|
$42.340
|
$70.000
|
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
15,220.000
|
$32.950
|
$60.000
|
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
1,180.000
|
$51.110
|
$60.000
|
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
182,280.000
|
$5.570
|
$5.000
|
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
37,960.000
|
$6.630
|
$5.000
|
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
2,800.000
|
$23.460
|
$5.000
|
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
40,170.000
|
$8.590
|
$5.000
|
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
15,220.000
|
$12.500
|
$5.000
|
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
1,180.000
|
$12.070
|
$5.000
|
|
|
|
PERM CTB (SGL SLOPE) (TY 1) (42 )
|
LF
|
7,389.000
|
$120.000
|
$80.000
|
|
|
|
PERM CTB (SGL SLOPE) (TY 1) (54 )
|
LF
|
2,922.900
|
$80.000
|
$110.000
|
|
|
|
PERM CTB (SGL SLOPE) (TY 3) (54 )
|
LF
|
116.300
|
$350.000
|
$210.000
|
|
|
|
PERM CTB (SGL SLOPE)(TY 1)(TRANSITION)
|
LF
|
100.000
|
$200.000
|
$280.000
|
|
|
|
CONC CURB (MONO) (TY I)
|
LF
|
939.300
|
$5.000
|
$9.190
|
|
|
|
CONC CURB (MONO) (TY II)
|
LF
|
59,811.590
|
$6.000
|
$8.310
|
|
|
|
DRIVEWAYS (CONC)
|
SY
|
9,636.000
|
$130.000
|
$115.000
|
|
|
|
CONC SIDEWALKS (4")
|
SY
|
13,846.000
|
$60.000
|
$90.000
|
|
|
|
CURB RAMPS (TY 1)
|
EA
|
10.000
|
$1,700.000
|
$2,600.000
|
|
|
|
CURB RAMPS (TY 2)
|
EA
|
2.000
|
$2,000.000
|
$2,600.000
|
|
|
|
CURB RAMPS (TY 3)
|
EA
|
3.000
|
$1,900.000
|
$2,600.000
|
|
|
|
CURB RAMPS (TY 5)
|
EA
|
1.000
|
$5,000.000
|
$3,400.000
|
|
|
|
CURB RAMPS (TY 7)
|
EA
|
33.000
|
$2,000.000
|
$2,700.000
|
|
|
|
CURB RAMPS (TY 10)
|
EA
|
26.000
|
$1,900.000
|
$2,700.000
|
|
|
|
CURB RAMPS (TY 21)
|
EA
|
2.000
|
$2,400.000
|
$3,600.000
|
|
|
|
CURB RAMPS (TY 22)
|
EA
|
18.000
|
$3,000.000
|
$4,300.000
|
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,325.000
|
$30.000
|
$25.750
|
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
19.000
|
$2,500.000
|
$1,985.000
|
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
3.000
|
$1,500.000
|
$1,445.000
|
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
7,600.000
|
$3.600
|
$5.000
|
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
16.000
|
$250.000
|
$313.000
|
|
|
|
REMOVE DOWNSTREAM ANCHOR TERMINAL
|
EA
|
2.000
|
$150.000
|
$287.000
|
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
5.000
|
$250.000
|
$295.000
|
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
20.000
|
$3,100.000
|
$2,750.000
|
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
26.000
|
$300.000
|
$450.000
|
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
57.000
|
$1,570.030
|
$1,900.000
|
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
28.000
|
$950.000
|
$900.000
|
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
1.000
|
$25,100.000
|
$27,500.000
|
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(W)(TL2)
|
EA
|
1.000
|
$20,000.000
|
$54,375.000
|
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(W)(TL3)
|
EA
|
11.000
|
$20,000.000
|
$43,500.000
|
|
|
|
CRASH CUSH ATTEN (INSTL)(R)(N)(TL3)
|
EA
|
20.000
|
$20,907.000
|
$24,500.000
|
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
3.000
|
$10,000.000
|
$8,500.000
|
|
|
|
PIPE UNDERDRAINS (TY 6) (6")
|
LF
|
5,269.000
|
$20.000
|
$35.000
|
|
|
|
REMOVE RD IL ASM (SHOE-BASE)
|
EA
|
15.000
|
$5,000.000
|
$2,050.000
|
|
|
|
IN RD IL (U/P) (TY 1) (150W EQ) LED
|
EA
|
91.000
|
$4,000.000
|
$1,491.880
|
|
|
|
IN RD IL (TY SA) 40T-8 (250W EQ) LED
|
EA
|
74.000
|
$20,000.000
|
$5,335.210
|
|
|
|
HI MST IL POLE (150 FT)(100 MPH)
|
EA
|
15.000
|
$25,000.000
|
$60,003.000
|
|
|
|
HI MST IL POLE (175 FT)(100 MPH)
|
EA
|
4.000
|
$24,000.000
|
$77,772.000
|
|
|
|
LED HI MST IL ASM (6 FIXT)(SYM)(TY S)
|
EA
|
6.000
|
$20,000.000
|
$34,480.000
|
|
|
|
LED HI MST IL ASM (6 FIXT)(ASYM)(TY A)
|
EA
|
13.000
|
$24,000.000
|
$34,165.000
|
|
|
|
REPLC LED HI MST IL(6 FIXT)(SYM)(TY S)
|
EA
|
10.000
|
$20,000.000
|
$8,335.000
|
|
|
|
REPLC LED HI MST IL(6 FIXT)(ASYM)(TY A)
|
EA
|
1.000
|
$18,000.000
|
$8,020.000
|
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
33,176.000
|
$15.000
|
$10.030
|
|
|
|
CONDT (PVC) (SCH 40) (2") (BORE)
|
LF
|
290.000
|
$25.000
|
$14.870
|
|
|
|
CONDT (PVC) (SCH 40) (2") (STL ENCSE)
|
LF
|
126.000
|
$45.000
|
$47.920
|
|
|
|
CONDT (PVC) (SCH 40) (3") (BORE)
|
LF
|
80.000
|
$30.000
|
$22.160
|
|
|
|
CONDT (PVC) (SCH 40) (3") (CONC ENCSE)
|
LF
|
27,328.000
|
$15.000
|
$16.000
|
|
|
|
CONDT (PVC) (SCH 40) (3") (STL ENCSE)
|
LF
|
2,740.000
|
$70.000
|
$29.410
|
|
|
|
CONDT (PVC) (SCH 40) (4")
|
LF
|
3,650.000
|
$15.000
|
$19.420
|
|
|
|
CONDT (PVC) (SCH 40) (4") (BORE)
|
LF
|
8,130.000
|
$40.000
|
$24.500
|
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
4,643.000
|
$20.000
|
$16.080
|
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
49,732.000
|
$1.800
|
$2.040
|
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
107,420.000
|
$1.800
|
$2.130
|
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
2,624.000
|
$1.800
|
$2.230
|
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
4,788.000
|
$1.800
|
$2.600
|
|
|
|
TRAY CABLE (4 CONDR) (12 AWG)
|
LF
|
7,145.000
|
$4.000
|
$3.890
|
|
|
|
GROUND BOX TY A (122311)
|
EA
|
17.000
|
$5,000.000
|
$850.000
|
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
139.000
|
$1,000.000
|
$1,145.000
|
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
72.000
|
$1,400.000
|
$1,295.000
|
|
|
|
REMOVE GROUND BOX
|
EA
|
13.000
|
$300.000
|
$100.000
|
|
|
|
ELC SRV TY A 240/480 060(NS)SS(E)TP(O)
|
EA
|
10.000
|
$5,400.000
|
$6,620.000
|
|
|
|
ELC SRV TY D 120/240 060(NS)SS(E)SP(O)
|
EA
|
7.000
|
$6,000.000
|
$5,320.000
|
|
|
|
ELC SRV TY D 120/240 100(NS)GS(N)GC(O)
|
EA
|
8.000
|
$6,000.000
|
$6,010.000
|
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
363.000
|
$30.020
|
$27.100
|
|
|
|
ALUMINUM SIGNS (TY O)
|
SF
|
8,216.000
|
$28.790
|
$21.300
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
122.000
|
$866.650
|
$600.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
|
EA
|
13.000
|
$928.530
|
$700.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
123.000
|
$940.330
|
$750.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
10.000
|
$1,000.600
|
$922.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
6.000
|
$999.710
|
$742.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
14.000
|
$1,000.000
|
$990.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
25.000
|
$1,170.870
|
$1,135.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
|
EA
|
1.000
|
$1,166.170
|
$1,274.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
|
EA
|
1.000
|
$1,216.080
|
$1,182.000
|
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
22.000
|
$2,510.760
|
$2,050.000
|
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
|
EA
|
1.000
|
$3,078.170
|
$2,105.000
|
|
|
|
IN SM RD SN SUP&AM (RAIL MOUNT)
|
EA
|
19.000
|
$5,739.760
|
$3,695.000
|
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
247.000
|
$157.730
|
$140.000
|
|
|
|
REMOVE BRDG MNT CLEARANCE SIGN ASSM
|
EA
|
22.000
|
$728.070
|
$1,017.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P-1EXT)
|
EA
|
23.000
|
$1,200.000
|
$875.000
|
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
375.000
|
$9.020
|
$6.600
|
|
|
|
REMOVE LRSA
|
EA
|
15.000
|
$1,366.390
|
$1,775.000
|
|
|
|
INS OH SN SUP(25 FT CANT)
|
EA
|
2.000
|
$28,870.950
|
$47,034.000
|
|
|
|
INS OH SN SUP(30 FT CANT)
|
EA
|
4.000
|
$25,471.300
|
$59,959.000
|
|
|
|
INS OH SN SUP(35 FT CANT)
|
EA
|
1.000
|
$31,666.740
|
$64,595.500
|
|
|
|
INS OH SN SUP(40 FT CANT)
|
EA
|
1.000
|
$48,024.650
|
$57,929.500
|
|
|
|
INS OH SN SUP(45 FT BRDG)
|
EA
|
1.000
|
$45,487.650
|
$60,447.500
|
|
|
|
INS OH SN SUP(55 FT BRDG)
|
EA
|
2.000
|
$43,525.140
|
$78,394.000
|
|
|
|
INS OH SN SUP(75 FT BRDG)
|
EA
|
1.000
|
$61,935.590
|
$85,935.000
|
|
|
|
INS OH SN SUP(80 FT BRDG)
|
EA
|
2.000
|
$70,582.060
|
$125,247.500
|
|
|
|
INS OH SN SUP(145 FT BRDG)
|
EA
|
2.000
|
$164,150.090
|
$194,793.500
|
|
|
|
INS OH SN SUP(165 FT BRDG)
|
EA
|
1.000
|
$235,950.000
|
$329,856.680
|
|
|
|
INS OH SN SUP(185 FT BRDG)
|
EA
|
2.000
|
$264,550.000
|
$285,862.000
|
|
|
|
REMOVE OVERHD SIGN SUP
|
EA
|
22.000
|
$6,945.440
|
$11,288.000
|
|
|
|
REMOVE OVERHD SIGN SUP (SIGN ONLY)
|
EA
|
3.000
|
$731.910
|
$1,755.000
|
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
367.000
|
$30.700
|
$25.000
|
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
|
EA
|
133.000
|
$24.050
|
$25.000
|
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
|
EA
|
100.000
|
$17.390
|
$25.000
|
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
1.000
|
$87.550
|
$90.000
|
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
100.000
|
$2.000
|
$25.000
|
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
6.000
|
$38.140
|
$37.500
|
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
|
EA
|
16.000
|
$90.600
|
$85.000
|
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(WFLX)SRF
|
EA
|
26.000
|
$107.720
|
$150.000
|
|
|
|
WK ZN PAV MRK REMOV (W)6"(BRK)
|
LF
|
67,850.000
|
$2.500
|
$1.850
|
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
404,670.000
|
$1.500
|
$1.250
|
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
6,350.000
|
$8.500
|
$12.000
|
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
315,330.000
|
$1.500
|
$1.250
|
|
|
|
REFL PAV MRK TY I (W)6"(DOT)(090MIL)
|
LF
|
4,527.000
|
$1.190
|
$1.900
|
|
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
16,884.000
|
$1.340
|
$1.650
|
|
|
|
PAVEMENT SEALER 6"
|
LF
|
219,678.000
|
$0.750
|
$0.210
|
|
|
|
PAVEMENT SEALER 8"
|
LF
|
15,811.000
|
$1.000
|
$0.320
|
|
|
|
PAVEMENT SEALER 12"
|
LF
|
15,055.000
|
$1.150
|
$1.100
|
|
|
|
PAVEMENT SEALER 24"
|
LF
|
3,478.000
|
$1.490
|
$1.700
|
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
21.000
|
$27.000
|
$28.000
|
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
40.000
|
$33.600
|
$35.000
|
|
|
|
PAVEMENT SEALER (UTURN ARROW)
|
EA
|
2.000
|
$42.000
|
$45.000
|
|
|
|
PAVEMENT SEALER (LNDP ARROW)
|
EA
|
2.000
|
$50.000
|
$55.000
|
|
|
|
PAVEMENT SEALER (YLD TRI)
|
EA
|
52.000
|
$23.060
|
$11.000
|
|
|
|
RE PROF PM TYI (BLK)6"(SHADOW)(090MIL)
|
LF
|
22,253.000
|
$0.800
|
$1.550
|
|
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(090MIL)
|
LF
|
37,892.000
|
$0.690
|
$0.930
|
|
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
|
LF
|
86,911.000
|
$0.750
|
$0.940
|
|
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
|
LF
|
83,837.000
|
$0.770
|
$0.940
|
|
|
|
REFL PAV MRK TY I (W)12"(DOT)(090MIL)
|
LF
|
9,508.000
|
$2.570
|
$3.500
|
|
|
|
PREFAB PAV MRK TY C (W) (12") (SLD)
|
LF
|
5,626.000
|
$8.350
|
$10.500
|
|
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
3,478.000
|
$17.850
|
$21.000
|
|
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
21.000
|
$255.930
|
$355.000
|
|
|
|
PREFAB PAV MRK TY C (W) (UTURN ARROW)
|
EA
|
2.000
|
$326.820
|
$450.000
|
|
|
|
PREFAB PAV MRK TY C (W) (LNDP ARROW)
|
EA
|
2.000
|
$429.000
|
$600.000
|
|
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
40.000
|
$199.000
|
$400.000
|
|
|
|
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
|
EA
|
60.000
|
$40.420
|
$65.000
|
|
|
|
PREFAB PAV MRK TY C (MULTI) (SHIELD)
|
EA
|
12.000
|
$1,500.000
|
$3,800.000
|
|
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
27,197.000
|
$7.240
|
$5.500
|
|
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
30,298.000
|
$6.070
|
$5.500
|
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
197,390.000
|
$0.400
|
$0.420
|
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
585,125.000
|
$0.360
|
$0.420
|
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
6,350.000
|
$2.370
|
$9.750
|
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
219,678.000
|
$0.450
|
$0.020
|
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
15,811.000
|
$1.130
|
$0.080
|
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
15,055.000
|
$2.000
|
$0.350
|
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
3,478.000
|
$33.000
|
$0.500
|
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
23.000
|
$75.000
|
$15.000
|
|
|
|
PAV SURF PREP FOR MRK (UTURN ARR)
|
EA
|
2.000
|
$75.000
|
$20.000
|
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
40.000
|
$135.000
|
$25.000
|
|
|
|
PAV SURF PREP FOR MRKS (SHIELD)
|
EA
|
12.000
|
$75.000
|
$55.000
|
|
|
|
INSTALL HWY TRF SIG (ISOLATED)
|
EA
|
7.000
|
$27,000.000
|
$34,236.210
|
|
|
|
REMOVING TRAFFIC SIGNALS
|
EA
|
6.000
|
$5,500.000
|
$7,000.000
|
|
|
|
TEMP TRAF SIGNALS
|
EA
|
6.000
|
$20,000.000
|
$69,384.580
|
|
|
|
VEH SIG SEC (12")LED(GRN)
|
EA
|
95.000
|
$250.000
|
$320.000
|
|
|
|
VEH SIG SEC (12")LED(GRN ARW)
|
EA
|
24.000
|
$250.000
|
$320.000
|
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
95.000
|
$250.000
|
$320.000
|
|
|
|
VEH SIG SEC (12")LED(YEL ARW)
|
EA
|
11.000
|
$250.000
|
$320.000
|
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
95.000
|
$250.000
|
$320.000
|
|
|
|
PED SIG SEC (LED)(COUNTDOWN)
|
EA
|
74.000
|
$600.000
|
$735.000
|
|
|
|
BACKPLATE W/REFL BRDR(3 SEC)ALUM
|
EA
|
68.000
|
$170.000
|
$168.000
|
|
|
|
BACKPLATE W/REFL BRDR(4 SEC)ALUM
|
EA
|
16.000
|
$210.000
|
$205.000
|
|
|
|
BACKPLATE W/REFL BRDR(5 SEC)ALUM
|
EA
|
11.000
|
$180.000
|
$263.000
|
|
|
|
TRF SIG CBL (TY A)(12 AWG)(2 CONDR)
|
LF
|
17,690.000
|
$2.000
|
$2.030
|
|
|
|
TRF SIG CBL (TY A)(12 AWG)(4 CONDR)
|
LF
|
18,060.000
|
$2.000
|
$2.470
|
|
|
|
TRF SIG CBL (TY A)(12 AWG)(5 CONDR)
|
LF
|
16,968.000
|
$4.500
|
$2.690
|
|
|
|
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
|
LF
|
7,741.000
|
$3.000
|
$4.130
|
|
|
|
INS TRF SIG PL AM(S)1 ARM(24')ILSN
|
EA
|
1.000
|
$12,000.000
|
$13,247.350
|
|
|
|
INS TRF SIG PL AM(S)1 ARM(24')LUM&ILSN
|
EA
|
1.000
|
$13,000.000
|
$15,171.110
|
|
|
|
INS TRF SIG PL AM(S)1 ARM(32')LUM&ILSN
|
EA
|
6.000
|
$13,000.000
|
$15,743.780
|
|
|
|
INS TRF SIG PL AM(S)1 ARM(36')ILSN
|
EA
|
4.000
|
$13,000.000
|
$14,261.120
|
|
|
|
INS TRF SIG PL AM(S)1 ARM(36')LUM&ILSN
|
EA
|
1.000
|
$14,000.000
|
$16,003.350
|
|
|
|
INS TRF SIG PL AM(S)1 ARM(40')ILSN
|
EA
|
3.000
|
$14,000.000
|
$15,280.210
|
|
|
|
INS TRF SIG PL AM(S)1 ARM(40')LUM&ILSN
|
EA
|
3.000
|
$16,500.000
|
$16,880.030
|
|
|
|
INS TRF SIG PL AM(S)1 ARM(44')LUM&ILSN
|
EA
|
3.000
|
$15,000.000
|
$17,160.810
|
|
|
|
INS TRF SIG PL AM(S)1 ARM(50')LUM&ILSN
|
EA
|
1.000
|
$42,000.000
|
$33,647.620
|
|
|
|
IN TRF SG PL AM(S)2ARM(32-24')LUM&ILSN
|
EA
|
1.000
|
$15,000.000
|
$18,345.110
|
|
|
|
INS TRF SIG PL AM(S)2 ARM(36-36')ILSN
|
EA
|
1.000
|
$16,500.000
|
$18,792.610
|
|
|
|
IN TRF SG PL AM(S)2ARM(40-24')LUM&ILSN
|
EA
|
1.000
|
$16,000.000
|
$19,519.740
|
|
|
|
IN TRF SG PL AM(S)2ARM(40-36')LUM&ILSN
|
EA
|
2.000
|
$17,000.000
|
$20,843.850
|
|
|
|
IN TRF SG PL AM(S)2ARM(44-36')LUM&ILSN
|
EA
|
3.000
|
$23,000.000
|
$21,408.970
|
|
|
|
PED POLE ASSEMBLY
|
EA
|
48.000
|
$2,000.000
|
$1,445.000
|
|
|
|
PED DETECT PUSH BUTTON (APS)
|
EA
|
74.000
|
$1,300.000
|
$765.000
|
|
|
|
PED DETECTOR CONTROLLER UNIT
|
EA
|
7.000
|
$3,500.000
|
$3,200.000
|
|
|
|
REMOVAL OF GROUND BOXES
|
EA
|
50.000
|
$400.000
|
$100.000
|
|
|
|
REMOVAL OF CONTROL CABINET(GRND MNT)
|
EA
|
6.000
|
$850.000
|
$500.000
|
|
|
|
POTHOLE REPAIR (STANDARD)
|
SY
|
2,000.000
|
$110.000
|
$128.000
|
|
|
|
FULL - WIDTH MOWING
|
CYC
|
20.000
|
$4,200.000
|
$3,500.000
|
|
|
|
LITTER REMOVAL
|
CYC
|
48.000
|
$1,850.000
|
$3,600.000
|
|
|
|
DEBRIS REMOVAL (CNTR MEDIANS/MAINLANES)
|
CYC
|
48.000
|
$2,450.000
|
$4,200.000
|
|
|
|
CLEANING / SWEEPING (CENTER MEDIAN)
|
CYC
|
48.000
|
$2,750.000
|
$3,400.000
|
|
|
|
CLEANING / SWEEPING (OUTSIDE MAIN LANE)
|
CYC
|
48.000
|
$2,380.000
|
$3,400.000
|
|
|
|
CLEANING / SWEEPING (FRONTAGE ROAD)
|
CYC
|
48.000
|
$4,000.000
|
$2,700.000
|
|
|
|
ANTI - GRAFFITI COATNG(PERMNENT-TY III)
|
SF
|
30,553.000
|
$3.000
|
$1.000
|
|
|
|
TACK COAT
|
GAL
|
20,515.000
|
$5.000
|
$4.000
|
|
|
|
D-GR HMA TY-D PG 64-22 (EXEMPT)
|
TON
|
11,283.000
|
$115.000
|
$144.000
|
|
|
|
SOIL DENS.AND RAISING CONC.SLABS(HDPF)
|
LB
|
10,000.000
|
$7.000
|
$10.000
|
|
|
|
TIP TESTING(DRILL SHAFT)
|
EA
|
198.000
|
$4,000.000
|
$6,500.000
|
|
|
|
NOISE WALL
|
SF
|
2,750.000
|
$55.000
|
$250.000
|
|
|
|
THERMOPLASTIC PIPE (PP) (18")
|
LF
|
11,266.000
|
$75.000
|
$0.000
|
|
|
|
THERMOPLASTIC PIPE (PP) (24")
|
LF
|
3,769.900
|
$90.000
|
$0.000
|
|
|
|
THERMOPLASTIC PIPE (PP) (30")
|
LF
|
2,390.000
|
$110.000
|
$0.000
|
|
|
|
THERMOPLASTIC PIPE (PP) (36")
|
LF
|
665.000
|
$125.000
|
$0.000
|
|
|
|
THERMOPLASTIC PIPE (PP) (42")
|
LF
|
1,032.000
|
$175.000
|
$0.000
|
|
|
|
THERMOPLASTIC PIPE (PP) (48")
|
LF
|
50.000
|
$200.000
|
$0.000
|
|
|
|
GEOGRID REINFORCE EMBANKMENTS (TY B)
|
SY
|
37,108.000
|
$2.500
|
$3.000
|
|
|
|
GEOGRID BASE REINFORCEMENT (TY I)
|
SY
|
7,067.000
|
$5.250
|
$3.000
|
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
6.000
|
$8,500.000
|
$1,000.000
|
|
|
|
FIBER OPTIC PATCH PANEL (12 POSITION)
|
EA
|
8.000
|
$1,300.000
|
$1,555.000
|
|
|
|
FO CBL (12 SMF)
|
LF
|
20,079.000
|
$20.000
|
$8.400
|
|
|
|
CCTV FIELD EQUIPMENT (DIGITAL)
|
EA
|
5.000
|
$8,000.000
|
$9,200.000
|
|
|
|
ITS MULTI-DUCT CND (PVC-40)(CONC ENCSE)
|
LF
|
27,328.000
|
$25.000
|
$23.320
|
|
|
|
ITS MULTI-DUCT CND (PVC-40)(STL ENCSE)
|
LF
|
2,740.000
|
$65.000
|
$38.920
|
|
|
|
INSTALL DMS (POLE MTD CABINET)
|
EA
|
3.000
|
$20,000.000
|
$14,027.000
|
|
|
|
ITS RADIO (DUAL)(5 GHZ/5 GHZ)-I-U
|
EA
|
8.000
|
$3,000.000
|
$5,175.000
|
|
|
|
ITS POLE (60 FT)(110 MPH)
|
EA
|
8.000
|
$17,500.000
|
$23,197.870
|
|
|
|
ITS POLE MNT CAB (TY 2)(CONF 2)
|
EA
|
5.000
|
$7,000.000
|
$7,305.000
|
|
|
|
ETHERNET SWITCH (INSTALL ONLY)
|
EA
|
5.000
|
$750.000
|
$755.000
|
|
|
|
TMA (STATIONARY)
|
DAY
|
320.000
|
$210.000
|
$365.000
|
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
420.000
|
$540.000
|
$107.000
|
|
|
|
ITS GND BOX(PCAST) TY 1 (243636)W/APRN
|
EA
|
52.000
|
$4,000.000
|
$5,505.000
|
|
|
|
TEMP Q-DETECT SYS
|
EA
|
3.000
|
$145,000.000
|
$95,000.000
|
|
|
|
TEMP Q-DETECT SYS (RELOCATE)
|
EA
|
15.000
|
$1,800.000
|
$1,650.000
|
|
|
|
ITS RVSD (DATA COLLECT ONLY) SYS
|
EA
|
5.000
|
$8,500.000
|
$14,335.000
|
|
|
|
VIVDS PROSR SYS
|
EA
|
7.000
|
$11,500.000
|
$12,925.000
|
|
|
|
VIVDS CAM ASSY VAR LNS
|
EA
|
39.000
|
$3,100.000
|
$3,150.000
|
|
|
|
VIVDS CNTRL SOFTWARE
|
EA
|
7.000
|
$800.000
|
$445.000
|
|
|
|
VIVDS CABLING
|
LF
|
9,900.000
|
$4.500
|
$2.940
|
|
|
|
TEMP SPEED MONITOR SYS
|
EA
|
3.000
|
$20,550.000
|
$20,000.000
|
|
|
|
TEMP CON EQUIP ALERT SYS
|
EA
|
3.000
|
$28,110.000
|
$52,000.000
|
|
|
|
TEMP TRAVEL TIME SYS
|
EA
|
3.000
|
$44,610.000
|
$65,000.000
|
|
|
|
TEMP INCIDENT DETECT & SURVEIL SYS
|
EA
|
2.000
|
$85,350.000
|
$75,000.000
|
|
|
|
INSTALL CELLULAR ROUTER
|
EA
|
8.000
|
$100.000
|
$500.000
|
|
1
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
11,266.000
|
$75.000
|
$183.510
|
|
2
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
3,769.900
|
$90.000
|
$203.430
|
|
3
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
2,390.000
|
$110.000
|
$232.860
|
|
4
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
665.000
|
$125.000
|
$289.650
|
|
5
|
|
RC PIPE (CL III)(42 IN)
|
LF
|
1,032.000
|
$175.000
|
$364.010
|
|
6
|
|
RC PIPE (CL III)(48 IN)
|
LF
|
50.000
|
$200.000
|
$413.130
|
|
Totals: |
$447,117,263.129
|