JEFFERSON US 90 (0028-07-059)

Items: 75

County: JEFFERSON
Length: 3.7500 MILES
Highway: US 90
District: BEAUMONT
Control Number: 0028-07-059
DBE Goal: 5.0%
Project: BR 2025(842)
Guaranty: $100,000.00
Time: 207 WORKING DAYS
Engineer's Estimate: $7,462,307.59
Date: 07/01/2025 (11 months ago)
Contract Number: 7253007
Type: BRIDGE MAINTENANCE
Project ID: A00197100
Contract Type: Federal
Project Description: US 90 @ HILLEBRANDT BAYOU (DECK REPAIR / REHABILITATION) STR#20-124-0-0028-07-044
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
BRYCE BROUSSARD
JAMES GRISSON
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (9)
E
Engineer's Estimate
$7,462,307.59
$5,167,739.54
Over/Under Est: -30.75% -$2,294,568.05
Over/Under Est: -19.91% -$1,485,579.60
Amt Left: 15.65% $808,988.45
Over/Under Est: -19.61% -$1,463,567.49
Amt Left: 16.08% $831,000.56
Delta: -0.37% -$22,012.11
Over/Under Est: -11.73% -$875,625.34
Amt Left: 27.46% $1,418,942.71
Delta: -9.80% -$587,942.15
Over/Under Est: -1.23% -$91,749.30
Amt Left: 42.63% $2,202,818.75
Delta: -11.90% -$783,876.04
$7,896,984.00
Over/Under Est: 5.82% $434,676.41
Amt Left: 52.81% $2,729,244.46
Delta: -7.14% -$526,425.71
Over/Under Est: 13.74% $1,025,585.86
Amt Left: 64.25% $3,320,153.91
Delta: -7.48% -$590,909.45
Over/Under Est: 29.53% $2,203,941.41
Amt Left: 87.05% $4,498,509.46
Delta: -13.88% -$1,178,355.55
Over/Under Est: 37.25% $2,779,598.66
Amt Left: 98.19% $5,074,166.71
Delta: -5.96% -$575,657.25
Subcontractor Percentage Amount
TRAFFIC SIGNS & LINES, LLC 7.44% $390,724.22
SELECT MAINTENANCE, L.L.C. 2.24% $117,637.40
SUPERIOR GROUTING SERVICES, INC. 1.19% $62,494.87
PENHALL COMPANY 0.81% $42,538.52
TEXOP CONSTRUCTION 0.22% $11,553.67
HAZMAT INTERNATIONAL, INC. 0.07% $3,676.17
Total: 11.97% $628,624.85

Bid Items & Bid Tabulations

75 Total 0 of 75
JEFFERSON  |  US 90  |  BEAUMONT  |  0028-07-059  |  07/01/2025  |  $7,462,307.59  |  BR 2025(842)  |  BRIDGE MAINT  |  207 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
RAGLE CONSTRUCTION, INC.
STRUCTURAL INTEGRITY GROUP LLC
GIBSON & ASSOCIATES, INC.
FORDE CONSTRUCTION COMPANY, INC.
MB WESTERN INDUSTRIAL CONTRACTING CO.
ICOS MANAGEMENT, LLC
SOUTHERN ROAD & BRIDGE, LLC
GREY SKY CONSTRUCTION LLC
BUILT RIGHT CONSTRUCTION OF OKLAHOMA, LLC
D-GR HMA TY-D SAC-A PG64-22
TON 210.000 $350.000 $400.000 $835.000 $477.250 $317.000 $980.000 $600.000 $365.000 $1,000.000 $850.000
TACK COAT
GAL 192.000 $10.000 $20.000 $32.000 $8.630 $5.000 $33.200 $200.000 $20.000 $50.000 $32.000
PLANE & TEXT ASPH CONC PAV(2")
SY 1,912.000 $10.000 $12.000 $51.500 $22.430 $19.500 $58.200 $5.000 $20.000 $50.000 $30.000
STRUCT EXCAV
CY 93.000 $40.000 $45.000 $220.000 $132.000 $297.000 $30.000 $100.000 $95.000 $250.000 $25.000
CEM STABIL BKFL
CY 178.000 $200.000 $100.000 $235.000 $256.300 $235.000 $350.000 $300.000 $150.000 $350.000 $500.000
CL C CONC(PILE ENCASEMENT)
LF 50.000 $800.000 $350.000 $1,140.000 $940.500 $895.000 $1,500.000 $4,000.000 $3,100.000 $6,500.000 $1,500.000
CL A CONC (CHANNEL LINING)
CY 17.000 $1,000.000 $1,050.000 $1,140.000 $880.000 $2,200.000 $900.000 $1,200.000 $685.000 $3,200.000 $750.000
PENETRATING CONCRETE SURFACE TREATMENT
SY 103,979.000 $15.000 $4.350 $9.000 $8.500 $8.000 $8.600 $4.000 $9.250 $12.000 $17.000
CONC STR REPAIR(CLEAN & COAT WTH EPOXY)
SF 142.000 $205.000 $175.000 $300.000 $165.000 $281.000 $175.000 $300.000 $29.000 $500.000 $325.000
CONC STR REPAIR(DECK REP(PART DEPTH))
SF 663.000 $230.000 $50.000 $91.000 $112.000 $338.000 $150.000 $350.000 $505.000 $650.000 $325.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 455.000 $260.000 $125.000 $260.000 $209.000 $315.000 $200.000 $300.000 $605.000 $500.000 $275.000
RIPRAP (STONE COMMON)(GROUT)(12 IN)
CY 177.000 $800.000 $250.000 $475.000 $390.500 $403.000 $300.000 $400.000 $505.000 $185.000 $400.000
CLEANING AND SEALING EXIST JOINTS (CL3)
LF 764.000 $80.000 $42.500 $30.000 $16.500 $21.000 $75.000 $80.000 $105.000 $80.000 $65.000
CLEANING AND SEALING EXIST JOINTS (CL7)
LF 4,631.000 $80.000 $35.000 $35.000 $36.300 $28.000 $65.000 $80.000 $105.000 $80.000 $65.000
POLYESTER POLYMER CONC OVERLAY (3/4")
SY 13,200.000 $150.000 $170.000 $119.000 $99.000 $107.000 $131.440 $120.000 $135.000 $120.000 $155.000
DIAMOND GRINDING SLAB
SY 139.000 $100.000 $100.000 $45.000 $75.000 $200.000 $55.000 $60.000 $212.000 $100.000 $1.000
MOBILIZATION
LS 1.000 $600,000.000 $510,000.000 $611,000.000 $791,000.000 $615,000.000 $700,000.000 $950,000.000 $650,000.000 $800,000.000 $1,000,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 14.000 $15,000.000 $33,850.000 $17,250.000 $32,100.000 $16,000.000 $7,005.000 $10,000.000 $12,500.000 $15,000.000 $6,500.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 6.000 $3,000.000 $18,000.000 $10,000.000 $14,800.000 $5,000.000 $5,000.000 $24,000.000 $8,500.000 $20,000.000 $5,000.000
TMA (STATIONARY)
DAY 214.000 $85.000 $100.000 $250.000 $360.000 $200.000 $200.000 $1.000 $125.000 $250.000 $300.000
TMA (MOBILE OPERATION)
DAY 46.000 $500.000 $150.000 $1,200.000 $100.000 $200.000 $200.000 $1.000 $265.000 $550.000 $350.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 493.000 $60.000 $35.000 $50.000 $55.000 $42.000 $30.000 $1.000 $6.000 $30.000 $65.000
ROCK FILTER DAMS (REMOVE)
LF 493.000 $15.000 $20.000 $30.000 $22.000 $10.000 $10.000 $1.000 $6.000 $20.000 $27.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 24.000 $10.000 $10.000 $15.000 $16.500 $10.000 $20.000 $1.000 $48.000 $12.000 $20.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 24.000 $2.000 $1.000 $5.000 $3.300 $1.000 $10.000 $1.000 $22.000 $5.000 $4.000
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 18,450.000 $35.000 $1.000 $41.500 $29.000 $72.000 $76.000 $70.000 $76.000 $90.000 $115.000
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 18,420.000 $4.750 $3.250 $3.500 $8.750 $7.000 $15.000 $20.000 $20.000 $20.000 $30.000
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 18,450.000 $17.000 $8.500 $4.000 $20.000 $19.000 $20.000 $10.000 $20.000 $30.000 $30.000
GUARDRAIL END TREATMENT (INSTALL)
EA 1.000 $8,500.000 $5,000.000 $6,250.000 $5,277.800 $3,500.000 $5,901.000 $6,000.000 $6,500.000 $3,250.000 $6,500.000
GUARDRAIL END TREATMENT (REMOVE)
EA 1.000 $750.000 $400.000 $1,100.000 $935.000 $395.000 $1,045.000 $3,500.000 $1,150.000 $1,500.000 $1,200.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 4.000 $5,000.000 $950.000 $1,725.000 $2,000.000 $1,800.000 $3,940.000 $5,000.000 $3,850.000 $6,500.000 $4,000.000
CRASH CUSH ATTEN (REMOVE)
EA 4.000 $3,000.000 $1,075.000 $1,725.000 $1,500.000 $960.000 $2,215.000 $2,000.000 $2,250.000 $2,500.000 $2,500.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 4.000 $5,000.000 $7,250.000 $15,000.000 $10,000.000 $9,500.000 $11,162.000 $21,000.000 $11,000.000 $21,000.000 $12,000.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB
EA 190.000 $15.000 $25.000 $21.500 $20.900 $6.000 $23.500 $10.000 $22.000 $100.000 $30.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF1
EA 2.000 $20.000 $25.000 $33.250 $31.900 $25.000 $35.700 $200.000 $33.000 $100.000 $40.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB
EA 78.000 $17.000 $25.000 $22.000 $20.900 $6.000 $23.400 $10.000 $22.000 $100.000 $30.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB (BI)
EA 52.000 $16.300 $25.000 $22.000 $20.900 $35.000 $23.400 $10.000 $22.000 $100.000 $30.000
INSTL OM ASSM (OM-3L)(TWT)GND
EA 4.000 $200.000 $50.000 $300.000 $286.000 $290.000 $320.000 $500.000 $300.000 $100.000 $325.000
INSTL OM ASSM (OM-3R)(TWT)GND
EA 4.000 $200.000 $50.000 $300.000 $286.000 $310.000 $320.000 $500.000 $300.000 $100.000 $325.000
WK ZN PAV MRK REMOV (REFL) TY II-C-R
EA 1,052.000 $6.000 $4.450 $3.500 $3.850 $4.000 $4.500 $10.000 $5.000 $6.000 $4.200
WK ZN PAV MRK REMOV (W)6"(BRK)
LF 16,360.000 $2.750 $1.050 $1.400 $1.540 $1.500 $1.750 $4.000 $2.000 $1.000 $2.000
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 75,243.000 $1.290 $1.250 $0.750 $0.830 $0.850 $0.950 $2.000 $1.000 $1.000 $1.000
WK ZN PAV MRK REMOV (W)8"(DOT)
LF 413.000 $5.000 $4.850 $2.000 $2.200 $2.200 $2.460 $30.000 $3.000 $6.000 $2.500
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 5,282.000 $1.050 $1.850 $1.400 $1.540 $1.600 $1.720 $4.000 $2.000 $6.000 $2.000
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 73,432.000 $1.290 $1.250 $0.750 $0.830 $0.900 $0.920 $1.000 $1.000 $1.000 $1.100
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 61.000 $25.000 $1.000 $1.250 $10.000 $1.400 $1.540 $20.000 $2.000 $6.000 $1.250
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 26.000 $25.000 $1.000 $1.250 $10.000 $1.400 $1.540 $20.000 $2.000 $6.000 $1.250
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 5,152.000 $1.500 $1.850 $1.450 $1.600 $1.600 $1.780 $5.000 $2.000 $3.000 $2.000
RE PV MRK TY I(BLACK)6"(SHADOW)(090MIL)
LF 20,540.000 $0.750 $0.850 $1.100 $1.210 $1.200 $1.350 $4.000 $2.000 $1.000 $1.500
PAVEMENT SLER 6"
LF 120,489.000 $0.750 $0.190 $0.350 $0.390 $0.400 $0.430 $1.000 $1.000 $0.500 $0.600
PAVEMENT SLER 8"
LF 5,252.000 $5.000 $0.280 $0.600 $0.660 $0.650 $0.740 $1.000 $1.000 $5.000 $1.000
REFL PAV MRK TY I (W)6"(BRK)(090MIL)
LF 20,350.000 $1.000 $0.740 $0.950 $1.050 $1.050 $1.170 $3.000 $2.000 $1.000 $1.300
REFL PAV MRK TY I (W)6"(SLD)(090MIL)
LF 38,268.000 $1.000 $0.680 $0.750 $0.830 $0.850 $0.920 $3.000 $1.000 $1.000 $1.100
REFL PAV MRK TY I (Y)6"(SLD)(090MIL)
LF 40,661.000 $1.000 $0.680 $0.750 $0.830 $0.850 $0.920 $3.000 $1.000 $1.000 $1.100
PREFAB PM TY C (W)(6")(BRK)
LF 190.000 $10.000 $4.750 $5.250 $5.780 $6.000 $6.460 $30.000 $9.000 $1.000 $7.000
PREFAB PM TY C (W)(8")(SLD)
LF 100.000 $11.000 $5.460 $7.500 $8.250 $8.500 $9.230 $30.000 $10.000 $6.000 $9.000
PREFAB PM TY C (Y)(6")(BRK)
LF 60.000 $10.000 $5.750 $5.500 $6.050 $6.100 $6.770 $30.000 $10.000 $1.000 $7.000
PREFAB PM TY C (Y)(6")(SLD)
LF 420.000 $7.500 $5.380 $5.500 $6.050 $6.100 $6.770 $30.000 $10.000 $1.000 $7.000
REFL PAV MRKR TY I-C
EA 11.000 $60.000 $7.000 $6.000 $6.600 $7.000 $7.380 $50.000 $10.000 $6.000 $9.000
REFL PAV MRKR TY II-A-A
EA 4.000 $9.000 $7.000 $6.000 $6.600 $7.000 $7.380 $50.000 $10.000 $6.000 $9.000
REFL PAV MRKR TY II-C-R
EA 1,276.000 $6.000 $7.000 $5.000 $5.500 $6.000 $6.150 $10.000 $10.000 $6.000 $7.000
ELIM EXT PM & MRKS (6")
LF 129,202.000 $0.520 $0.280 $0.320 $0.350 $0.500 $0.390 $0.750 $1.000 $0.500 $0.500
ELIM EXT PM & MRKS (8")
LF 11,677.000 $1.000 $0.760 $0.650 $0.720 $0.750 $0.800 $1.000 $1.000 $1.000 $1.000
PAV SURF PREP FOR MRK (6")
LF 120,489.000 $0.150 $0.020 $0.060 $0.070 $0.080 $0.070 $0.500 $0.300 $0.500 $0.100
PAV SURF PREP FOR MRK (8")
LF 5,252.000 $0.500 $0.070 $0.080 $0.090 $0.090 $0.100 $1.000 $0.500 $3.000 $0.100
REPLACE HAND HOLE COVER
EA 2.000 $250.000 $1,850.000 $800.000 $1,500.000 $2,000.000 $150.000 $1,000.000 $1,500.000 $1,500.000 $600.000
DRAIN INLET CLEANING
EA 30.000 $280.000 $440.000 $100.000 $192.500 $235.000 $50.000 $1,000.000 $1,150.000 $2,500.000 $110.000
REPAIR OF TERMINAL ANCHORS POSTS
EA 2.000 $200.000 $1,000.000 $500.000 $1,100.000 $1,100.000 $100.000 $2,000.000 $1,515.000 $1,500.000 $750.000
REPAIR (STEEL RAIL)
LF 10.000 $500.000 $250.000 $350.000 $861.000 $1,300.000 $100.000 $1,000.000 $2,200.000 $100.000 $400.000
CONCRETE RAIL REPAIR (IN-KIND)
LF 51.000 $500.000 $325.000 $1,050.000 $319.000 $600.000 $350.000 $400.000 $125.000 $350.000 $325.000
CNC CRACK REPAIR (DISCRETE)(GRAVITY)
LF 694.000 $60.000 $25.000 $35.000 $24.200 $42.000 $80.000 $80.000 $144.000 $100.000 $35.000
CARBON FIBER REINF POLYMER PROTECTION
SF 234.000 $200.000 $125.000 $108.000 $49.500 $105.000 $150.000 $300.000 $228.000 $100.000 $100.000
FILTER FABRIC
SY 459.000 $20.000 $5.000 $11.000 $20.000 $2.000 $10.000 $15.000 $11.000 $15.000 $4.000
INSTALL BRIDGE IDENTIFICATION NUMBERS
EA 6.000 $750.000 $500.000 $125.000 $1,000.000 $1,400.000 $1,000.000 $500.000 $500.000 $1,500.000 $350.000
BENT CAP/ABUTMENT CAP CLEANING
EA 15.000 $5,000.000 $775.000 $900.000 $1,320.000 $4,200.000 $1,200.000 $2,000.000 $3,350.000 $5,000.000 $750.000
Totals: $7,462,307.590 $5,167,739.540 $5,976,727.990 $5,998,740.100 $6,586,682.250 $7,370,558.290 $7,896,984.000 $8,487,893.450 $9,666,249.000 $10,241,906.250
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (PART) $150,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $10,000.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $5,000.00
Total: $165,000.00