Show Job Controls
Bid Cobra

JASPER US0069 (6359-49-001)

Items: 69

County: JASPER
Length: N/A
Highway: US0069
District: BEAUMONT
Control Number: 6359-49-001
DBE Goal: N/A
Project: RMC - 635949001
Guaranty: N/A
Time: 365 CALENDAR DAYS
Engineer's Estimate: $556,520.00
Date: 06/04/2020 (6 years ago)
Contract Number: N/A
Type: METAL BEAM GUARD FENCE REPAIRS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (1)
E
Engineer's Estimate
$556,520.00
$525,580.00
Over/Under Est: -5.56% -$30,940.00

Bid Items & Bid Tabulations

69 Total 0 of 69
JASPER  |  US0069  |  BEAUMONT  |  6359-49-001  |  06/04/2020  |  $556,520.00  |  RMC - 635949001  |  METAL BEAM GUARD FENCE REPAIRS  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ELITE CASTLE RESOURCES LLC
REMOVING CONC (RIPRAP)
SY 5.000 $100.000 $50.000
CONC STR REPR(REMOV AND REPL WINGWALL)
CY 2.000 $3,000.000 $800.000
RIPRAP (MOW STRIP)(4 IN)
CY 1.000 $1,200.000 $800.000
RETROFIT RAIL (TY T131RC)
LF 150.000 $250.000 $85.000
MOBILIZATION (CALLOUT)
EA 60.000 $800.000 $500.000
MOBILIZATION (EMERGENCY)
EA 1.000 $3,250.000 $1,000.000
MTL W-BEAM GD FEN (TIM POST)
LF 10.000 $30.000 $35.000
MTL THRIE-BEAM GD FEN (TIM POST)
LF 5.000 $90.000 $80.000
TERMINAL ANCHOR SECTION
EA 5.000 $450.000 $50.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 1.000 $2,250.000 $2,500.000
MTL BEAM GD FEN TRANS (TL2)
EA 2.000 $1,250.000 $800.000
MTL BEAM GD FEN TRANS (T101)
EA 1.000 $1,300.000 $800.000
MTL W-BEAM GD FEN ADJUSTMENT
LF 1.000 $100.000 $10.000
MTL THRIE-BEAM GD FEN ADJUSTMENT
LF 1.000 $150.000 $150.000
TERMINAL ANCHOR SECTION ADJUSTMENT
EA 1.000 $225.000 $150.000
TRANSITION ADJUSTMENT
EA 2.000 $300.000 $150.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $2,000.000 $1,800.000
MTL BM GD FEN (LONG SPAN SYSTEM)
LF 5.000 $60.000 $85.000
REMOVE METAL BEAM GUARD FENCE
LF 50.000 $10.000 $40.000
REMOVE TERMINAL ANCHOR SECTION
EA 5.000 $300.000 $1.000
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $2,500.000 $4,100.000
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000 $675.000 $250.000
CRASH CUSH ATTEN (DES SOURCE)
EA 1.000 $10,000.000 $2,500.000
CRASH CUSH ATTEN (REMOVE)
EA 1.000 $2,000.000 $100.000
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND
EA 2.000 $40.000 $100.000
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND(BI)
EA 1.000 $40.000 $100.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
EA 5.000 $30.000 $100.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 5.000 $30.000 $100.000
INSTL DEL ASSM (D-SY)SZ (BRF)GF1
EA 5.000 $35.000 $100.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 10.000 $40.000 $100.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 5,000.000 $20.000 $20.000
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 1.000 $100.000 $300.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 10.000 $200.000 $5.000
REPAIR RAIL ELEMENT (CURVED RAIL)
LF 10.000 $100.000 $15.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 100.000 $65.000 $50.000
REM / REPL TIMBER / STL POST W/CONC FND
EA 50.000 $100.000 $50.000
REM / REPL STEEL POST W / CONC FND
EA 5.000 $125.000 $100.000
REPAIR STEEL POST WITH BASE PLATE
EA 8.000 $300.000 $150.000
REALIGN POSTS
EA 125.000 $25.000 $1.000
REMOVE & REPLACE BLOCKOUT
EA 200.000 $30.000 $20.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 1,000.000 $30.000 $30.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 175.000 $90.000 $1.000
REPAIR OF TERMINAL ANCHORS POSTS
EA 5.000 $100.000 $250.000
REPLACE TERMINAL ANCHOR POSTS
EA 5.000 $200.000 $250.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 15.000 $3,200.000 $3,000.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 30.000 $1,000.000 $1,000.000
REM & RESET SGT IMPACT HEAD
EA 10.000 $300.000 $250.000
REPLACE SGT CABLE ASSEMBLY
EA 30.000 $100.000 $50.000
REPLACE SGT STRUT
EA 30.000 $100.000 $50.000
REPLACE SGT OBJECT MARKER
EA 20.000 $35.000 $1.000
REPAIR STEEL POST WITH BASE PLATE
EA 1.000 $300.000 $250.000
REPAIR (CATGR - FRONT SECTION)
EA 1.000 $5,000.000 $3,500.000
REPAIR (CATGR - END SECTION)
EA 1.000 $2,500.000 $1,500.000
REPAIR (QUAD) (N) (BAY)
EA 5.000 $1,500.000 $1,350.000
REPAIR (QUAD) (W) (BAY)
EA 1.000 $3,000.000 $1,500.000
REPAIR REACT (CYLINDERS)
EA 5.000 $3,500.000 $1,500.000
REPAIR REACT (W) (CYLINDERS)
EA 1.000 $3,500.000 $1,000.000
REMOVE AND REPLACE (SMTC) (N)
EA 1.000 $20,000.000 $28,000.000
REPAIR (SMTC) (N)
EA 1.000 $2,000.000 $3,500.000
REMOVE AND REPLACE (SMTC) (W)
EA 1.000 $20,000.000 $27,500.000
REPAIR (SMTC) (W)
EA 1.000 $2,000.000 $3,500.000
REPAIR (TRACC) (BAY)
EA 5.000 $2,500.000 $1,500.000
REPAIR (WIDE TRACC) (BAY)
EA 1.000 $2,500.000 $1,500.000
REMOVE AND REPLACE (QUADGUARD)(MASH)(N)
EA 1.000 $20,000.000 $18,000.000
REPAIR (QUADGUARD)(MASH)(N)(BAY)
EA 1.000 $3,000.000 $2,200.000
REMOVE AND REPLACE (TAU)(MASH)(N)
EA 1.000 $20,000.000 $18,000.000
REPAIR (TAU)(MASH)(N)(BAY)
EA 1.000 $3,000.000 $1,500.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 1.000 $300.000 $2,320.000
TMA (STATIONARY)
DAY 60.000 $300.000 $1,500.000
Totals: $556,520.000 $525,580.000