Show Job Controls
Bid Cobra

JASPER SH0063 (6335-54-001)

Items: 31

County: JASPER
Length: N/A
Highway: SH0063
District: BEAUMONT
Control Number: 6335-54-001
DBE Goal: N/A
Project: RMC - 633554001
Guaranty: N/A
Time: 15 W
Engineer's Estimate: $605,817.16
Date: 01/09/2019 (7 years ago)
Contract Number: N/A
Type: MILL & INLAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$605,817.16
Over/Under Est: -5.88% -$35,611.94
Over/Under Est: 3.63% $21,980.74
Amt Left: 10.1% $57,592.68

Bid Items & Bid Tabulations

31 Total 0 of 31
JASPER  |  SH0063  |  BEAUMONT  |  6335-54-001  |  01/09/2019  |  $605,817.16  |  RMC - 633554001  |  MILL & INLAY  |  15 W
Item Code
Description
Unit
Quantity
Engineer's Estimate
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.
TEXAS MATERIALS GROUP, INC.
REMOVING STAB BASE AND ASPH PAV (6")
SY 307.000 $30.000 $30.000 $85.000
BACKFILL (TY B)
STA 3.740 $65.000 $800.000 $850.000
D-GR HMA(SQ) TY-C SAC-A PG76-22
TON 3,385.000 $110.000 $113.500 $125.000
PLANE ASPH CONC PAV(0" TO 2")
SY 866.000 $4.000 $4.000 $2.300
PLANE ASPH CONC PAV (4")
SY 13,203.000 $5.000 $3.850 $4.300
RIPRAP (MOW STRIP)(4 IN)
CY 34.000 $600.000 $650.000 $425.000
MOBILIZATION
LS 1.000 $46,326.110 $42,000.000 $42,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 2.000 $3,500.000 $2,500.000 $2,000.000
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 5,308.000 $0.400 $1.000 $1.500
MTL W-BEAM GD FEN (TIM POST)
LF 400.000 $50.000 $22.000 $23.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $3,000.000 $1,720.000 $1,400.000
REMOVE METAL BEAM GUARD FENCE
LF 400.000 $10.000 $3.100 $2.500
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 4.000 $500.000 $380.000 $235.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $4,000.000 $2,750.000 $2,400.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $500.000 $380.000 $235.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 12.000 $10.000 $20.000 $28.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 24.000 $1.750 $1.000 $2.500
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 681.000 $1.750 $1.000 $2.500
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 334.000 $1.000 $0.800 $0.800
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 12,282.000 $0.400 $0.410 $0.500
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
LF 1,370.000 $0.400 $0.450 $0.500
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 5,853.000 $0.400 $0.450 $0.500
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 12.000 $15.000 $15.000 $15.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 2.000 $200.000 $200.000 $200.000
PREFAB PAV MRK TY C (W) (WORD)
EA 4.000 $375.000 $250.000 $250.000
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 6.000 $60.000 $50.000 $50.000
REFL PAV MRKR TY I-C
EA 20.000 $4.000 $4.000 $48.000
REFL PAV MRKR TY II-A-A
EA 144.000 $4.000 $3.500 $3.500
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
LF 80.000 $20.000 $8.500 $8.500
TMA (STATIONARY)
EA 1.000 $7,500.000 $1,000.000 $4,300.000
TMA (MOBILE OPERATION)
HR 20.000 $50.000 $25.000 $25.000
Totals: $605,817.160 $570,205.220 $627,797.900