JASPER FM 777 (1109-01-026)

Items: 95

County: JASPER
Length: N/A
Highway: FM 777
District: BEAUMONT
Control Number: 1109-01-026
DBE Goal: 650.0%
Project: BR 2024(854)
Guaranty: N/A
Time: 147 WORKING DAYS
Engineer's Estimate: $9,971,562.14
Date: 04/05/2024 (2 years ago)
Contract Number: N/A
Type: SURFACING/ROADWAY RESTORATION
Mail/Deliver Bids To: N/A
BRYCE BROUSSARD
JIM GRISSOM
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$9,971,562.14
$11,493,135.19
Over/Under Est: 15.26% $1,521,573.05
$14,549,845.73
Over/Under Est: 45.91% $4,578,283.59
Amt Left: 26.6% $3,056,710.54
Subcontractor Percentage Amount
NORMAN HIGHWAY CONSTRUCTORS, INC. 6.75% $707,420.90
LONG LEGACY ENTERPRISES, LLC 4.91% $514,583.20
AMERICAN REMEDIATION OPTIONS, INC. 2.93% $307,073.07
M & D FOUNDATION DRILLING INDUSTRIES, INC. 2.64% $276,680.17
WEBER-BALKE FOUNDATION COMPANY, INC 2.10% $220,086.50
HIGHWAY 1 LLC 1.33% $139,388.12
TRP CONSTRUCTION GROUP, LLC 1.19% $124,715.68
KINGZ INDUSTRIAL LLC 0.79% $82,794.45
PROFESSIONAL TRAFFIC CONTROL LLC 0.11% $11,528.34
TORO BRAVO CONSTRUCTION, LLC 0.09% $9,432.28
PRIMATE CONSTRUCTION, LP 0.05% $5,240.15
MESA ROD BUSTERS INC 0.02% $2,096.06
Total: 22.91% $2,401,038.92

Bid Items & Bid Tabulations

95 Total 0 of 95
JASPER  |  FM 777  |  BEAUMONT  |  1109-01-026  |  04/05/2024  |  $9,971,562.14  |  BR 2024(854)  |  SURF/ROADWAY RESTOR  |  147 WORKING DAYS
Alt
Item Code
Description
Unit
Quantity
Engineer's Estimate
TEXAS MATERIALS GROUP, INC.
C. E. BARKER, LTD.
PREPARING ROW
STA 262.000 $1,000.000 $1,275.000 $2,700.000
SUBGRADE WIDENING (ORD COMP)
STA 258.000 $540.000 $374.000 $762.350
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 1,074.000 $15.000 $45.500 $63.120
BACKFILL (TY A OR B)
STA 258.000 $275.000 $1,850.000 $392.070
BLADING
HR 60.000 $150.000 $180.000 $239.600
SPEC EXCAV WORK (BACKHOE)
HR 80.000 $350.000 $180.000 $130.690
BROADCAST SEED (TEMP) (WARM)
SY 21,942.000 $0.300 $0.250 $0.160
BROADCAST SEED (TEMP) (COOL)
SY 21,942.000 $0.300 $0.250 $0.160
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
SY 43,881.000 $0.500 $0.570 $0.480
VEGETATIVE WATERING
MG 610.000 $25.000 $21.000 $98.020
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 12,026.000 $90.000 $114.000 $145.390
RWRK BS MTL(TY C)(8")(ORD CMP)(ORG POS)
CY 11,298.000 $13.000 $22.000 $15.620
CEMENT TREAT (MX EXST MTL & NW BS)(8")
SY 84,924.000 $2.800 $0.010 $3.460
FOG SEAL (CSS-1H)
GAL 5,945.000 $6.800 $5.250 $9.800
CEM STABIL BKFL
CY 201.900 $150.000 $364.750 $239.600
CEM STABIL BKFL (SPL)
CY 1,299.000 $150.000 $156.500 $125.240
DRILL SHAFT (36 IN)
LF 840.000 $300.000 $455.500 $582.650
CL C CONC (ABUT)
CY 37.700 $1,310.000 $1,950.000 $914.520
CL C CONC (CAP)
CY 30.700 $1,600.000 $2,000.000 $1,222.710
CL C CONC (COLUMN)
CY 17.400 $1,500.000 $3,150.000 $2,013.730
REINF CONC SLAB (BOX BEAM)
SF 4,420.000 $20.000 $33.500 $25.200
APPROACH SLAB
CY 51.400 $750.000 $650.000 $1,021.550
PRESTR CONC BOX BEAM (5XB20)
LF 514.000 $310.000 $374.000 $427.610
RIPRAP (CONC)(5 IN)
CY 4.300 $500.000 $1,014.000 $589.190
RIPRAP (STONE PROTECTION)(18 IN)
CY 690.000 $180.000 $275.000 $205.290
RIPRAP (MOW STRIP)(4 IN)
CY 113.000 $550.000 $848.000 $589.190
RAIL (TY T223)
LF 300.000 $220.000 $245.000 $287.400
ARMOR JOINT (SEALED)
LF 67.000 $170.000 $253.000 $154.910
CONC BOX CULV (6 FT X 6 FT)
LF 44.000 $795.000 $1,050.000 $644.560
RC PIPE (CL III)(18 IN)
LF 148.000 $85.000 $70.000 $61.890
RC PIPE (CL III)(24 IN)
LF 166.000 $120.000 $148.000 $75.530
RC PIPE (CL III)(36 IN)
LF 16.000 $180.000 $201.500 $134.120
RC PIPE (CL III)(42 IN)
LF 8.000 $270.000 $318.000 $178.440
HEADWALL (CH - PW - 0) (DIA= 72 IN)
EA 2.000 $15,000.000 $16,500.000 $27,989.150
SET (TY I)(S= 6 FT)(HW= 7 FT)(3:1) (C)
EA 8.000 $19,300.000 $18,500.000 $22,543.790
SET (TY II) (18 IN) (RCP) (4: 1) (C)
EA 8.000 $1,200.000 $1,060.000 $1,366.790
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 82.000 $1,350.000 $1,007.000 $1,515.990
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 36.000 $2,200.000 $1,590.000 $1,767.560
SET (TY II) (24 IN) (RCP) (6: 1) (C)
EA 1.000 $3,100.000 $2,650.000 $2,085.570
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 13.000 $2,400.000 $2,650.000 $2,085.570
SET (TY II) (36 IN) (RCP) (4: 1) (C)
EA 3.000 $5,200.000 $3,710.000 $4,195.110
SET (TY II) (36 IN) (RCP) (6: 1) (C)
EA 1.000 $4,700.000 $5,830.000 $5,997.520
SET (TY II) (42 IN) (RCP) (4: 1) (C)
EA 2.000 $6,200.000 $6,890.000 $6,373.250
REMOV STR (SET)
EA 25.000 $660.000 $583.000 $762.350
REMOV STR (WINGWALL)
EA 2.000 $1,100.000 $1,272.000 $1,905.880
REMOV STR (HEADWALL)
EA 1.000 $2,250.000 $1,272.000 $3,811.750
REMOV STR (PIPE)
LF 576.000 $25.000 $42.400 $38.120
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 1.000 $145,000.000 $31,800.000 $120,151.870
MOBILIZATION
LS 1.000 $889,953.290 $868,000.000 $1,400,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000 $3,000.000 $3,500.000 $9,665.510
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 120.000 $45.000 $58.000 $49.010
ROCK FILTER DAMS (REMOVE)
LF 120.000 $15.000 $21.000 $17.430
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 2,700.000 $6.000 $6.000 $5.990
BIODEG EROSN CONT LOGS (REMOVE)
LF 2,700.000 $1.750 $1.600 $2.180
DRIVEWAYS (ACP)
SY 6,265.000 $40.000 $33.500 $68.610
TURNOUTS (ACP)
SY 501.000 $100.000 $73.500 $136.130
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 49,850.000 $0.150 $0.210 $0.540
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 24,925.000 $0.150 $0.310 $0.540
MTL W-BEAM GD FEN (TIM POST)
LF 1,025.000 $30.000 $42.200 $34.850
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,500.000 $2,230.000 $2,036.560
TL-3 31" SHORT RADIUS (COMPLETE)
EA 1.000 $24,000.000 $30,740.000 $31,201.910
REMOVE METAL BEAM GUARD FENCE
LF 250.000 $4.000 $12.500 $2.180
GUARDRAIL END TREATMENT (INSTALL)
EA 12.000 $3,300.000 $3,026.000 $3,267.220
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $315.000 $500.000 $381.180
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 22.000 $320.000 $318.000 $326.720
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 58.000 $580.000 $583.000 $500.970
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 5.000 $665.000 $742.000 $707.900
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 1.000 $855.000 $1,044.000 $952.940
REMOVE SM RD SN SUP&AM
EA 84.000 $120.000 $135.000 $81.680
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 24.000 $35.000 $37.000 $38.120
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 42.000 $75.000 $66.750 $70.790
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 57,120.000 $0.400 $0.530 $0.520
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 48.000 $5.000 $5.300 $11.440
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 57,120.000 $0.400 $0.530 $0.520
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 24.000 $1.000 $34.750 $2.020
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 224.000 $1.750 $2.100 $59.900
REF PAV MRK TY I(W)36"(YLD TRI)(090MIL)
EA 8.000 $30.000 $57.000 $0.850
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
LF 53,298.000 $0.650 $0.900 $0.870
RE PM W/RET REQ TY I (Y)6"(BRK)(090MIL)
LF 6,192.000 $0.600 $0.900 $0.860
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
LF 11,008.000 $0.650 $0.900 $19.060
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 46.000 $15.000 $21.000 $6.530
REFL PAV MRKR TY II-A-A
EA 590.000 $5.500 $6.300 $6.530
FULL - WIDTH MOWING
AC 15.000 $1,500.000 $1,600.000 $762.350
SP MIXES SP-D SAC-A PG76-22
TON 18,472.000 $140.000 $186.000 $243.410
TACK COAT
GAL 5,038.000 $5.000 $6.500 $5.720
CEMENT
TON 322.700 $270.000 $320.000 $234.150
EMULSION
GAL 316,767.000 $4.000 $3.100 $3.810
EMUL TRTMNT (MX EXST MTRL) 8"
SY 84,924.000 $1.650 $2.740 $1.910
THERMOPLASTIC PIPE (HDPE) (18")
LF 2,654.000 $85.000 $0.000 $0.000
THERMOPLASTIC PIPE (HDPE) (24")
LF 590.000 $120.000 $0.000 $0.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $11,700.000 $4,600.000 $10,890.720
TMA (STATIONARY)
DAY 160.000 $230.000 $230.000 $381.170
TMA (MOBILE OPERATION)
DAY 5.000 $210.000 $365.000 $76.240
1
RC PIPE (CL III) (24 IN) (ALT)
LF 590.000 $120.000 $148.000 $76.590
2
RC PIPE (CL III)(18 IN)(ALT)
LF 2,654.000 $85.000 $68.000 $62.930
Totals: $10,267,952.140 $11,493,135.195 $14,549,845.755