PREPARING ROW
|
STA
|
262.000
|
$1,000.000
|
$1,275.000
|
$2,700.000
|
|
|
|
SUBGRADE WIDENING (ORD COMP)
|
STA
|
258.000
|
$540.000
|
$374.000
|
$762.350
|
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY C)
|
CY
|
1,074.000
|
$15.000
|
$45.500
|
$63.120
|
|
|
|
BACKFILL (TY A OR B)
|
STA
|
258.000
|
$275.000
|
$1,850.000
|
$392.070
|
|
|
|
BLADING
|
HR
|
60.000
|
$150.000
|
$180.000
|
$239.600
|
|
|
|
SPEC EXCAV WORK (BACKHOE)
|
HR
|
80.000
|
$350.000
|
$180.000
|
$130.690
|
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
21,942.000
|
$0.300
|
$0.250
|
$0.160
|
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
21,942.000
|
$0.300
|
$0.250
|
$0.160
|
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
|
SY
|
43,881.000
|
$0.500
|
$0.570
|
$0.480
|
|
|
|
VEGETATIVE WATERING
|
MG
|
610.000
|
$25.000
|
$21.000
|
$98.020
|
|
|
|
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
|
CY
|
12,026.000
|
$90.000
|
$114.000
|
$145.390
|
|
|
|
RWRK BS MTL(TY C)(8")(ORD CMP)(ORG POS)
|
CY
|
11,298.000
|
$13.000
|
$22.000
|
$15.620
|
|
|
|
CEMENT TREAT (MX EXST MTL & NW BS)(8")
|
SY
|
84,924.000
|
$2.800
|
$0.010
|
$3.460
|
|
|
|
FOG SEAL (CSS-1H)
|
GAL
|
5,945.000
|
$6.800
|
$5.250
|
$9.800
|
|
|
|
CEM STABIL BKFL
|
CY
|
201.900
|
$150.000
|
$364.750
|
$239.600
|
|
|
|
CEM STABIL BKFL (SPL)
|
CY
|
1,299.000
|
$150.000
|
$156.500
|
$125.240
|
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
840.000
|
$300.000
|
$455.500
|
$582.650
|
|
|
|
CL C CONC (ABUT)
|
CY
|
37.700
|
$1,310.000
|
$1,950.000
|
$914.520
|
|
|
|
CL C CONC (CAP)
|
CY
|
30.700
|
$1,600.000
|
$2,000.000
|
$1,222.710
|
|
|
|
CL C CONC (COLUMN)
|
CY
|
17.400
|
$1,500.000
|
$3,150.000
|
$2,013.730
|
|
|
|
REINF CONC SLAB (BOX BEAM)
|
SF
|
4,420.000
|
$20.000
|
$33.500
|
$25.200
|
|
|
|
APPROACH SLAB
|
CY
|
51.400
|
$750.000
|
$650.000
|
$1,021.550
|
|
|
|
PRESTR CONC BOX BEAM (5XB20)
|
LF
|
514.000
|
$310.000
|
$374.000
|
$427.610
|
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
4.300
|
$500.000
|
$1,014.000
|
$589.190
|
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
690.000
|
$180.000
|
$275.000
|
$205.290
|
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
113.000
|
$550.000
|
$848.000
|
$589.190
|
|
|
|
RAIL (TY T223)
|
LF
|
300.000
|
$220.000
|
$245.000
|
$287.400
|
|
|
|
ARMOR JOINT (SEALED)
|
LF
|
67.000
|
$170.000
|
$253.000
|
$154.910
|
|
|
|
CONC BOX CULV (6 FT X 6 FT)
|
LF
|
44.000
|
$795.000
|
$1,050.000
|
$644.560
|
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
148.000
|
$85.000
|
$70.000
|
$61.890
|
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
166.000
|
$120.000
|
$148.000
|
$75.530
|
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
16.000
|
$180.000
|
$201.500
|
$134.120
|
|
|
|
RC PIPE (CL III)(42 IN)
|
LF
|
8.000
|
$270.000
|
$318.000
|
$178.440
|
|
|
|
HEADWALL (CH - PW - 0) (DIA= 72 IN)
|
EA
|
2.000
|
$15,000.000
|
$16,500.000
|
$27,989.150
|
|
|
|
SET (TY I)(S= 6 FT)(HW= 7 FT)(3:1) (C)
|
EA
|
8.000
|
$19,300.000
|
$18,500.000
|
$22,543.790
|
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (C)
|
EA
|
8.000
|
$1,200.000
|
$1,060.000
|
$1,366.790
|
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
82.000
|
$1,350.000
|
$1,007.000
|
$1,515.990
|
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
36.000
|
$2,200.000
|
$1,590.000
|
$1,767.560
|
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
1.000
|
$3,100.000
|
$2,650.000
|
$2,085.570
|
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
13.000
|
$2,400.000
|
$2,650.000
|
$2,085.570
|
|
|
|
SET (TY II) (36 IN) (RCP) (4: 1) (C)
|
EA
|
3.000
|
$5,200.000
|
$3,710.000
|
$4,195.110
|
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (C)
|
EA
|
1.000
|
$4,700.000
|
$5,830.000
|
$5,997.520
|
|
|
|
SET (TY II) (42 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$6,200.000
|
$6,890.000
|
$6,373.250
|
|
|
|
REMOV STR (SET)
|
EA
|
25.000
|
$660.000
|
$583.000
|
$762.350
|
|
|
|
REMOV STR (WINGWALL)
|
EA
|
2.000
|
$1,100.000
|
$1,272.000
|
$1,905.880
|
|
|
|
REMOV STR (HEADWALL)
|
EA
|
1.000
|
$2,250.000
|
$1,272.000
|
$3,811.750
|
|
|
|
REMOV STR (PIPE)
|
LF
|
576.000
|
$25.000
|
$42.400
|
$38.120
|
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$145,000.000
|
$31,800.000
|
$120,151.870
|
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$889,953.290
|
$868,000.000
|
$1,400,000.000
|
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
10.000
|
$3,000.000
|
$3,500.000
|
$9,665.510
|
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
120.000
|
$45.000
|
$58.000
|
$49.010
|
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
120.000
|
$15.000
|
$21.000
|
$17.430
|
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
2,700.000
|
$6.000
|
$6.000
|
$5.990
|
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
2,700.000
|
$1.750
|
$1.600
|
$2.180
|
|
|
|
DRIVEWAYS (ACP)
|
SY
|
6,265.000
|
$40.000
|
$33.500
|
$68.610
|
|
|
|
TURNOUTS (ACP)
|
SY
|
501.000
|
$100.000
|
$73.500
|
$136.130
|
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
49,850.000
|
$0.150
|
$0.210
|
$0.540
|
|
|
|
RUMBLE STRIPS (CENTERLINE) ASPHALT
|
LF
|
24,925.000
|
$0.150
|
$0.310
|
$0.540
|
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,025.000
|
$30.000
|
$42.200
|
$34.850
|
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$2,500.000
|
$2,230.000
|
$2,036.560
|
|
|
|
TL-3 31" SHORT RADIUS (COMPLETE)
|
EA
|
1.000
|
$24,000.000
|
$30,740.000
|
$31,201.910
|
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
250.000
|
$4.000
|
$12.500
|
$2.180
|
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
12.000
|
$3,300.000
|
$3,026.000
|
$3,267.220
|
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$315.000
|
$500.000
|
$381.180
|
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
22.000
|
$320.000
|
$318.000
|
$326.720
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
58.000
|
$580.000
|
$583.000
|
$500.970
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
5.000
|
$665.000
|
$742.000
|
$707.900
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
1.000
|
$855.000
|
$1,044.000
|
$952.940
|
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
84.000
|
$120.000
|
$135.000
|
$81.680
|
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
24.000
|
$35.000
|
$37.000
|
$38.120
|
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
42.000
|
$75.000
|
$66.750
|
$70.790
|
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
57,120.000
|
$0.400
|
$0.530
|
$0.520
|
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
48.000
|
$5.000
|
$5.300
|
$11.440
|
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
57,120.000
|
$0.400
|
$0.530
|
$0.520
|
|
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
24.000
|
$1.000
|
$34.750
|
$2.020
|
|
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
224.000
|
$1.750
|
$2.100
|
$59.900
|
|
|
|
REF PAV MRK TY I(W)36"(YLD TRI)(090MIL)
|
EA
|
8.000
|
$30.000
|
$57.000
|
$0.850
|
|
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
|
LF
|
53,298.000
|
$0.650
|
$0.900
|
$0.870
|
|
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(090MIL)
|
LF
|
6,192.000
|
$0.600
|
$0.900
|
$0.860
|
|
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
|
LF
|
11,008.000
|
$0.650
|
$0.900
|
$19.060
|
|
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
46.000
|
$15.000
|
$21.000
|
$6.530
|
|
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
590.000
|
$5.500
|
$6.300
|
$6.530
|
|
|
|
FULL - WIDTH MOWING
|
AC
|
15.000
|
$1,500.000
|
$1,600.000
|
$762.350
|
|
|
|
SP MIXES SP-D SAC-A PG76-22
|
TON
|
18,472.000
|
$140.000
|
$186.000
|
$243.410
|
|
|
|
TACK COAT
|
GAL
|
5,038.000
|
$5.000
|
$6.500
|
$5.720
|
|
|
|
CEMENT
|
TON
|
322.700
|
$270.000
|
$320.000
|
$234.150
|
|
|
|
EMULSION
|
GAL
|
316,767.000
|
$4.000
|
$3.100
|
$3.810
|
|
|
|
EMUL TRTMNT (MX EXST MTRL) 8"
|
SY
|
84,924.000
|
$1.650
|
$2.740
|
$1.910
|
|
|
|
THERMOPLASTIC PIPE (HDPE) (18")
|
LF
|
2,654.000
|
$85.000
|
$0.000
|
$0.000
|
|
|
|
THERMOPLASTIC PIPE (HDPE) (24")
|
LF
|
590.000
|
$120.000
|
$0.000
|
$0.000
|
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$11,700.000
|
$4,600.000
|
$10,890.720
|
|
|
|
TMA (STATIONARY)
|
DAY
|
160.000
|
$230.000
|
$230.000
|
$381.170
|
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
5.000
|
$210.000
|
$365.000
|
$76.240
|
|
1
|
|
RC PIPE (CL III) (24 IN) (ALT)
|
LF
|
590.000
|
$120.000
|
$148.000
|
$76.590
|
|
2
|
|
RC PIPE (CL III)(18 IN)(ALT)
|
LF
|
2,654.000
|
$85.000
|
$68.000
|
$62.930
|
|
Totals: |
$10,267,952.140
|
$11,493,135.195
|
$14,549,845.755
|