Show Job Controls
Bid Cobra

JASPER FM 777 (1109-01-021)

Items: 37

County: JASPER
Length: N/A
Highway: FM 777
District: BEAUMONT
Control Number: 1109-01-021
DBE Goal: N/A
Project: STP 1702(510)HES
Guaranty: N/A
Time: 44 WORKING DAYS
Engineer's Estimate: $502,308.89
Date: 07/11/2017 (8 years ago)
Contract Number: N/A
Type: PROVIDE ADDITIONAL PAVED SURFACE WIDTH
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (6)
E
Engineer's Estimate
$502,308.89
Over/Under Est: -0.56% -$2,831.39
Over/Under Est: 1.45% $7,293.41
Amt Left: 2.03% $10,124.80
Over/Under Est: 20.76% $104,266.92
Amt Left: 21.44% $107,098.31
Delta: -19.03% -$96,973.51
Over/Under Est: 35.55% $178,591.65
Amt Left: 36.32% $181,423.04
Delta: -12.25% -$74,324.73
Over/Under Est: 54.31% $272,821.46
Amt Left: 55.19% $275,652.85
Delta: -13.84% -$94,229.81
Over/Under Est: 88.94% $446,759.61
Amt Left: 90.01% $449,591.00
Delta: -22.44% -$173,938.15

Bid Items & Bid Tabulations

37 Total 0 of 37
JASPER  |  FM 777  |  BEAUMONT  |  1109-01-021  |  07/11/2017  |  $502,308.89  |  STP 1702(510)HES  |  PROVIDE ADDITIONAL PAVED SURF WIDTH  |  44 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
DREWERY CONSTRUCTION COMPANY, INCORPORATED
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.
OLDCASTLE MATERIALS TEXAS, INC.
A. L. HELMCAMP, INC.
LONGVIEW BRIDGE AND ROAD, LTD.
FNH CONSTRUCTION, LLC
SUBGRADE WIDENING (ORD COMP)
STA 63.010 $76.000 $155.000 $250.000 $444.000 $885.000 $575.000 $450.000
BACKFILL (TY A OR B)
STA 63.010 $193.000 $164.000 $150.000 $267.000 $300.000 $225.000 $450.000
BROADCAST SEED (TEMP) (WARM)
SY 4,698.000 $0.500 $0.240 $0.500 $0.250 $0.120 $0.250 $2.000
BROADCAST SEED (TEMP) (COOL)
SY 4,698.000 $0.500 $0.240 $0.500 $0.250 $0.160 $0.250 $2.000
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
SY 9,396.000 $0.500 $0.360 $0.650 $0.350 $0.450 $0.500 $1.000
VEGETATIVE WATERING
MG 13.200 $42.000 $31.000 $10.000 $73.000 $46.000 $50.000 $500.000
FL BS (CMP IN PLACE)(TYD GR1-2)(IN VEH)
CY 156.000 $80.000 $93.000 $99.000 $155.000 $85.000 $130.000 $80.000
FL BS(RDWY DEL)(TY D GR 1-2)(FNAL POS)
CY 1,089.000 $60.000 $72.000 $76.000 $79.000 $95.000 $120.000 $80.000
CEMENT
TON 306.000 $147.000 $198.000 $200.000 $207.000 $220.000 $195.000 $171.000
CEMENT TREAT (MX EXST MTL & NW BS)(8")
SY 19,605.000 $3.500 $3.500 $1.500 $2.800 $3.300 $3.250 $3.500
PRIME COAT & BLOTTER (AE-P)
GAL 3,923.000 $4.000 $4.000 $5.800 $2.500 $4.000 $5.500 $8.000
ASPH (AC-10-2TR)
GAL 15,870.000 $4.000 $2.800 $2.750 $2.250 $4.000 $5.000 $6.000
AGGR(TY-PB GR-3 SAC-B)
CY 404.000 $85.000 $133.000 $135.000 $180.000 $130.000 $185.000 $500.000
CEM STABIL BKFL
CY 11.000 $73.000 $225.000 $450.000 $319.000 $160.000 $400.000 $140.000
CUT & RESTORING PAV
SY 18.000 $150.000 $52.000 $180.000 $148.000 $220.000 $435.000 $200.000
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
LF 32.000 $455.000 $530.000 $650.000 $380.000 $800.000 $750.000 $600.000
RC PIPE (CL III)(18 IN)
LF 38.000 $54.000 $68.000 $230.000 $193.000 $70.000 $100.000 $85.000
WINGWALL (PW - 2) (HW=3 FT)
EA 2.000 $8,800.000 $7,000.000 $5,500.000 $6,386.000 $5,900.000 $12,000.000 $8,000.000
WINGWALL (PW - 2) (HW=4 FT)
EA 2.000 $8,800.000 $8,300.000 $7,500.000 $8,137.000 $7,500.000 $15,000.000 $9,500.000
SET (TY II) (18 IN) (RCP) (4: 1) (C)
EA 4.000 $930.000 $700.000 $1,500.000 $1,133.000 $1,100.000 $1,200.000 $1,850.000
REMOV STR (WINGWALL)
EA 4.000 $1,772.000 $710.000 $250.000 $592.000 $2,200.000 $775.000 $1,500.000
REMOV STR (PIPE)
LF 40.000 $13.000 $26.000 $50.000 $10.300 $43.000 $40.000 $30.000
MOBILIZATION
LS 1.000 $40,000.000 $25,000.000 $30,000.000 $92,330.000 $65,000.000 $70,000.000 $94,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 3.000 $4,000.000 $2,000.000 $3,000.000 $1,327.000 $13,000.000 $4,000.000 $8,500.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 50.000 $28.000 $31.500 $30.000 $51.000 $47.000 $40.000 $30.000
ROCK FILTER DAMS (REMOVE)
LF 50.000 $9.000 $9.450 $10.000 $8.000 $10.000 $12.000 $15.000
DRIVEWAYS (SURF TREAT)
SY 394.000 $20.000 $8.000 $18.700 $13.000 $8.000 $26.000 $52.000
TURNOUTS (SURF TREAT)
SY 721.000 $30.000 $30.000 $30.000 $26.000 $18.000 $50.000 $62.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 19.000 $231.000 $225.000 $350.000 $331.000 $340.000 $550.000 $650.000
MAILBOX INSTALL-D (TWW-POST) TY 4
EA 3.000 $225.000 $236.000 $400.000 $370.000 $380.000 $620.000 $650.000
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 8.000 $51.000 $50.000 $40.000 $360.000 $42.000 $70.000 $100.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 2,475.000 $2.000 $1.200 $1.000 $1.000 $0.800 $2.500 $5.000
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 13,851.000 $0.330 $0.360 $0.340 $0.350 $0.360 $0.450 $0.500
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
LF 2,189.000 $0.350 $0.380 $0.360 $0.350 $0.390 $0.450 $0.500
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 11,398.000 $0.340 $0.360 $0.340 $0.350 $0.360 $0.450 $0.500
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 27.000 $12.000 $15.750 $15.000 $15.000 $16.000 $18.000 $20.000
REFL PAV MRKR TY II-A-A
EA 172.000 $3.000 $3.400 $3.250 $3.350 $4.000 $4.000 $15.000
Totals: $502,308.890 $499,477.500 $509,602.300 $606,575.810 $680,900.540 $775,130.350 $949,068.500