Show Job Controls
Bid Cobra

JASPER CS (0920-12-048)

Items: 26

County: JASPER
Length: N/A
Highway: CS
District: BEAUMONT
Control Number: 0920-12-048
DBE Goal: N/A
Project: STP 2022(737)TAPS
Guaranty: N/A
Time: 41 WORKING DAYS
Engineer's Estimate: $654,150.00
Date: 06/28/2023 (2 years ago)
Contract Number: N/A
Type: CONSTRUCT PEDESTRIAN INFRASTRUCTURE
Mail/Deliver Bids To: N/A
BRYCE BROUSSARD
JIM GRISSOM
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$654,150.00
$619,481.50
Over/Under Est: -5.3% -$34,668.50
Over/Under Est: 2.33% $15,227.91
Amt Left: 8.05% $49,896.41
Over/Under Est: 10.13% $66,250.00
Amt Left: 16.29% $100,918.50
Delta: -7.62% -$51,022.09
Subcontractor Percentage Amount
CLASSIC TEJAS CONSTRUCTION, INC. 3.16% $21,030.01
Total: 3.16% $21,030.01

Bid Items & Bid Tabulations

26 Total 0 of 26
JASPER  |  CS  |  BEAUMONT  |  0920-12-048  |  06/28/2023  |  $654,150.00  |  STP 2022(737)TAPS  |  CONSTRUCT PEDESTRIAN INFRASTRUCT  |  41 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ENCINO LANDSCAPE, INC.
TI-ZACK CONCRETE, INC.
FNH CONSTRUCTION, LLC
REMOVING CONC (SIDEWALKS)
SY 548.000 $30.000 $40.000 $14.560 $50.000
REMOVING CONC (DRIVEWAYS)
SY 388.000 $40.000 $40.000 $20.570 $50.000
REMOVING CONC (MISC)
SY 30.000 $40.000 $40.000 $26.600 $100.000
EXCAVATION (SPECIAL)
CY 198.000 $45.000 $50.000 $40.300 $200.000
EMBANKMENT (FINAL)(ORD COMP)(TY A)
CY 200.000 $150.000 $40.000 $40.000 $100.000
BLOCK SODDING
SY 1,084.000 $5.000 $4.000 $5.500 $10.000
VEGETATIVE WATERING
MG 9.100 $50.000 $5.000 $1.100 $500.000
RAIL (HANDRAIL)(TY F)
LF 400.000 $220.000 $200.000 $187.500 $200.000
RC PIPE (CL III)(24 IN)
LF 180.000 $150.000 $200.000 $495.000 $200.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 2.000 $3,000.000 $2,200.000 $7,150.000 $2,500.000
REMOV STR (SET)
EA 4.000 $600.000 $1,000.000 $1,705.000 $500.000
MOBILIZATION
LS 1.000 $105,275.000 $55,000.000 $55,000.000 $68,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 3.000 $7,500.000 $7,000.000 $4,400.000 $12,500.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,000.000 $4.000 $2.000 $0.100 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,000.000 $1.000 $1.000 $0.100 $2.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 100.000 $6.000 $0.500 $0.100 $18.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 100.000 $1.100 $0.500 $0.100 $9.000
DRIVEWAYS (CONC)
SY 388.000 $150.000 $120.000 $163.170 $150.000
CONC SIDEWALKS (6")
SY 1,780.000 $100.000 $120.000 $153.920 $120.000
CURB RAMPS (TY 1)
EA 4.000 $2,000.000 $2,500.000 $2,311.800 $3,250.000
CURB RAMPS (TY 7)
EA 6.000 $2,000.000 $2,500.000 $2,152.200 $3,250.000
CURB RAMPS (TY 10)
EA 6.000 $2,000.000 $2,500.000 $2,152.200 $3,250.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 4.000 $1,000.000 $500.000 $495.000 $850.000
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 48.000 $15.000 $50.000 $55.000 $20.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $15,000.000 $15,000.000 $1.100 $10,000.000
TMA (STATIONARY)
DAY 41.000 $400.000 $500.000 $1.100 $250.000
Totals: $654,150.000 $619,481.500 $669,377.910 $720,400.000