Show Job Controls
Bid Cobra

JASPER VA (0920-12-047)

Items: 61

County: JASPER
Length: N/A
Highway: VA
District: BEAUMONT
Control Number: 0920-12-047
DBE Goal: N/A
Project: STP 2021(242)SRS
Guaranty: N/A
Time: 120 WORKING DAYS
Engineer's Estimate: $883,625.50
Date: 04/07/2022 (4 years ago)
Contract Number: N/A
Type: CONSTRUCT PEDESTRIAN INFRASTRUCTURE
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (3)
E
Engineer's Estimate
$883,625.50
Over/Under Est: 77.87% $688,049.32
$1,614,216.00
Over/Under Est: 82.68% $730,590.50
Amt Left: 2.71% $42,541.18
$1,679,645.50
Over/Under Est: 90.09% $796,020.00
Amt Left: 6.87% $107,970.68
Delta: -4.05% -$65,429.50

Bid Items & Bid Tabulations

61 Total 0 of 61
JASPER  |  VA  |  BEAUMONT  |  0920-12-047  |  04/07/2022  |  $883,625.50  |  STP 2021(242)SRS  |  CONSTRUCT PEDESTRIAN INFRASTRUCT  |  120 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
PROJECT ALLIED RESOURCES, LLC
ENCINO LANDSCAPE, INC.
TI-ZACK CONCRETE, INC.
PREPARING ROW
STA 65.000 $150.000 $337.000 $500.000 $1,000.000
REMOVING CONC (SIDEWALKS)
SY 52.000 $15.000 $30.900 $10.000 $25.000
REMOVING CONC (DRIVEWAYS)
SY 992.000 $20.000 $16.700 $15.000 $25.000
REMOVE CONC (GUTTER)
LF 111.000 $11.000 $5.700 $10.000 $15.000
REMOVING CONC (CURB OR CURB & GUTTER)
LF 1,576.000 $8.000 $9.400 $12.000 $10.000
REMOVING STAB BASE AND ASPH PAV(0"-16")
SY 848.000 $10.000 $6.400 $10.000 $15.000
EXCAVATION (ROADWAY)
CY 185.000 $25.000 $21.400 $10.000 $55.000
EMBANKMENT (FINAL)(ORD COMP)(TY A)
CY 90.000 $36.000 $71.000 $50.000 $55.000
FURNISHING AND PLACING TOPSOIL (4")
SY 3,475.000 $3.500 $1.900 $3.000 $5.000
BLOCK SODDING
SY 3,475.000 $4.000 $7.800 $6.000 $5.000
VEGETATIVE WATERING
MG 58.500 $20.000 $54.000 $100.000 $1.000
PROOF ROLLING
HR 8.000 $125.000 $142.000 $300.000 $100.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(10")
SY 51.000 $100.000 $208.000 $300.000 $150.000
PLANE ASPH CONC PAV(0" TO 2")
SY 106.000 $6.500 $8.300 $100.000 $15.000
CL A CONC (MISC)
CY 0.500 $850.000 $1,230.000 $3,000.000 $1,200.000
CL C CONC (MISC)
CY 3.400 $850.000 $1,340.000 $1,000.000 $1,200.000
CL A CONC (STEPS)
CY 1.000 $1,500.000 $1,400.000 $2,000.000 $1,200.000
RETAINING WALL (CAST - IN - PLACE)
SF 5,643.000 $10.000 $73.000 $75.000 $65.000
RIPRAP (CONC)(6 IN)
CY 8.000 $610.000 $1,000.000 $1,000.000 $1,200.000
RAIL (HANDRAIL)(TY B)
LF 172.000 $120.000 $302.000 $80.000 $150.000
GRATE & FRAME
EA 12.000 $1,500.000 $2,470.000 $2,500.000 $1,000.000
ADJUSTING MANHOLES
EA 3.000 $1,000.000 $1,910.000 $2,000.000 $500.000
MOBILIZATION
LS 1.000 $81,000.000 $114,000.000 $80,000.000 $145,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $5,000.000 $3,290.000 $8,000.000 $1,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 43.000 $33.000 $60.000 $50.000 $2.000
ROCK FILTER DAMS (REMOVE)
LF 43.000 $9.000 $15.200 $1.000 $1.000
SANDBAGS FOR EROSION CONTROL
EA 906.000 $9.000 $17.000 $2.000 $1.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 174.000 $3.000 $5.200 $5.000 $1.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 174.000 $1.000 $1.680 $1.000 $1.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 2,000.000 $5.000 $9.000 $7.000 $1.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 2,000.000 $1.500 $1.920 $1.000 $1.000
CONC CURB & GUTTER (TY II)
LF 2,814.000 $28.000 $30.000 $35.000 $38.000
CONC CURB & GUTTER (ARMOR CURB)
LF 14.000 $200.000 $271.000 $300.000 $300.000
CONC CURB & GUTTER (VALLEY GUTTER)
LF 197.000 $23.000 $41.500 $30.000 $48.000
DRIVEWAYS (CONC)
SY 1,376.000 $85.000 $100.000 $100.000 $115.000
DRIVEWAYS (ACP)
SY 57.000 $35.000 $72.000 $75.000 $85.000
CONC SIDEWALKS (4")
SY 1,795.000 $58.000 $70.000 $90.000 $100.000
CURB RAMPS (TY 1)
SY 17.000 $165.000 $169.000 $180.000 $125.000
CURB RAMPS (TY 2)
SY 60.000 $165.000 $169.000 $180.000 $125.000
CURB RAMPS (TY 3)
SY 78.000 $165.000 $169.000 $180.000 $125.000
CURB RAMPS (TY 5)
SY 30.000 $165.000 $169.000 $180.000 $125.000
CURB RAMPS (TY 6)
SY 45.000 $165.000 $169.000 $180.000 $125.000
CURB RAMPS (TY 7)
SY 31.000 $165.000 $169.000 $180.000 $125.000
CURB RAMPS (TY 10)
SY 63.000 $165.000 $169.000 $180.000 $125.000
CONC SIDEWALKS (SPECIAL) (TYPE B)
SY 1,256.000 $60.000 $140.000 $125.000 $225.000
RELOCATE EXISTING MAILBOX
EA 11.000 $500.000 $712.000 $500.000 $250.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 9.000 $500.000 $759.000 $700.000 $450.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 11.000 $450.000 $675.000 $600.000 $450.000
REMOVE SM RD SN SUP&AM
EA 4.000 $100.000 $131.000 $100.000 $450.000
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 195.000 $14.000 $47.200 $30.000 $21.000
ELIM EXT PAV MRK & MRKS (24")
LF 72.000 $3.500 $7.800 $10.000 $6.000
PAV SURF PREP FOR MRK (24")
LF 390.000 $1.000 $1.200 $1.000 $0.100
TREE REMOVAL (4" - 12" DIA)
EA 10.000 $500.000 $544.000 $500.000 $500.000
TREE REMOVAL (18" - 24" DIA)
EA 1.000 $1,000.000 $1,700.000 $2,000.000 $1,500.000
D-GR HMA TY-B PG64-22 (EXEMPT)
TON 186.000 $90.000 $194.000 $300.000 $330.000
TACK COAT
GAL 124.000 $6.000 $15.300 $50.000 $50.000
D-GR HMA TY-D PG 76-22 (EXEMPT)
TON 60.000 $125.000 $194.000 $400.000 $300.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 120.000 $75.000 $57.000 $300.000 $25.000
TMA (STATIONARY)
DAY 120.000 $250.000 $377.000 $200.000 $100.000
ADJUST VALVE BOX
EA 5.000 $770.000 $1,360.000 $500.000 $500.000
ADJUST METER BOX
EA 9.000 $675.000 $1,360.000 $500.000 $500.000
Totals: $883,625.500 $1,571,674.820 $1,614,216.000 $1,679,645.500