JACK CAMPSEY RD (0902-40-032)

Items: 48

County: JACK
Length: 0.0000 MILES
Highway: CAMPSEY RD
District: FORT WORTH
Control Number: 0902-40-032
DBE Goal: 0.0%
Project: BR 2024(090)
Guaranty: $16,000.00
Time: 85 WORKING DAYS
Engineer's Estimate: $811,642.89
Date: 11/06/2024 (1 year ago)
Contract Number: 11243029
Type: BRIDGE REPLACEMENT
Project ID: A00190562
Project Description: REPLACE EXISTING BRIDGE
Mail/Deliver Bids To: N/A
EDREAN CHENG
KOREY COBURN
OSCAR CHAVEZ
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (6)
E
Engineer's Estimate
$811,642.89
$788,118.19
Over/Under Est: -2.9% -$23,524.70
$805,165.00
Over/Under Est: -0.8% -$6,477.89
Amt Left: 2.16% $17,046.81
Over/Under Est: 25.57% $207,497.61
Amt Left: 29.31% $231,022.31
Delta: -26.58% -$213,975.50
Over/Under Est: 32.58% $264,430.11
Amt Left: 36.54% $287,954.81
Delta: -5.59% -$56,932.50
$1,112,092.70
Over/Under Est: 37.02% $300,449.81
Amt Left: 41.11% $323,974.51
Delta: -3.35% -$36,019.70
$1,245,348.00
Over/Under Est: 53.44% $433,705.11
Amt Left: 58.02% $457,229.81
Delta: -11.98% -$133,255.30
Subcontractor Percentage Amount
TEXAS SHAFTS, INC. 9.11% $71,797.57
TEXAS MATERIALS GROUP, INC. 7.25% $57,138.57
DUSTROL, INC. 1.08% $8,511.68
STRIPE-A-ZONE, LLC 1.05% $8,275.24
Total: 18.49% $145,723.06

Bid Items & Bid Tabulations

48 Total 0 of 48
JACK  |  CAMPSEY RD  |  FORT WORTH  |  0902-40-032  |  11/06/2024  |  $811,642.89  |  BR 2024(090)  |  BRIDGE REPL  |  85 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
YOKO EXCAVATING, LLC
SKYLINE BRIDGE LLC
COPPELL CONSTRUCTION CO., INC.
HODGES AND SON CONSTRUCTION COMPANY, INC.
STX CIVIL
EARTH BUILDERS, L.P.
PREPARING ROW
STA 5.500 $7,000.000 $1,691.946 $3,500.000 $8,000.000 $9,000.000 $3,000.000 $25,000.000
RMV (8"-12") TRT/UNTRT BASE & ASPH PAV
SY 1,071.000 $19.000 $28.777 $15.000 $30.000 $15.000 $20.000 $25.000
EXCAV (ROADWAY)
CY 52.000 $42.000 $23.797 $25.000 $94.000 $80.000 $100.000 $40.000
EMBANK (FNL)(DC)(TY B)
CY 1,053.000 $20.000 $65.187 $39.000 $52.000 $50.000 $100.000 $50.000
COMPOST MANUF TOPSOIL (4")
SY 994.000 $2.750 $12.742 $10.000 $8.000 $15.000 $4.000 $15.000
HYDRO MULCH SEED (PERM_RURAL_SANDY)
SY 994.000 $2.400 $1.455 $4.000 $3.000 $3.000 $2.000 $4.000
HYDRO MULCH SEED (TEMP_WARM)
SY 497.000 $1.200 $1.532 $4.000 $3.000 $1.000 $4.000 $4.000
HYDRO MULCH SEED (TEMP_COOL)
SY 497.000 $0.750 $1.223 $4.000 $3.000 $1.000 $4.000 $4.000
VEGETATIVE WATERING
TGL 233.000 $40.000 $18.267 $10.000 $40.000 $1.000 $123.000 $50.000
FL BS (CMP IN PLC)(TY E GR 1-2) (8")
SY 1,071.000 $30.000 $23.445 $35.000 $25.000 $50.000 $60.000 $40.000
ASPH (CRS-2P)
GAL 429.000 $8.050 $8.593 $32.000 $26.500 $28.000 $15.000 $40.000
AGGR (TY-B, GR-4)(SAC-B)
CY 9.000 $373.000 $247.508 $2,000.000 $1,550.000 $1,800.000 $300.000 $1,800.000
D-GR HMA TY-D PG64-22
TON 121.000 $280.000 $280.001 $350.000 $317.000 $315.000 $300.000 $450.000
CEM STABIL BKFL
CY 115.000 $286.650 $295.799 $300.000 $325.000 $350.000 $330.000 $450.000
DRILL SHAFT (36 IN)
LF 270.000 $376.220 $405.324 $350.000 $400.000 $260.000 $361.910 $450.000
CL C CONC (ABUT)(HPC)
CY 30.900 $1,561.160 $2,060.888 $1,400.000 $1,700.000 $2,000.000 $2,500.000 $2,500.000
REINF CONC SLAB (HPC)
SF 1,170.000 $27.500 $31.632 $38.000 $45.000 $60.000 $60.000 $45.000
APPROACH SLAB (HPC)
CY 38.500 $770.000 $755.652 $875.000 $1,100.000 $1,800.000 $1,000.000 $1,500.000
PRESTR CONC GIRDER (TX28)
LF 178.000 $250.000 $329.465 $450.000 $422.000 $375.000 $470.000 $350.000
EPOXY WATERPROOF FINISH (TY X)
SF 306.000 $26.400 $20.050 $20.000 $20.000 $20.000 $20.000 $35.000
RIPRAP (MOW STRIP)(4 IN)
CY 23.000 $670.000 $624.713 $750.000 $1,000.000 $700.000 $1,000.000 $650.000
RIPRAP (STONE PROTECTION)(24 IN)
CY 357.000 $225.000 $162.492 $170.000 $200.000 $300.000 $300.000 $250.000
RAIL (TY T631)
LF 122.000 $150.000 $89.955 $100.000 $110.000 $90.000 $210.000 $120.000
ARMOR JOINT (SEALED)
LF 44.000 $150.000 $157.321 $175.000 $245.000 $200.000 $300.000 $220.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 1.000 $35,000.000 $38,661.666 $11,000.000 $60,000.000 $70,000.000 $60,000.000 $75,000.000
MOBILIZATION
LS 1.000 $80,000.000 $75,066.564 $70,000.000 $100,000.000 $90,000.000 $90,000.000 $100,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 4.000 $2,000.000 $1,536.467 $3,000.000 $13,500.000 $15,000.000 $2,500.000 $3,500.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $15,000.000 $4,289.498 $6,500.000 $8,000.000 $15,000.000 $6,500.000 $20,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 68.000 $50.000 $26.944 $50.000 $70.000 $1.000 $85.000 $65.000
ROCK FILTER DAMS (REMOVE)
LF 68.000 $50.000 $9.326 $10.000 $30.000 $1.000 $35.000 $30.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 290.000 $2.500 $20.937 $20.000 $40.000 $1.000 $50.000 $70.000
CONSTRUCTION EXITS (REMOVE)
SY 290.000 $2.500 $4.814 $8.000 $13.000 $1.000 $15.000 $8.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 803.000 $4.000 $6.209 $4.000 $5.000 $1.000 $6.000 $5.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 803.000 $1.000 $2.314 $1.500 $2.000 $1.000 $3.000 $2.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 160.000 $9.320 $7.538 $12.000 $9.000 $8.000 $10.000 $12.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 160.000 $2.500 $3.483 $6.000 $2.000 $1.000 $3.000 $2.000
MTL W-BEAM GD FEN (TIM POST)
LF 125.000 $40.000 $29.501 $32.000 $24.000 $26.000 $40.000 $28.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $15,000.000 $1,022.060 $1,800.000 $1,350.000 $1,500.000 $2,300.000 $1,500.000
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $3,500.000 $2,668.539 $3,800.000 $3,000.000 $3,000.000 $4,200.000 $3,200.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 2.000 $6,000.000 $678.608 $1,200.000 $675.000 $2,000.000 $830.000 $1,200.000
REMOVE SM RD SN SUP&AM
EA 2.000 $200.000 $134.213 $200.000 $150.000 $50.000 $155.000 $200.000
INSTL DEL ASSM (D-DW)SZ 1(BRF)GF2
EA 12.000 $100.000 $48.822 $50.000 $45.000 $50.000 $70.000 $60.000
RE PM TY II (W) 6" (SLD)
LF 992.000 $0.350 $2.192 $10.000 $1.500 $10.000 $2.000 $10.000
RE PM TY II (Y) 6" (BRK)
LF 123.000 $0.400 $2.192 $10.000 $1.500 $10.000 $2.000 $10.000
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 170.000 $0.500 $8.492 $10.000 $6.750 $10.000 $10.000 $10.000
REFL PAV MRK TY I (Y)6"(BRK)(100MIL)
LF 22.000 $0.500 $8.492 $12.000 $7.000 $10.000 $10.000 $10.000
REFL PAV MRKR TY II-A-A
EA 14.000 $10.000 $16.576 $150.000 $10.000 $100.000 $15.000 $100.000
PAV SURF PREP FOR MRK (6")
LF 192.000 $0.600 $3.115 $10.000 $2.000 $10.000 $3.000 $10.000
Totals: $811,642.894 $788,118.357 $805,165.000 $1,019,140.500 $1,076,073.000 $1,112,092.700 $1,245,348.000