Show Job Controls
Bid Cobra

JACK CR (0902-40-027)

Items: 36

County: JACK
Length: N/A
Highway: CR
District: FORT WORTH
Control Number: 0902-40-027
DBE Goal: N/A
Project: BR 2017(542)
Guaranty: N/A
Time: 107 WORKING DAYS
Engineer's Estimate: $470,847.25
Date: 04/04/2018 (8 years ago)
Contract Number: N/A
Type: REPLACE BRIDGE
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (7)
E
Engineer's Estimate
$470,847.25
$434,443.44
Over/Under Est: -7.73% -$36,403.81
Over/Under Est: 2.7% $12,731.75
Amt Left: 11.31% $49,135.56
Over/Under Est: 7.53% $35,478.25
Amt Left: 16.55% $71,882.06
Delta: -4.70% -$22,746.50
Over/Under Est: 18.21% $85,737.42
Amt Left: 28.11% $122,141.23
Delta: -9.93% -$50,259.17
Over/Under Est: 21.54% $101,424.42
Amt Left: 31.73% $137,828.23
Delta: -2.82% -$15,687.00
Over/Under Est: 21.85% $102,866.75
Amt Left: 32.06% $139,270.56
Delta: -0.25% -$1,442.33
Over/Under Est: 28.44% $133,931.25
Amt Left: 39.21% $170,335.06
Delta: -5.41% -$31,064.50

Bid Items & Bid Tabulations

36 Total 0 of 36
JACK  |  CR  |  FORT WORTH  |  0902-40-027  |  04/04/2018  |  $470,847.25  |  BR 2017(542)  |  REPLACE BRIDGE  |  107 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
PIERCE R & B LLC
HODGES AND SON CONSTRUCTION COMPANY, INC.
FNH CONSTRUCTION, LLC
REECE CONSTRUCTION CO., INC.
COPPELL CONSTRUCTION CO., INC.
EARTH BUILDERS, L.P.
STATELINE CONSTRUCTION, LLC
PREPARING ROW
STA 4.000 $6,000.000 $1,500.000 $3,000.000 $5,000.000 $1,500.000 $2,200.000 $10,000.000 $6,500.000
REMOVING STAB BASE AND ASPH PAV (6")
SY 576.000 $4.000 $7.000 $10.000 $12.000 $10.000 $8.000 $5.000 $9.000
EXCAVATION (ROADWAY)
CY 755.000 $14.000 $10.000 $15.000 $25.000 $25.000 $25.000 $10.000 $26.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 226.000 $35.000 $22.000 $20.000 $35.000 $25.000 $84.000 $20.000 $45.000
STRAW/HAY MLCH SEED(PERM)(RURAL)(SANDY)
SY 2,118.000 $0.300 $1.010 $2.000 $1.000 $0.940 $0.940 $1.500 $1.000
STRAW/HAY MLCH SEED(TEMP)(WARM)
SY 1,059.000 $0.300 $1.100 $2.000 $1.000 $1.000 $1.000 $1.500 $1.000
STRAW/HAY MLCH SEED(TEMP)(COOL)
SY 1,059.000 $0.300 $1.100 $2.000 $1.000 $1.000 $1.000 $1.500 $1.000
VEGETATIVE WATERING
MG 47.000 $15.000 $10.000 $1.000 $50.000 $150.000 $40.000 $50.000 $200.000
SOIL RETENTION BLANKETS (CL 2) (TY F)
SY 246.000 $5.000 $4.400 $5.000 $5.000 $4.000 $4.000 $8.000 $4.500
FL BS (CMP IN PLC)(TY A GR 4) (6")
SY 727.000 $8.000 $15.000 $30.000 $18.000 $14.000 $24.000 $50.000 $48.000
D-GR HMA TY-D SAC-B PG64-22
TON 85.000 $110.000 $245.000 $180.000 $150.000 $200.750 $200.750 $150.000 $365.000
CEM STABIL BKFL
CY 45.000 $150.000 $214.000 $280.000 $200.000 $242.000 $284.000 $200.000 $385.000
DRILL SHAFT (36 IN)
LF 312.000 $200.000 $211.000 $170.000 $150.000 $232.000 $235.000 $300.000 $245.000
CL C CONC (ABUT)(HPC)
CY 32.000 $1,000.000 $975.000 $1,000.000 $850.000 $1,336.000 $1,300.000 $1,250.000 $1,325.000
REINF CONC SLAB (HPC)
SF 1,950.000 $16.000 $21.000 $22.000 $19.000 $30.700 $35.000 $25.000 $26.750
PRESTR CONC GIRDER (TX28)
LF 298.000 $150.000 $177.000 $200.000 $150.000 $189.000 $223.000 $180.000 $190.000
RIPRAP (MOW STRIP)(4 IN)
CY 14.000 $465.000 $450.000 $500.000 $450.000 $822.000 $600.000 $500.000 $600.000
RAIL (TY T631)
LF 182.000 $100.000 $90.000 $80.000 $120.000 $97.000 $80.000 $100.000 $115.000
ARMOR JOINT (SEALED)
LF 44.000 $80.000 $90.000 $80.000 $60.000 $112.000 $108.000 $100.000 $110.000
GABIONS (PVC)( 3FT X 3 FT)
CY 165.000 $277.000 $209.000 $220.000 $200.000 $350.000 $260.000 $200.000 $160.000
GABIONS (3FT X 1.5FT)(PVC)
CY 116.000 $225.000 $175.990 $220.000 $180.000 $350.000 $319.000 $200.000 $160.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 1.000 $30,000.000 $15,900.000 $30,000.000 $75,000.000 $25,000.000 $21,000.000 $25,000.000 $18,000.000
MOBILIZATION
LS 1.000 $39,524.750 $40,000.000 $40,000.000 $50,000.000 $53,130.000 $55,000.000 $50,000.000 $55,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 5.000 $6,500.000 $2,300.000 $3,200.000 $3,500.000 $800.000 $1,400.000 $2,500.000 $7,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 100.000 $27.000 $25.400 $10.000 $35.000 $25.000 $24.000 $50.000 $30.000
ROCK FILTER DAMS (REMOVE)
LF 100.000 $11.000 $7.000 $10.000 $5.000 $10.000 $5.000 $10.000 $20.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 487.000 $2.600 $3.250 $4.000 $4.500 $3.000 $3.000 $5.000 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 487.000 $1.500 $1.170 $1.000 $1.000 $1.000 $1.000 $1.000 $1.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 100.000 $5.000 $5.820 $10.000 $6.000 $5.000 $5.000 $10.000 $6.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 100.000 $1.250 $1.660 $1.000 $2.000 $1.000 $1.000 $1.000 $3.000
MTL W-BEAM GD FEN (TIM POST)
LF 100.000 $20.000 $28.700 $25.000 $25.000 $27.000 $27.000 $50.000 $35.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $2,700.000 $2,417.900 $2,800.000 $2,500.000 $2,310.000 $2,310.000 $2,000.000 $2,500.000
WIRE FENCE (TY D)
LF 444.000 $15.000 $10.000 $20.000 $12.000 $10.000 $10.000 $20.000 $17.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 4.000 $50.000 $32.000 $40.000 $30.000 $28.000 $28.000 $500.000 $40.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 8.000 $50.000 $50.010 $50.000 $30.000 $45.000 $45.000 $500.000 $40.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 14.000 $150.000 $85.000 $100.000 $100.000 $88.000 $300.000 $200.000 $85.000
Totals: $470,847.250 $434,443.440 $483,579.000 $506,325.500 $556,584.670 $572,271.670 $573,714.000 $604,778.500