HUTCHINSON SH 136 (0379-01-050)

Items: 90

County: HUTCHINSON
Length: 0.0000 MILES
Highway: SH 136
District: AMARILLO
Control Number: 0379-01-050
DBE Goal: 6.0%
Project: F 2025(753)
Guaranty: $73,000.00
Time: 152 WORKING DAYS
Engineer's Estimate: $3,654,451.25
Date: 05/02/2025 (1 year ago)
Contract Number: 5253217
Type: CONSTRUCT PEDESTRIAN INFRASTRUCTURE
Project ID: A00201205
Contract Type: Federal
Project Description: PEDESTRIAN IMPROVEMENTS
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
ZACHARY MAYER
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (6)
E
Engineer's Estimate
$3,654,451.25
$3,406,939.22
Over/Under Est: -6.77% -$247,512.03
Over/Under Est: -5.37% -$196,195.00
Amt Left: 1.51% $51,317.03
$3,544,271.53
Over/Under Est: -3.01% -$110,179.72
Amt Left: 4.03% $137,332.31
Delta: -2.49% -$86,015.28
$3,794,048.81
Over/Under Est: 3.82% $139,597.56
Amt Left: 11.36% $387,109.59
Delta: -7.05% -$249,777.28
Over/Under Est: 21.34% $779,881.75
Amt Left: 30.16% $1,027,393.78
Delta: -16.88% -$640,284.19
$5,444,048.83
Over/Under Est: 48.97% $1,789,597.58
Amt Left: 59.79% $2,037,109.61
Delta: -22.77% -$1,009,715.83
Subcontractor Percentage Amount
WG ENGINEERING & CONSTRUCTION, LLC 6.67% $227,242.85
TRP CONSTRUCTION GROUP, LLC 3.71% $126,397.45
DK CONTRACTING, LLC 2.46% $83,810.70
BLUE BIRD CONSTRUCTION, LLC 0.11% $3,747.63
Total: 12.95% $441,198.63

Bid Items & Bid Tabulations

90 Total 0 of 90
HUTCHINSON  |  SH 136  |  AMARILLO  |  0379-01-050  |  05/02/2025  |  $3,654,451.25  |  F 2025(753)  |  CONSTRUCT PEDESTRIAN INFRASTRUCT  |  152 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TALBERT COMPANIES LLC
L A FULLER & SONS CONSTRUCTION, LTD.
STX CIVIL
TI-ZACK CONCRETE, LLC
O. TREVINO CONSTRUCTION, LLC
GILVIN-TERRILL, LTD.
REMOV CONC (DRIVEWAYS)
SY 568.000 $29.000 $17.600 $24.200 $25.000 $28.100 $75.000 $60.000
REMOV CONC (SIDEWALK, RAMP OR SUP)
SY 564.000 $29.000 $19.800 $22.450 $25.000 $28.300 $68.000 $60.000
REMOV CONC (CURB RAMP)
SY 369.000 $29.000 $16.500 $22.250 $25.000 $21.630 $75.000 $60.000
REMOV CONC (CURB OR CURB & GUTTER)
LF 4,868.000 $10.000 $17.600 $8.500 $10.000 $6.560 $20.000 $20.000
REMOV CONC (GUTTER)
LF 580.000 $10.000 $9.900 $8.750 $10.000 $13.760 $23.000 $20.000
REMOV CONC (MISC)
SY 273.000 $50.000 $24.200 $12.150 $25.000 $29.230 $130.000 $60.000
RMV (0"-6") TRT/UNTRT BASE & ASPH PAV
SY 5,577.000 $20.000 $5.610 $15.000 $10.000 $21.460 $21.000 $40.000
RDSIDE AMENITY (REMOV)
EA 5.000 $500.000 $1,100.000 $845.000 $50.000 $1.100 $307.000 $1,000.000
CONC PVMT (CRCP) (10")
SY 991.000 $175.000 $99.000 $163.000 $325.000 $146.790 $225.000 $250.000
CEM STABIL BKFL
CY 42.000 $650.000 $385.000 $195.000 $200.000 $283.570 $171.000 $750.000
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 56.000 $600.000 $550.000 $440.000 $600.000 $495.000 $722.000 $400.000
RIPRAP (CONC)(4 IN)
CY 8.000 $800.000 $671.132 $1,300.000 $650.000 $871.230 $1,682.000 $1,000.000
RAIL (HANDRAIL)(TY C)
LF 36.000 $275.000 $204.600 $222.950 $280.000 $258.500 $325.000 $500.000
RC PIPE (CL III)(24 IN)
LF 122.000 $170.000 $165.000 $306.000 $115.000 $201.300 $410.000 $700.000
JCTBOX(COMPL)(PJB)(3FTX3FT)
EA 2.000 $10,000.000 $4,973.100 $9,110.000 $5,000.000 $9,328.000 $7,870.000 $35,000.000
INLET (COMPL)(PCO)(3FT)(RIGHT)
EA 1.000 $12,000.000 $6,627.500 $10,040.000 $9,500.000 $12,584.000 $21,700.000 $35,000.000
INLET (COMPL)(PCO)(3FT)(BOTH)
EA 1.000 $14,000.000 $7,315.000 $10,780.000 $9,800.000 $14,121.800 $22,356.000 $35,000.000
INLET (COMPL)(TY SIDEWALK BRIDGE)(MOD)
EA 3.000 $15,000.000 $8,800.000 $13,890.000 $10,500.000 $16,500.000 $19,135.000 $35,000.000
SET (TY I) (24 IN) (4: 1) (C)
EA 5.000 $2,000.000 $3,221.460 $4,335.000 $1,800.000 $2,750.000 $5,902.000 $45,000.000
ADJUSTING MANHOLES
EA 3.000 $1,500.000 $1,940.488 $795.000 $1,000.000 $608.000 $7,000.000 $3,000.000
ADJUSTING MANHOLES (UTILITY BOX)
EA 3.000 $1,250.000 $1,012.000 $575.000 $350.000 $608.000 $7,000.000 $4,000.000
REMOV STR (INLET)
EA 1.000 $2,000.000 $1,967.625 $2,210.000 $500.000 $1,306.800 $7,031.000 $1,000.000
REMOV STR (SET)
EA 5.000 $1,000.000 $427.350 $1,875.000 $150.000 $1,320.000 $2,500.000 $1,000.000
REMOV STR (PIPE)
LF 56.000 $100.000 $138.743 $79.000 $12.000 $55.000 $340.000 $15.000
MOBILIZATION
LS 1.000 $325,000.000 $407,440.000 $325,230.000 $277,000.000 $263,302.990 $440,000.000 $540,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 9.000 $10,000.000 $7,150.000 $6,230.000 $2,500.000 $2,200.000 $24,000.000 $58,600.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $5,000.000 $17,600.000 $2,000.000 $5.000 $0.110 $32,782.000 $18,500.000
TMA (STATIONARY)
DAY 150.000 $200.000 $237.875 $20.000 $5.000 $0.110 $200.000 $500.000
TMA (MOBILE OPERATION)
HR 32.000 $110.000 $78.628 $10.000 $5.000 $0.110 $85.000 $95.000
SANDBAGS FOR EROSION CONTROL
EA 32.000 $6.000 $16.830 $12.000 $5.000 $0.110 $33.000 $25.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 277.000 $6.000 $8.800 $9.000 $0.100 $5.500 $16.000 $10.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 277.000 $3.000 $3.300 $2.500 $0.100 $5.500 $5.000 $5.000
COLORED TEXTURED CONC (4")
SY 2,994.000 $150.000 $143.000 $90.500 $125.000 $103.450 $100.000 $150.000
CONC CURB (TY II)
LF 1,925.000 $33.000 $14.663 $15.800 $35.000 $58.880 $52.000 $15.000
CONC CURB & GUTTER (TY II)
LF 1,156.000 $50.000 $38.192 $52.700 $50.000 $58.880 $93.000 $45.000
CONCRETE C&G (VALLEY GUTTER)
LF 126.000 $75.000 $55.000 $111.000 $75.000 $88.000 $100.000 $80.000
DRIVEWAYS (CONC)
SY 4,738.000 $140.000 $101.750 $124.000 $110.000 $124.530 $115.000 $150.000
CONC SIDEWALKS (4")
SY 9,118.000 $90.000 $82.500 $95.200 $100.000 $112.850 $85.000 $110.000
CURB RAMPS (TY 1)
SY 23.000 $140.000 $231.000 $153.000 $130.000 $141.550 $366.000 $225.000
CURB RAMPS (TY 3)
SY 13.000 $155.000 $412.500 $233.000 $130.000 $141.550 $286.000 $225.000
CURB RAMPS (TY 6)
SY 17.000 $155.000 $247.500 $190.000 $130.000 $141.550 $290.000 $225.000
CURB RAMPS (TY 7)
SY 853.000 $155.000 $187.000 $133.000 $130.000 $141.550 $260.000 $180.000
CURB RAMPS (TY 21)
SY 8.000 $155.000 $247.500 $372.000 $130.000 $141.550 $545.000 $350.000
CONC SIDEWALKS (SPECIAL) (TYPE A)
SY 108.000 $155.000 $143.000 $719.000 $350.000 $1,386.170 $208.000 $175.010
CONC SIDEWALKS (SPECIAL) (TYPE B)
SY 377.000 $125.000 $154.000 $111.000 $250.000 $245.300 $180.000 $175.000
CONDT (PVC) (SCH 40) (2")
LF 95.000 $11.000 $24.200 $16.500 $26.350 $11.000 $32.000 $15.000
CONDUIT (PREPARE)
LF 225.000 $3.500 $5.500 $1.100 $5.990 $11.000 $7.500 $1.000
ELEC CONDR (NO.8) BARE
LF 60.000 $3.000 $4.400 $3.020 $4.790 $5.500 $6.000 $3.000
ELEC CONDR (NO.6) BARE
LF 85.000 $3.500 $4.400 $3.300 $4.790 $5.500 $6.000 $3.000
ELEC CONDR (NO.6) INSULATED
LF 130.000 $2.500 $4.400 $3.570 $4.790 $5.500 $6.000 $3.500
ELEC CONDR (NO.2) INSULATED
LF 40.000 $5.500 $13.200 $5.500 $14.380 $5.500 $17.500 $5.000
GROUND BOX TY D (162922)W/APRON
EA 1.000 $2,000.000 $2,420.000 $1,650.000 $2,635.460 $1,100.000 $3,176.000 $1,500.000
GROUND BOX TY BATTERY (162915)W/APRON
EA 4.000 $2,615.000 $4,180.000 $4,400.000 $4,552.170 $4,400.000 $5,487.000 $4,000.000
RELOCATE ELECTRICAL SERVICES
EA 1.000 $2,495.000 $5,170.000 $3,190.000 $5,630.310 $4,400.000 $6,786.000 $2,000.000
ALUMINUM SIGNS (TY A)
SF 311.000 $46.000 $36.300 $36.300 $40.000 $49.500 $52.000 $50.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 50.000 $700.000 $799.700 $800.000 $450.000 $495.000 $1,217.000 $950.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 2.000 $900.000 $1,007.600 $1,007.600 $450.000 $495.000 $1,410.000 $1,100.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 3.000 $1,000.000 $1,012.000 $1,012.000 $450.000 $495.000 $1,377.000 $1,075.000
IN SM RD SN SUP&AM TY10BWG(1)SB(P-BM)
EA 2.000 $900.000 $1,153.900 $1,154.000 $450.000 $495.000 $1,537.500 $1,200.000
IN SM RD SN SUP&AM TY10BWG(1)SB(T)
EA 11.000 $900.000 $1,079.100 $1,079.100 $450.000 $495.000 $1,473.000 $1,150.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 27.000 $400.000 $797.500 $797.500 $250.000 $385.000 $1,089.000 $850.000
REMOVE SM RD SN SUP&AM
EA 8.000 $165.000 $137.500 $193.450 $50.000 $55.000 $160.000 $125.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 4.000 $20.000 $16.500 $129.000 $10.000 $110.000 $19.000 $15.000
PAVEMENT SLER 24"
LF 2,591.000 $1.000 $7.700 $7.700 $8.390 $7.700 $8.500 $7.000
PAVEMENT SLER (ARROW)
EA 1.000 $82.000 $137.500 $137.500 $149.750 $137.500 $145.000 $125.000
PAVEMENT SLER (WORD)
EA 1.000 $112.000 $165.000 $165.000 $179.690 $165.000 $174.000 $150.000
PREFAB PM TY B (W)(24")(SLD)
LF 2,591.000 $17.000 $38.500 $38.500 $41.930 $36.750 $41.000 $35.000
PREFAB PM TY B (W)(ARROW)
EA 1.000 $752.000 $770.000 $770.000 $838.560 $770.000 $813.000 $700.000
PREFAB PM TY B (W)(WORD)
EA 1.000 $1,000.000 $1,100.000 $1,100.000 $1,197.940 $1,100.000 $1,161.000 $1,000.000
ELIM EXT PM & MRKS (24")
LF 776.000 $1.000 $6.600 $6.600 $7.190 $6.600 $7.000 $6.000
ELIM EXT PM & MRKS (ARROW)
EA 1.000 $20.000 $137.500 $137.500 $149.750 $137.500 $145.000 $125.000
ELIM EXT PM & MRKS (WORD)
EA 1.000 $20.000 $165.000 $165.000 $179.690 $165.000 $174.000 $150.000
PAV SURF PREP FOR MRK (24")
LF 2,591.000 $0.500 $4.400 $4.400 $4.790 $4.400 $4.500 $4.000
PAV SURF PREP FOR MRK (ARROW)
EA 1.000 $20.000 $137.500 $137.500 $149.750 $137.500 $145.000 $125.000
PAV SURF PREP FOR MRK (WORD)
EA 1.000 $20.000 $165.000 $165.000 $179.690 $165.000 $174.000 $150.000
VEH SIG SEC (12")LED(YEL)
EA 20.000 $450.000 $342.100 $440.000 $372.560 $440.000 $449.000 $400.000
PED SIG SEC (LED)(COUNTDOWN)
EA 8.000 $1,050.000 $941.600 $825.000 $1,025.440 $1,210.000 $1,236.000 $600.000
TRF SIG CBL (TY A)(14 AWG)(2 CONDR)
LF 920.000 $3.350 $3.300 $2.450 $3.590 $4.400 $4.500 $2.250
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
LF 1,175.000 $4.250 $3.520 $2.450 $3.830 $5.500 $4.500 $2.250
REMOVE RDSD FLASH BEACON ASSEMBLY
EA 4.000 $1,000.000 $1,210.000 $3,575.000 $1,317.730 $1,375.000 $1,588.000 $1,050.000
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
EA 4.000 $8,000.000 $6,490.000 $11,000.000 $7,067.840 $12,600.000 $8,518.000 $7,000.000
INS TRF SIG PL AM (S)1 ARM(28')
EA 2.000 $13,500.000 $18,700.000 $16,500.000 $20,364.970 $17,850.000 $24,544.000 $14,000.000
INS TRF SIG PL AM(S)1 ARM(32')
EA 2.000 $14,000.000 $20,130.000 $17,600.000 $21,922.290 $21,000.000 $26,242.000 $15,000.000
PED POLE ASSEMBLY
EA 4.000 $4,975.000 $4,840.000 $3,630.000 $5,270.930 $10,500.000 $6,353.000 $3,200.000
PED DETECT PUSH BUTTON (APS)
EA 8.000 $1,150.000 $1,430.000 $1,210.000 $1,557.320 $1,650.000 $1,877.000 $825.000
PED DETECTOR CONTROLLER UNIT
EA 1.000 $4,300.000 $5,830.000 $6,600.000 $6,349.070 $4,950.000 $7,652.000 $5,500.000
REMOVAL OF SIGNAL HEAD ASSM
EA 8.000 $100.000 $302.500 $137.500 $329.430 $550.000 $397.000 $125.000
REMOVAL OF PEDESTRIAN PUSH BUTTONS
EA 8.000 $300.000 $101.200 $55.000 $110.210 $55.000 $133.000 $50.000
GROUND BOX (PREPARE)
EA 4.000 $200.000 $424.600 $330.000 $462.410 $1,650.000 $557.000 $300.000
GROUND BOX W/ APRON (ADJUST)
EA 4.000 $1,225.000 $1,430.000 $1,108.800 $1,557.320 $275.000 $1,877.000 $1,008.000
Totals: $3,654,451.250 $3,406,939.206 $3,458,256.250 $3,544,271.530 $3,794,048.810 $4,434,333.000 $5,444,048.830
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $1,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $3,000.00
Total: $4,000.00