|
|
PREPARING ROW
|
AC
|
9.780
|
$250.000
|
$242.590
|
$349.180
|
$365.000
|
$583.650
|
$1,000.000
|
|
|
REMOVE STAB BASE & ASPH PAV (5IN)
|
SY
|
1,981.000
|
$5.500
|
$12.060
|
$8.160
|
$12.800
|
$8.140
|
$20.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
4,868.000
|
$20.000
|
$13.170
|
$20.690
|
$20.000
|
$9.050
|
$20.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
3,534.000
|
$15.000
|
$34.920
|
$13.500
|
$28.000
|
$3.910
|
$24.000
|
|
|
BACKFILL (TY A OR B)
|
STA
|
427.010
|
$200.000
|
$201.250
|
$205.550
|
$230.000
|
$56.170
|
$150.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
AC
|
30.040
|
$537.990
|
$430.280
|
$652.300
|
$600.000
|
$475.190
|
$565.000
|
|
|
DRILL SEEDING (TEMP)(WARM OR COOL)
|
AC
|
30.040
|
$500.000
|
$388.230
|
$458.550
|
$500.000
|
$428.740
|
$475.000
|
|
|
FL BS (CMP IN PLC)(TY A OR B GR 4)(8")
|
SY
|
15,397.000
|
$20.000
|
$20.760
|
$24.890
|
$17.100
|
$16.110
|
$25.000
|
|
|
FL BS (CMP IN PLC)(TY A OR B GR 4)(6")
|
SY
|
17,592.000
|
$15.000
|
$16.350
|
$18.650
|
$15.000
|
$12.670
|
$23.000
|
|
|
REWORK BS MTL (TY B)(12")(DENS CONT)
|
SY
|
9,955.000
|
$10.000
|
$8.720
|
$18.080
|
$11.500
|
$9.070
|
$12.000
|
|
|
REWORK BS MTL (TY B) (14") (DENS CONT)
|
SY
|
7,877.000
|
$12.000
|
$11.550
|
$29.840
|
$12.650
|
$10.180
|
$13.000
|
|
|
CEMENT
|
TON
|
302.000
|
$215.000
|
$205.060
|
$212.740
|
$180.000
|
$243.140
|
$200.000
|
|
|
CEMENT TREAT (SUBGRADE) (8")
|
SY
|
32,428.000
|
$3.660
|
$3.410
|
$3.510
|
$3.200
|
$1.700
|
$4.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
8,110.000
|
$4.740
|
$4.040
|
$4.690
|
$4.100
|
$4.370
|
$5.000
|
|
|
EMULS ASPH (EROSN CONT)(MS-2)
|
GAL
|
14,539.000
|
$4.600
|
$4.680
|
$3.570
|
$4.400
|
$3.250
|
$5.000
|
|
|
ASPH (MULTI OPTION)
|
GAL
|
12,324.000
|
$4.000
|
$4.720
|
$4.020
|
$4.300
|
$3.470
|
$5.000
|
|
|
AGGR(TY-B GR-4 SAC-B)
|
CY
|
294.000
|
$187.260
|
$191.630
|
$209.490
|
$103.250
|
$150.910
|
$200.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(2")
|
SY
|
3,222.000
|
$19.000
|
$22.580
|
$19.630
|
$23.560
|
$20.420
|
$23.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")
|
SY
|
13,112.000
|
$35.000
|
$31.480
|
$33.070
|
$41.400
|
$36.080
|
$40.000
|
|
|
PLANE ASPH CONC PAV(0" TO 1")
|
SY
|
964.000
|
$4.000
|
$7.780
|
$5.110
|
$10.250
|
$5.240
|
$17.000
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
5,019.000
|
$4.000
|
$3.990
|
$3.720
|
$3.500
|
$2.750
|
$7.000
|
|
|
PLANE ASPH CONC PAV (1")
|
SY
|
669.000
|
$4.000
|
$10.350
|
$7.150
|
$7.800
|
$5.400
|
$25.000
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
11,061.000
|
$1.650
|
$2.580
|
$2.550
|
$3.000
|
$1.780
|
$5.000
|
|
|
PLANE ASPH CONC PAV (4")
|
SY
|
8,752.000
|
$3.000
|
$3.900
|
$3.990
|
$4.700
|
$2.720
|
$8.000
|
|
|
PLANE ASPH CONC PAV (2 1/2")
|
SY
|
1,996.000
|
$4.000
|
$8.180
|
$6.040
|
$6.350
|
$5.460
|
$16.000
|
|
|
STRUCT EXCAV (BRIDGE)
|
CY
|
1,191.600
|
$24.000
|
$53.920
|
$33.000
|
$15.000
|
$50.850
|
$10.000
|
|
|
CEM STABIL BKFL
|
CY
|
259.200
|
$242.270
|
$310.970
|
$324.410
|
$210.000
|
$192.640
|
$200.000
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
67.000
|
$240.430
|
$75.490
|
$187.000
|
$185.000
|
$231.610
|
$150.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
320.000
|
$37.590
|
$107.840
|
$165.000
|
$95.000
|
$200.000
|
$160.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
280.000
|
$225.990
|
$490.670
|
$500.500
|
$410.000
|
$718.500
|
$650.000
|
|
|
CL B CONC (FLUME)
|
CY
|
6.000
|
$700.000
|
$916.640
|
$770.000
|
$850.000
|
$1,012.310
|
$650.000
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
65.300
|
$1,550.410
|
$1,509.770
|
$1,540.000
|
$1,500.000
|
$2,017.890
|
$1,500.000
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
5,490.000
|
$30.000
|
$38.820
|
$39.600
|
$36.000
|
$59.070
|
$50.000
|
|
|
APPROACH SLAB (HPC)
|
CY
|
97.900
|
$750.000
|
$943.600
|
$962.500
|
$700.000
|
$1,159.590
|
$750.000
|
|
|
PRESTR CONC GIRDER (TX34)
|
LF
|
805.500
|
$240.000
|
$281.460
|
$287.100
|
$256.000
|
$281.740
|
$275.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
94.000
|
$750.000
|
$916.640
|
$770.000
|
$770.000
|
$1,012.310
|
$729.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
111.700
|
$750.000
|
$727.920
|
$742.500
|
$670.000
|
$952.770
|
$637.000
|
|
|
RAIL (TY SSTR)(HPC)
|
LF
|
216.000
|
$125.000
|
$161.760
|
$165.000
|
$177.500
|
$215.020
|
$169.000
|
|
|
HEADER TYPE EXPANSION JOINT
|
LF
|
122.000
|
$164.290
|
$258.820
|
$264.000
|
$290.000
|
$222.340
|
$100.000
|
|
|
GABIONS (GALV)
|
CY
|
8.000
|
$500.000
|
$862.720
|
$1,034.510
|
$560.000
|
$476.380
|
$875.000
|
|
|
CONC BOX CULV (4 FT X 2 FT)(EXTEND)
|
LF
|
16.000
|
$591.680
|
$970.560
|
$935.000
|
$700.000
|
$1,071.860
|
$585.000
|
|
|
CONC BOX CULV (6 FT X 2 FT) (EXTEND)
|
LF
|
16.000
|
$729.760
|
$1,186.250
|
$1,045.000
|
$1,100.000
|
$1,310.050
|
$750.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
180.000
|
$125.000
|
$172.540
|
$165.000
|
$125.000
|
$190.550
|
$184.580
|
|
|
SET (TY I)(S= 4 FT)(HW= 4 FT)(6:1) (C)
|
EA
|
2.000
|
$10,000.000
|
$13,507.020
|
$12,100.000
|
$12,500.000
|
$14,916.740
|
$8,990.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 6 FT)(6:1) (C)
|
EA
|
2.000
|
$10,000.000
|
$14,828.070
|
$14,300.000
|
$21,000.000
|
$16,375.670
|
$14,200.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
10.000
|
$2,300.000
|
$2,696.010
|
$2,750.000
|
$3,000.000
|
$2,977.390
|
$3,500.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
4.000
|
$1,110.060
|
$1,078.400
|
$1,650.000
|
$2,400.000
|
$1,190.960
|
$1,200.000
|
|
|
REMOV STR (PIPE)
|
LF
|
176.000
|
$50.000
|
$21.570
|
$33.000
|
$30.000
|
$23.820
|
$30.000
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
43.000
|
$150.000
|
$107.840
|
$165.000
|
$150.000
|
$119.100
|
$160.000
|
|
|
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
|
EA
|
1.000
|
$90,000.000
|
$56,131.350
|
$49,500.000
|
$60,000.000
|
$43,314.700
|
$100,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$690,000.000
|
$950,428.910
|
$478,458.620
|
$989,000.000
|
$1,349,675.240
|
$1,090,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
9.000
|
$18,000.000
|
$19,982.750
|
$7,563.070
|
$21,500.000
|
$35,000.000
|
$50,000.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
1,200.000
|
$5.890
|
$5.390
|
$5.840
|
$10.000
|
$5.950
|
$8.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,200.000
|
$2.130
|
$1.080
|
$2.200
|
$5.000
|
$1.190
|
$2.000
|
|
|
PORT CTB (DES SOURCE)(SAFETY SH)
|
LF
|
1,000.000
|
$15.000
|
$24.440
|
$28.250
|
$12.000
|
$15.320
|
$15.000
|
|
|
PORT CTB (MOVE)(SAFETY SH)
|
LF
|
720.000
|
$9.500
|
$13.340
|
$23.070
|
$5.250
|
$10.200
|
$6.000
|
|
|
PORT CTB (STKPL)(SAFETY SH)
|
LF
|
1,000.000
|
$15.000
|
$24.440
|
$28.250
|
$10.400
|
$12.760
|
$11.000
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
85,401.000
|
$0.240
|
$0.120
|
$0.220
|
$0.200
|
$0.120
|
$0.400
|
|
|
RUMBLE STRIPS (CENTERLINE) ASPHALT
|
LF
|
42,701.000
|
$0.190
|
$0.120
|
$0.220
|
$0.250
|
$0.120
|
$0.400
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
3,800.000
|
$30.000
|
$30.630
|
$31.240
|
$40.000
|
$33.820
|
$45.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
8.000
|
$2,031.010
|
$2,205.340
|
$2,249.500
|
$3,060.000
|
$2,435.510
|
$2,900.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
3,760.000
|
$4.560
|
$1.620
|
$1.650
|
$3.200
|
$1.790
|
$3.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
8.000
|
$284.730
|
$161.760
|
$165.000
|
$320.000
|
$178.640
|
$300.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
26.000
|
$3,300.000
|
$3,019.530
|
$3,080.000
|
$3,700.000
|
$3,334.680
|
$3,500.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
26.000
|
$508.830
|
$161.760
|
$165.000
|
$320.000
|
$178.640
|
$300.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$2,274.510
|
$2,264.650
|
$2,310.000
|
$2,640.000
|
$885.390
|
$1,400.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$1,411.080
|
$970.560
|
$990.000
|
$1,055.000
|
$216.710
|
$1,400.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
2.000
|
$17,000.000
|
$10,784.050
|
$11,000.000
|
$7,400.000
|
$12,135.400
|
$22,000.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
21.000
|
$75.000
|
$43.140
|
$37.400
|
$33.800
|
$47.640
|
$32.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
47.000
|
$800.000
|
$862.720
|
$882.200
|
$1,000.000
|
$952.770
|
$950.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
12.000
|
$950.000
|
$970.560
|
$1,053.800
|
$1,160.000
|
$1,071.860
|
$1,100.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
1.000
|
$1,137.820
|
$1,294.090
|
$1,342.000
|
$1,400.000
|
$1,429.150
|
$1,325.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
3.000
|
$1,215.310
|
$1,385.750
|
$1,487.200
|
$1,560.000
|
$1,530.380
|
$1,475.000
|
|
|
RELOCATE SM RD SN SUP&AM(SIGN ONLY)
|
EA
|
12.000
|
$296.500
|
$215.680
|
$247.500
|
$580.000
|
$238.190
|
$550.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
42.000
|
$121.210
|
$107.840
|
$220.000
|
$105.500
|
$119.100
|
$696.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
167.000
|
$38.290
|
$30.200
|
$30.800
|
$47.500
|
$33.350
|
$45.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
42.000
|
$137.650
|
$124.020
|
$136.400
|
$160.000
|
$136.960
|
$150.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
2,750.000
|
$0.600
|
$0.810
|
$0.830
|
$0.800
|
$0.890
|
$0.750
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(DOT)
|
LF
|
675.000
|
$1.000
|
$1.080
|
$1.100
|
$1.050
|
$1.190
|
$1.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
45,696.000
|
$0.500
|
$0.510
|
$0.520
|
$0.500
|
$0.560
|
$0.470
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
600.000
|
$0.600
|
$1.080
|
$1.100
|
$1.050
|
$1.190
|
$1.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
20,270.000
|
$0.500
|
$0.540
|
$0.550
|
$0.550
|
$0.600
|
$0.500
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
840.000
|
$1.040
|
$1.110
|
$2.190
|
$1.200
|
$2.380
|
$1.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
4,325.000
|
$1.040
|
$1.130
|
$2.190
|
$1.250
|
$2.380
|
$1.000
|
|
REFL PAV MRK TY I (W)4"(DOT)(090MIL)
|
LF
|
1,352.000
|
$1.000
|
$1.080
|
$1.100
|
$1.050
|
$1.190
|
$1.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
270.000
|
$3.000
|
$1.080
|
$1.100
|
$1.050
|
$1.190
|
$1.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
|
LF
|
452.000
|
$12.000
|
$9.710
|
$9.900
|
$9.500
|
$10.720
|
$9.000
|
|
REFL PAV MRK TY I (W)(ARROW)(090MIL)
|
EA
|
12.000
|
$300.000
|
$215.680
|
$220.000
|
$210.000
|
$238.190
|
$200.000
|
|
REFL PAV MRK TY I (W)(WORD)(090MIL)
|
EA
|
3.000
|
$300.000
|
$323.520
|
$330.000
|
$320.000
|
$357.290
|
$300.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
567.000
|
$4.000
|
$4.310
|
$4.400
|
$4.200
|
$4.760
|
$4.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
2,344.000
|
$5.000
|
$3.240
|
$3.300
|
$3.200
|
$3.570
|
$3.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
21,120.000
|
$0.810
|
$1.080
|
$1.100
|
$1.050
|
$1.190
|
$1.000
|
|
|
TREE REMOVAL (4" - 12" DIA)
|
EA
|
56.000
|
$750.000
|
$266.050
|
$583.000
|
$700.000
|
$768.010
|
$600.000
|
|
|
D-GR HMA TY-B SAC-B PG64-22
|
TON
|
5,352.000
|
$110.000
|
$114.180
|
$101.160
|
$110.400
|
$98.550
|
$110.000
|
|
|
SP MIXES SP-D SAC-A PG70-28
|
TON
|
31,917.000
|
$117.000
|
$101.380
|
$115.700
|
$113.250
|
$110.920
|
$135.000
|
|
|
TACK COAT
|
GAL
|
37,443.000
|
$5.500
|
$8.680
|
$5.300
|
$5.400
|
$4.910
|
$4.500
|
|
|
INSTALL BRIDGE IDENTIFICATION NUMBERS
|
EA
|
2.000
|
$200.000
|
$485.280
|
$495.000
|
$450.000
|
$821.720
|
$500.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$16,000.000
|
$10,784.050
|
$9,021.800
|
$20,000.000
|
$7,671.900
|
$15,000.000
|
|
|
HPPM W/RET REQ TY I(W)4"(BRK)(090MIL)
|
LF
|
10,993.000
|
$0.550
|
$0.540
|
$0.550
|
$0.550
|
$0.600
|
$0.500
|
|
|
HPPM W/RET REQ TY I(W)4"(SLD)(090MIL)
|
LF
|
88,466.000
|
$0.530
|
$0.500
|
$0.510
|
$0.500
|
$0.550
|
$0.460
|
|
|
HPPM W/RET REQ TY I(Y)4"(BRK)(090MIL)
|
LF
|
4,628.000
|
$0.550
|
$0.530
|
$0.540
|
$0.500
|
$0.580
|
$0.490
|
|
|
HPPM W/RET REQ TY I(Y)4"(SLD)(090MIL)
|
LF
|
72,443.000
|
$0.530
|
$0.500
|
$0.510
|
$0.500
|
$0.550
|
$0.460
|
|
|
TMA (STATIONARY)
|
DAY
|
145.000
|
$350.000
|
$215.680
|
$383.310
|
$550.000
|
$449.190
|
$300.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
144.000
|
$92.930
|
$97.060
|
$102.410
|
$90.000
|
$89.660
|
$95.000
|
|
Totals: |
$9,350,960.667
|
$9,504,385.154
|
$9,569,172.412
|
$9,896,007.220
|
$10,066,784.621
|
$11,495,593.180
|