Show Job Controls
Bid Cobra

HUTCHINSON SH 136 (0356-01-108)

Items: 84

County: HUTCHINSON
Length: N/A
Highway: SH 136
District: AMARILLO
Control Number: 0356-01-108
DBE Goal: 500.0%
Project: F 2024(462)
Guaranty: N/A
Time: 263 WORKING DAYS
Engineer's Estimate: $5,113,346.50
Date: 12/06/2023 (2 years ago)
Contract Number: N/A
Type: CONSTRUCT PEDESTRIAN INFRASTRUCTURE
Mail/Deliver Bids To: N/A
BERNARDO FERREL
BRANDON BILBREY
KENNETH PETR
DARRELL CALDWELL
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$5,113,346.50
$4,885,721.30
Over/Under Est: -4.45% -$227,625.20
$5,140,008.97
Over/Under Est: 0.52% $26,662.47
Amt Left: 5.2% $254,287.67
Over/Under Est: 2.2% $112,378.81
Amt Left: 6.96% $340,004.01
Delta: -1.67% -$85,716.34
$6,868,060.00
Over/Under Est: 34.32% $1,754,713.50
Amt Left: 40.57% $1,982,338.70
Delta: -31.43% -$1,642,334.69
$6,939,813.76
Over/Under Est: 35.72% $1,826,467.26
Amt Left: 42.04% $2,054,092.46
Delta: -1.04% -$71,753.76
Subcontractor Percentage Amount
ONE WAY CONCRETE CONSTRUCTION, LLC 31.75% $1,551,216.51
APOLLO CONSTRUCTORS, INC. 3.30% $161,228.80
TRP CONSTRUCTION GROUP, LLC 1.71% $83,545.83
BARRICADES UNLIMITED 0.57% $27,848.61
Total: 37.33% $1,823,839.75

Bid Items & Bid Tabulations

84 Total 0 of 84
HUTCHINSON  |  SH 136  |  AMARILLO  |  0356-01-108  |  12/06/2023  |  $5,113,346.50  |  F 2024(462)  |  CONSTRUCT PEDESTRIAN INFRASTRUCT  |  263 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TI-ZACK CONCRETE, INC.
DIGG COMMERCIAL, LLC
L A FULLER & SONS CONSTRUCTION, LTD.
FNH CONSTRUCTION, LLC
GILVIN-TERRILL, LTD.
REMOVING CONC (DRIVEWAYS)
SY 2,668.000 $22.000 $25.000 $23.200 $26.990 $50.000 $30.000
REMOVING CONC (SIDEWALK OR RAMP)
SY 357.000 $20.000 $20.000 $32.000 $25.770 $50.000 $30.000
REMOVING STAB BASE & ASPH PAV (0-6")
SY 4,683.000 $10.000 $20.000 $10.000 $21.320 $50.000 $30.000
EXCAVATION (SPECIAL)
CY 320.000 $50.000 $25.000 $45.000 $47.390 $100.000 $100.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 320.000 $50.000 $25.000 $48.000 $50.390 $100.000 $100.000
FURNISHING AND PLACING TOPSOIL (4")
SY 8,395.000 $9.000 $3.000 $9.000 $13.180 $20.000 $20.000
BLOCK SODDING
SY 8,395.000 $9.000 $8.000 $11.000 $7.810 $10.000 $20.000
VEGETATIVE WATERING
MG 121.400 $50.000 $1.000 $28.800 $228.140 $100.000 $15.000
PLAN & TEXT ASPH CONC PAV(0" TO 2")
SY 600.000 $5.000 $13.000 $25.000 $10.790 $20.000 $50.000
CUT & RESTORE ASPH PAVING
SY 2,578.000 $150.000 $90.000 $160.000 $107.710 $220.000 $125.000
CL A CONC (MISC)
CY 40.000 $600.000 $900.000 $744.000 $732.890 $2,000.000 $1,200.000
RIPRAP (MOW STRIP)(4 IN)
CY 66.000 $750.000 $900.000 $700.000 $859.300 $650.000 $1,000.000
RAIL (HANDRAIL)(TY E)
LF 1,264.000 $200.000 $165.000 $128.000 $192.920 $250.000 $200.000
GRATE & FRAME
EA 8.000 $2,600.000 $3,000.000 $1,980.000 $3,748.940 $8,500.000 $3,500.000
MOBILIZATION
LS 1.000 $350,000.000 $480,000.000 $300,000.000 $525,505.740 $680,000.000 $690,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 15.000 $15,000.000 $4,000.000 $6,370.000 $8,457.150 $8,500.000 $30,000.000
SANDBAGS FOR EROSION CONTROL
EA 500.000 $7.000 $0.010 $30.000 $22.260 $10.000 $10.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 4,550.000 $8.000 $0.010 $7.000 $6.950 $4.000 $10.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 4,550.000 $1.000 $0.010 $3.000 $1.550 $2.000 $5.500
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 4,000.000 $12.000 $0.010 $7.000 $9.780 $18.000 $12.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 4,000.000 $1.000 $0.010 $3.000 $2.020 $9.000 $6.000
COLORED TEXTURED CONC (4")
SY 45.000 $150.000 $190.000 $96.000 $111.100 $250.000 $200.000
CONC CURB (TY II)
LF 66.000 $30.000 $42.000 $56.000 $46.410 $55.000 $60.000
CONC CURB & GUTTER (TY II)
LF 388.000 $60.000 $50.000 $38.000 $52.850 $65.000 $60.000
CONC CURB (TY C1)
LF 51.000 $150.000 $270.000 $120.000 $128.460 $100.000 $165.000
CONC CURB (TY F1)
LF 1,220.000 $120.000 $125.000 $90.000 $162.390 $100.000 $150.000
CONC CURB (TY F3)
LF 95.000 $200.000 $300.000 $169.000 $226.380 $100.000 $250.000
CONC CURB & GUTTER (SLOTTED)
LF 6,189.000 $55.000 $45.000 $42.000 $40.610 $85.000 $70.000
DRIVEWAYS (CONC)
SY 7,898.000 $115.000 $120.000 $101.000 $158.020 $105.000 $140.000
CONC SIDEWALKS (4")
SY 13,913.000 $90.000 $105.000 $64.000 $66.260 $75.000 $116.800
CONC SIDEWALKS (5")
SY 220.000 $97.000 $105.000 $77.000 $66.400 $85.000 $125.000
CURB RAMPS (TY 1)
SY 489.000 $175.000 $140.000 $174.000 $153.010 $325.000 $200.000
CURB RAMPS (TY 2)
SY 69.000 $175.000 $140.000 $200.000 $135.290 $325.000 $220.000
CURB RAMPS (TY 3)
SY 17.000 $175.000 $140.000 $290.000 $209.380 $325.000 $220.000
CURB RAMPS (TY 5)
SY 22.000 $175.000 $140.000 $270.000 $170.500 $325.000 $220.000
CURB RAMPS (TY 6)
SY 10.000 $175.000 $140.000 $308.000 $202.870 $325.000 $220.000
CURB RAMPS (TY 7)
SY 537.000 $175.000 $140.000 $153.000 $125.510 $325.000 $200.000
CURB RAMPS (TY 10)
SY 105.000 $175.000 $14.000 $176.000 $141.660 $325.000 $200.000
CURB RAMPS (TY 21)
SY 27.000 $175.000 $140.000 $262.000 $145.290 $325.000 $200.000
CURB RAMPS (TY 22)
SY 91.000 $175.000 $140.000 $178.000 $267.740 $325.000 $200.000
CONC SIDEWALKS (SPECIAL) (TYPE A)
SY 36.000 $250.000 $1,600.000 $424.000 $640.470 $150.000 $350.000
MTL W-BEAM GD FEN (STEEL POST)
LF 788.000 $35.000 $35.000 $32.000 $52.870 $45.000 $35.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 5.000 $1,200.000 $2,500.000 $1,600.000 $1,692.840 $2,500.000 $1,500.000
REMOVE METAL BEAM GUARD FENCE
LF 777.000 $5.000 $10.000 $4.000 $3.030 $6.000 $2.000
REMOVE TERMINAL ANCHOR SECTION
EA 10.000 $250.000 $500.000 $400.000 $1,888.430 $650.000 $200.000
GUARDRAIL END TREATMENT (INSTALL)
EA 5.000 $2,700.000 $3,500.000 $3,200.000 $3,617.690 $4,000.000 $3,350.000
MAILBOX INSTALL-S (TWG-POST) TY 2
EA 1.000 $260.000 $165.000 $400.000 $641.970 $850.000 $350.000
CONDT (PVC) (SCH 40) (2")
LF 300.000 $18.000 $25.000 $26.240 $20.230 $100.000 $15.000
ELEC CONDR (NO.8) BARE
LF 300.000 $2.000 $3.500 $3.460 $3.370 $10.000 $2.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 5.000 $900.000 $300.000 $720.000 $1,293.570 $1,850.000 $1,000.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 3.000 $1,100.000 $400.000 $1,200.000 $1,396.090 $1,850.000 $1,100.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 17.000 $1,100.000 $350.000 $800.000 $1,504.000 $1,850.000 $1,150.000
REMOVE SM RD SN SUP&AM
EA 41.000 $100.000 $55.000 $240.000 $166.910 $850.000 $100.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 2,759.000 $2.000 $1.750 $1.840 $2.160 $6.000 $1.600
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 774.000 $4.000 $3.300 $3.450 $4.050 $8.000 $3.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 2,693.000 $10.000 $7.500 $7.760 $9.100 $15.000 $6.750
REF PAV MRK TY I(W)18"(YLD TRI)(100MIL)
EA 63.000 $40.000 $6.000 $6.330 $7.420 $50.000 $5.500
PAVEMENT SEALER 8"
LF 2,759.000 $1.000 $0.350 $0.380 $0.450 $3.000 $0.330
PAVEMENT SEALER 12"
LF 774.000 $3.000 $0.600 $0.630 $0.740 $3.000 $0.550
PAVEMENT SEALER 24"
LF 2,693.000 $5.000 $1.100 $1.150 $1.350 $6.000 $1.000
PAVEMENT SEALER (YLD TRI)
EA 63.000 $10.000 $20.000 $20.700 $24.280 $15.000 $18.000
ELIM EXT PAV MRK & MRKS (8")
LF 556.000 $1.000 $1.500 $1.480 $1.740 $3.000 $1.290
ELIM EXT PAV MRK & MRKS (12")
LF 1,739.000 $1.000 $2.200 $2.300 $2.700 $4.000 $2.000
ELIM EXT PAV MRK & MRKS (24")
LF 296.000 $3.000 $3.300 $3.450 $4.050 $5.000 $3.000
ELIM EXT PAV MRK & MRKS (18")(YLD TRI)
EA 43.000 $10.000 $25.000 $25.300 $29.680 $15.000 $22.000
PAV SURF PREP FOR MRK (8")
LF 2,211.000 $0.500 $0.300 $0.350 $0.400 $2.000 $0.300
PAV SURF PREP FOR MRK (12")
LF 623.000 $1.000 $0.500 $0.580 $0.670 $3.000 $0.500
PAV SURF PREP FOR MRK (24")
LF 2,104.000 $1.000 $0.800 $0.860 $1.010 $5.000 $0.750
PAV SURF PREP FOR MRK (18")(YLD TRI)
EA 63.000 $10.000 $20.000 $23.000 $26.980 $50.000 $20.000
INSTALL HWY TRF SIG (UPGRADE)
EA 3.000 $11,000.000 $5,225.000 $12,813.010 $3,372.200 $125,000.000 $15,400.000
PED SIG SEC (LED)(COUNTDOWN)
EA 16.000 $800.000 $1,000.000 $798.550 $1,348.880 $6,500.000 $960.000
TRF SIG CBL (TY A)(14 AWG)(2 CONDR)
LF 3,250.000 $2.000 $6.000 $3.130 $2.700 $6.000 $4.250
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
LF 3,250.000 $4.000 $8.000 $3.560 $3.370 $6.000 $4.500
PED POLE ASSEMBLY
EA 5.000 $4,000.000 $5,000.000 $4,845.740 $4,721.070 $2,850.000 $6,815.000
PED DETECT PUSH BUTTON (APS)
EA 17.000 $1,000.000 $1,000.000 $1,423.440 $1,146.550 $1,850.000 $1,971.000
PED DETECTOR CONTROLLER UNIT
EA 2.000 $4,000.000 $5,000.000 $4,561.810 $5,395.520 $6,500.000 $6,165.000
REPLACE OF GROUND BOXES
EA 10.000 $2,100.000 $2,700.000 $1,864.190 $2,023.320 $1,000.000 $2,250.000
REMOVAL OF SIGNAL HEAD ASSM
EA 16.000 $300.000 $330.000 $406.840 $168.610 $1,000.000 $500.000
REMOVAL OF PEDESTRIAN PUSH BUTTONS
EA 17.000 $200.000 $250.000 $135.650 $134.890 $500.000 $165.000
D-GR HMA TY-D PG70-22 (LEVEL-UP)
TON 100.000 $300.000 $300.000 $271.000 $425.450 $500.000 $500.000
TACK COAT
GAL 13.000 $50.000 $10.000 $100.000 $31.660 $10.000 $20.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $13,000.000 $1.000 $12,438.400 $35,564.040 $20,000.000 $18,500.000
TMA (STATIONARY)
DAY 200.000 $300.000 $1.000 $4,500.000 $246.360 $250.000 $550.000
TMA (MOBILE OPERATION)
HR 80.000 $200.000 $1.000 $200.000 $124.040 $85.000 $95.000
Totals: $5,113,346.500 $4,885,721.300 $5,140,008.970 $5,225,725.316 $6,868,060.000 $6,939,813.760