Show Job Controls
Bid Cobra

HUNT IH0030 (6492-30-001)

Items: 45

County: HUNT
Length: 0.0100 MILES
Highway: IH0030
District: PARIS
Control Number: 6492-30-001
DBE Goal: 0.0%
Project: RMC - A00218062
Guaranty: $19,000.00
Time: 365 CALENDAR DAYS
Engineer's Estimate: $954,090.00
Date: 02/19/2026 (3 months ago)
Contract Number: 2260102
Type: METAL BEAM GUARD FENCE REPAIR
Project ID: A00218062
Project Description: ON CALL METAL BEAM GUARD FENCE REPAIR FOR GREENVILLE AREA OFFICE AND SULPHUR SPRINGS AREA OFFICE.
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: MAINTENANCE CONTRACT OFFICE
3500 SW LOOP 286, PARIS, TX 75460
DARIUS HAGGARD
JESSE HERRERA
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$954,090.00
1
$607,439.00
Over/Under Est: -36.33% -$346,651.00
Over/Under Est: -36.19% -$345,269.00
Amt Left: 0.23% $1,382.00
Over/Under Est: -27.41% -$261,475.00
Amt Left: 14.02% $85,176.00
Delta: -13.76% -$83,794.00
$1,204,275.10
Over/Under Est: 26.22% $250,185.10
Amt Left: 98.25% $596,836.10
Delta: -73.87% -$511,660.10

Bid Items & Bid Tabulations

45 Total 0 of 45
HUNT  |  IH0030  |  PARIS  |  6492-30-001  |  02/19/2026  |  $954,090.00  |  RMC - A00218062  |  METAL BEAM GUARD FENCE REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
CATOCON, INC.
BK FIELD OPERATIONS LLC
AUSTIN BARRICADE COMPANY, L.L.C.
AAD CONTRACTING INC.
RIPRAP (MOW STRIP)(4 IN)
CY 50.000 $850.000 $50.000 $1.000 $55.000 $400.000
MOBILIZATION (CALLOUT)
EA 85.000 $534.000 $1.000 $1.000 $1.000 $1,000.000
TMA (STATIONARY)
DAY 75.000 $150.000 $100.000 $1.000 $1.000 $100.000
MTL W-BEAM GD FEN (STEEL POST)
LF 5,000.000 $30.000 $12.000 $6.000 $12.000 $26.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 10.000 $1,500.000 $100.000 $1,200.000 $100.000 $1,700.000
MTL BEAM GD FEN TRANS (TL2)
EA 3.000 $1,000.000 $25.000 $1.000 $100.000 $1,100.000
MTL BEAM GD FEN TRANS (T101)
EA 3.000 $1,100.000 $25.000 $1.000 $100.000 $1,400.000
MTL W-BEAM GD FEN ADJUSTMENT
LF 750.000 $6.000 $1.000 $1.000 $3.000 $10.000
REMOVE METAL BEAM GUARD FENCE
LF 5,000.000 $1.000 $0.250 $8.000 $0.010 $1.000
REMOVE TERMINAL ANCHOR SECTION
EA 15.000 $150.000 $1.000 $1.000 $50.000 $100.000
GUARDRAIL END TREATMENT (INSTALL)
EA 50.000 $1,750.000 $500.000 $25.000 $800.000 $3,300.000
GUARDRAIL END TREATMENT (MOVE & RESET)
EA 5.000 $400.000 $1.000 $1.000 $100.000 $1,000.000
GUARDRAIL END TREATMENT (REMOVE)
EA 15.000 $450.000 $100.000 $1.000 $900.000 $200.000
CRASH CUSH ATTEN (DES SOURCE)
EA 2.000 $2,000.000 $50.000 $1.000 $300.000 $200.000
CRASH CUSH ATTEN (INSTL)(L)(W)(TL2)
EA 2.000 $10,000.000 $2,000.000 $7,500.000 $9,000.000 $11,000.000
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
EA 50.000 $50.000 $1.000 $1.000 $18.000 $90.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 100.000 $5.000 $1.000 $5.000 $18.000 $25.000
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 60.000 $45.000 $1.000 $1.000 $1.000 $25.000
REPLACE RAIL ELEMENT (W-BEAM)
LF 3,000.000 $50.000 $60.000 $48.500 $61.000 $15.000
REPLACE RAIL ELEMENT (THRIE-BEAM)
LF 1,000.000 $50.000 $5.000 $1.000 $1.000 $30.000
REPL RAIL ELMNT(THRIE-BM TRANS TO W-BM)
EA 100.000 $32.000 $10.000 $1.000 $10.000 $300.000
REPLACE TIMBER POST W/O CONC FND
EA 250.000 $25.000 $30.000 $1.000 $77.000 $50.000
REPLACE STEEL POST W/O CONC FND
EA 250.000 $45.000 $40.000 $1.000 $55.000 $75.000
REPLACE TIMBER POST W/ CONC FND
EA 75.000 $30.000 $40.000 $1.000 $80.000 $75.000
REPLACE STEEL POST W/ CONC FND
EA 50.000 $65.000 $200.000 $250.000 $77.000 $100.000
REALIGN POSTS
EA 300.000 $30.000 $30.000 $1.000 $50.000 $25.000
REPLACE TERMINAL ANCHOR POSTS
EA 20.000 $50.000 $1.000 $1.000 $100.000 $500.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 60.000 $900.000 $1,000.000 $2,100.000 $1,000.000 $1,500.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 3,500.000 $25.000 $35.000 $10.000 $39.000 $33.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 500.000 $60.000 $100.000 $1.000 $1.000 $40.000
REPLACE BLOCKOUT
EA 200.000 $30.000 $50.000 $600.000 $200.000 $25.000
REPAIR STEEL POST WITH BASE PLATE
EA 10.000 $200.000 $150.000 $100.000 $100.000 $500.000
RESET SGT IMPACT HEAD
EA 10.000 $30.000 $185.000 $1,400.000 $300.000 $750.000
REPLACE SGT CABLE ANCHOR
EA 40.000 $80.000 $200.000 $200.000 $50.000 $200.000
REPLACE SGT STRUT
EA 15.000 $90.000 $200.000 $750.000 $1,023.000 $200.000
RAISE RAIL
LF 3,000.000 $3.000 $2.000 $0.100 $1.000 $10.000
REPAIR RAIL ELEMENT (CURVED RAIL)
LF 200.000 $27.000 $20.000 $12.000 $1.000 $25.000
REPLACE (REACT) WIDE
EA 2.000 $3,500.000 $1,000.000 $1.000 $500.000 $50,000.000
REPLACE (NARROW TRACC)
EA 2.000 $13,000.000 $1,000.000 $1.000 $10,000.000 $35,000.000
REPAIR (WIDE TRACC)
LF 3.000 $3,500.000 $1,000.000 $1.000 $500.000 $10,000.000
REPAIR (REACT)(N)(CYLINDER ONLY)
EA 2.000 $2,500.000 $1,000.000 $1.000 $1,500.000 $10,000.000
REPLACE (QUAD)(N)(M)
EA 1.000 $25,000.000 $1,000.000 $29,000.000 $10,000.000 $26,000.000
REPAIR (QUAD)(W)(M)
LF 1.000 $30,000.000 $1,000.000 $1,500.000 $1,000.000 $0.100
REPAIR (CATCB FRONT SECTION)
EA 2.000 $2,500.000 $1.000 $1.000 $2,900.000 $5,000.000
REPAIR (CATCB REAR SECTION)
EA 2.000 $1,250.000 $1.000 $1.000 $500.000 $5,000.000
Totals: $954,090.000 $607,439.000 $608,821.000 $692,615.000 $1,204,275.100