Show Job Controls
Bid Cobra

HUNT IH0030 (6354-88-001)

Items: 48

County: HUNT
Length: N/A
Highway: IH0030
District: PARIS
Control Number: 6354-88-001
DBE Goal: N/A
Project: RMC - 635488001
Guaranty: N/A
Time: 365 CALENDAR DAYS
Engineer's Estimate: $720,650.00
Date: 06/04/2020 (6 years ago)
Contract Number: N/A
Type: ON CALL METAL BEAM GUARD FENCE REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$720,650.00
1
$611,418.00
Over/Under Est: -15.16% -$109,232.00
Over/Under Est: -2.46% -$17,750.00
Amt Left: 14.96% $91,482.00
Over/Under Est: -0.09% -$640.00
Amt Left: 17.76% $108,592.00
Delta: -2.43% -$17,110.00
Over/Under Est: 13.92% $100,322.50
Amt Left: 34.27% $209,554.50
Delta: -14.02% -$100,962.50

Bid Items & Bid Tabulations

48 Total 0 of 48
HUNT  |  IH0030  |  PARIS  |  6354-88-001  |  06/04/2020  |  $720,650.00  |  RMC - 635488001  |  ON CALL METAL BEAM GUARD FENCE REPAI...  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
CATOCON, INC.
ELITE CASTLE RESOURCES LLC
JCW CONSTRUCTION, LLC
SJ&J CONSTRUCTION, LLC
RIPRAP (MOW STRIP)(4 IN)
CY 30.000 $500.000 $200.000 $400.000 $50.000 $700.000
MOBILIZATION (CALLOUT)
EA 75.000 $250.000 $1.000 $350.000 $250.000 $1,250.000
MTL W-BEAM GD FEN (STEEL POST)
LF 3,000.000 $30.000 $26.000 $28.000 $32.000 $29.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 10.000 $1,500.000 $500.000 $1,200.000 $1,500.000 $1,552.500
MTL BEAM GD FEN TRANS (TL2)
EA 10.000 $1,000.000 $100.000 $500.000 $300.000 $1,800.000
MTL BEAM GD FEN TRANS (T101)
EA 10.000 $1,100.000 $100.000 $500.000 $250.000 $1,200.000
MTL W-BEAM GD FEN ADJUSTMENT
LF 500.000 $6.000 $3.000 $8.000 $6.000 $8.500
REMOVE METAL BEAM GUARD FENCE
LF 5,000.000 $3.000 $1.000 $0.250 $1.000 $4.500
REMOVE TERMINAL ANCHOR SECTION
EA 10.000 $200.000 $100.000 $200.000 $500.000 $202.500
GUARDRAIL END TREATMENT (INSTALL)
EA 30.000 $1,750.000 $2,600.000 $3,000.000 $3,500.000 $2,802.500
GUARDRAIL END TREATMENT (MOVE & RESET)
EA 5.000 $400.000 $1.000 $500.000 $100.000 $1,200.000
GUARDRAIL END TREATMENT (REMOVE)
EA 15.000 $450.000 $870.000 $50.000 $250.000 $202.500
CRASH CUSH ATTEN (DES SOURCE)
EA 2.000 $2,000.000 $500.000 $2,000.000 $1,000.000 $2,002.500
CRASH CUSHION ATTEN (INSTALL) (TRACC)
EA 2.000 $10,000.000 $2,000.000 $12,500.000 $1,500.000 $11,282.500
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND
EA 50.000 $50.000 $19.000 $30.000 $30.000 $32.500
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 60.000 $45.000 $20.000 $20.000 $1.000 $27.500
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 100.000 $5.000 $10.000 $30.000 $15.750 $32.500
REPAIR RAIL ELEMENT (W - BEAM)
LF 2,000.000 $25.000 $48.000 $28.000 $16.000 $29.500
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 500.000 $25.000 $10.000 $10.000 $35.000 $22.500
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 100.000 $32.000 $26.000 $10.000 $20.000 $27.500
REPAIR RAIL ELEMENT (CURVED RAIL)
LF 200.000 $27.000 $22.000 $18.000 $30.000 $24.500
RAISE RAIL ELEMENT
LF 1,500.000 $1.500 $4.000 $5.000 $2.500 $6.500
REM / REPL TIMBER / STL POST W/CONC FND
EA 125.000 $60.000 $40.000 $40.000 $80.000 $47.500
REM / REPL TIMBER POST W / O CONC FND
EA 100.000 $55.000 $30.000 $40.000 $40.000 $37.500
REM / REPL STEEL POST W / O CONC FND
EA 250.000 $45.000 $40.000 $45.000 $60.000 $42.500
REM / REPL STEEL POST W / CONC FND
EA 50.000 $65.000 $60.000 $40.000 $60.000 $42.500
REPAIR STEEL POST WITH BASE PLATE
EA 10.000 $200.000 $400.000 $200.000 $500.000 $177.500
REALIGN POSTS
EA 250.000 $15.000 $8.000 $20.000 $25.000 $17.500
REMOVE & REPLACE BLOCKOUT
EA 150.000 $15.000 $146.000 $50.000 $50.000 $22.500
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 2,500.000 $25.000 $42.000 $20.000 $25.000 $27.500
REPLACE SINGLE GDRAIL TERMINAL POST
EA 400.000 $60.000 $1.000 $100.000 $75.000 $62.500
REPLACE TERMINAL ANCHOR POSTS
EA 20.000 $50.000 $200.000 $100.000 $200.000 $52.500
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 60.000 $1,050.000 $1,000.000 $900.000 $875.000 $852.500
REM & RESET SGT IMPACT HEAD
EA 10.000 $30.000 $1.000 $250.000 $100.000 $22.500
REPLACE SGT CABLE ANCHOR
EA 40.000 $80.000 $100.000 $40.000 $5.000 $92.500
REPLACE SGT STRUT
EA 15.000 $90.000 $130.000 $50.000 $5.000 $92.500
REMOVE AND REPLACE (TRACC)
EA 4.000 $17,500.000 $9,000.000 $10,000.000 $10,000.000 $11,252.500
REMOVE AND REPLACE (NARROW REACT 350)
EA 1.000 $25,000.000 $1.000 $20,000.000 $15,000.000 $19,002.500
REMOVE AND REPLACE (WIDE REACT 350)
EA 1.000 $30,000.000 $10,000.000 $32,000.000 $30,000.000 $28,602.500
REPAIR (TRACC)
EA 3.000 $3,500.000 $3,000.000 $3,500.000 $5,000.000 $2,402.500
REPAIR (CATCB - FRNT SECT)
EA 2.000 $2,500.000 $1,000.000 $2,500.000 $100.000 $4,002.500
REPAIR (CATCB - REAR SECT)
EA 2.000 $1,250.000 $100.000 $2,500.000 $100.000 $1,202.500
REPAIR (CATGR - FRONT SECTION)
EA 2.000 $1,750.000 $1,000.000 $3,000.000 $2,500.000 $1,952.500
REPAIR (CATGR - END SECTION)
EA 1.000 $2,500.000 $100.000 $1,000.000 $1,500.000 $2,502.500
REMOVE AND REPLACE (CATGR)
EA 1.000 $6,000.000 $6,000.000 $5,000.000 $5,500.000 $5,002.500
REPAIR (REACT 350) (W)
EA 2.000 $3,500.000 $5,000.000 $3,500.000 $1,500.000 $3,502.500
REPAIR (NARROW REACT 350)
EA 2.000 $2,500.000 $1.000 $2,500.000 $100.000 $2,002.500
TMA (STATIONARY)
DAY 75.000 $250.000 $1.000 $350.000 $1,000.000 $202.500
Totals: $720,650.000 $611,418.000 $702,900.000 $720,010.000 $820,972.500