HUNT VARIOUS (0901-22-130)

Items: 27

County: HUNT
Length: 0.0000 MILES
Highway: VARIOUS
District: PARIS
Control Number: 0901-22-130
DBE Goal: 2.0%
Project: STP 2B24(573)TAPS
Guaranty: $11,000.00
Time: 81 WORKING DAYS
Engineer's Estimate: $542,394.20
Date: 08/07/2025 (10 months ago)
Contract Number: 8253024
Type: CONSTRUCT PEDESTRIAN INFRASTRUCTURE
Project ID: A00206379
Contract Type: Federal
Project Description: THE PROJECT WILL CONSTRUCT APPROXIMATELY 2,850 LF OF 5-FOOT-WIDE SIDEWALKS FROM S. CHURCH ST. TO COLLEGE STREET/CLARDY DRIVE TO A.E. BUTLER INTERMEDIATE SCHOOL. PROJECT WILL ALSO INCLUDE A SEGMENT OF SIDEWALK ON E. KIRBY ST. FROM COLLEGE ST. TO SH34.
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
DARIUS HAGGARD
WILLIE BOLDEN
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (12)
E
Engineer's Estimate
$542,394.20
$482,000.00
Over/Under Est: -11.13% -$60,394.20
Over/Under Est: -2.19% -$11,855.21
Amt Left: 10.07% $48,538.99
Over/Under Est: -1.39% -$7,554.20
Amt Left: 10.96% $52,840.00
Delta: -0.81% -$4,301.01
Over/Under Est: 8.71% $47,246.80
Amt Left: 22.33% $107,641.00
Delta: -10.25% -$54,801.00
Over/Under Est: 19.56% $106,066.50
Amt Left: 34.54% $166,460.70
Delta: -9.98% -$58,819.70
Over/Under Est: 22.26% $120,731.24
Amt Left: 37.58% $181,125.44
Delta: -2.26% -$14,664.74
$687,343.75
Over/Under Est: 26.72% $144,949.55
Amt Left: 42.6% $205,343.75
Delta: -3.65% -$24,218.31
Over/Under Est: 27.59% $149,651.30
Amt Left: 43.58% $210,045.50
Delta: -0.68% -$4,701.75
Over/Under Est: 28.62% $155,218.83
Amt Left: 44.73% $215,613.03
Delta: -0.80% -$5,567.53
Over/Under Est: 34.96% $189,634.75
Amt Left: 51.87% $250,028.95
Delta: -4.93% -$34,415.92
$757,478.00
Over/Under Est: 39.65% $215,083.80
Amt Left: 57.15% $275,478.00
Delta: -3.48% -$25,449.05
Over/Under Est: 111.85% $606,658.05
Amt Left: 138.39% $667,052.25
Delta: -51.69% -$391,574.25
Subcontractor Percentage Amount
PANOLA SIGN & BARRICADE, INC. 2.03% $9,784.60
CAP RIVER LLC 1.41% $6,796.20
Total: 3.44% $16,580.80

Bid Items & Bid Tabulations

27 Total 0 of 27
HUNT  |  VARIOUS  |  PARIS  |  0901-22-130  |  08/07/2025  |  $542,394.20  |  STP 2B24(573)TAPS  |  CONSTRUCT PEDESTRIAN INFRASTRUCT  |  81 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
SCOUT 5 CONSTRUCTION LLC
TALBERT COMPANIES LLC
GARRET SHIELDS INFRASTRUCTURE
HIGHWAY 19 CONSTRUCTION LLC
TEXAS STEEL INDUSTRIAL PLACING, LLC
TI-ZACK CONCRETE, LLC
STX CIVIL
GREY SKY CONSTRUCTION LLC
THK CONSTRUCTION LLC
STRUCTURAL INTEGRITY GROUP LLC
ARTILLERY L.L.C.
O. TREVINO CONSTRUCTION, LLC
PREPARING ROW
STA 39.000 $1,000.000 $4,750.000 $1,000.000 $500.000 $500.000 $950.000 $110.000 $1,500.000 $1,500.000 $1,500.000 $475.000 $1,500.000 $800.000
REMOV CONC (DRIVEWAYS)
SY 95.000 $23.500 $22.000 $20.000 $50.000 $25.000 $40.000 $24.000 $26.000 $20.000 $30.000 $28.000 $36.000 $65.000
REMOV CONC (SIDEWALK, RAMP OR SUP)
SY 191.000 $26.000 $22.000 $20.000 $50.000 $25.000 $40.000 $23.870 $26.000 $20.000 $40.000 $27.800 $27.000 $50.000
REMOV CONC (CURB)
LF 5.000 $10.000 $1.100 $19.000 $100.000 $10.000 $40.000 $18.240 $12.000 $20.000 $20.000 $106.000 $20.000 $250.000
RMV (0"-4") TRT/UNTRT BASE & ASPH PAV
SY 569.000 $20.000 $13.200 $8.000 $10.000 $15.000 $20.000 $32.060 $20.000 $20.000 $15.000 $18.700 $30.000 $45.000
BLOCK SODDING
SY 1,133.000 $5.000 $0.010 $7.750 $10.000 $7.000 $6.000 $11.000 $11.000 $10.000 $6.600 $6.000 $10.000 $10.000
VEGETATIVE WATERING
TGL 39.650 $35.000 $0.010 $175.000 $100.000 $100.000 $100.000 $1.100 $75.000 $50.000 $10.000 $285.000 $50.000 $240.000
ADJUSTING MANHOLES (UTILITY BOX)
EA 3.000 $650.000 $33.000 $300.000 $1,000.000 $500.000 $1,000.000 $608.000 $1,500.000 $650.000 $1,000.000 $533.000 $1,000.000 $4,500.000
ADJUSTING MANHOLES (WATER VALVE BOX)
EA 4.000 $650.000 $110.000 $250.000 $1,000.000 $500.000 $650.000 $684.000 $750.000 $650.000 $1,000.000 $433.000 $1,000.000 $4,500.000
PIPE (PVC) (SCH 80) (6 IN)
LF 687.000 $80.000 $22.200 $37.840 $30.000 $35.000 $50.000 $33.000 $95.000 $60.000 $75.000 $45.200 $60.000 $140.000
MOBILIZATION
LS 1.000 $44,525.450 $16,343.400 $51,860.910 $40,000.000 $50,000.000 $64,787.700 $33,191.440 $50,000.000 $60,000.000 $63,000.000 $70,234.000 $175,000.000 $113,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 5.000 $3,000.000 $0.010 $1,800.000 $5,000.000 $5,000.000 $1,500.000 $2,750.000 $3,000.000 $10,000.000 $1,116.500 $6,390.000 $5,000.000 $22,000.000
TMA (STATIONARY)
DAY 30.000 $225.000 $0.010 $300.000 $300.000 $500.000 $250.000 $1.100 $200.000 $150.000 $300.000 $1.000 $300.000 $200.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 198.000 $4.000 $1.630 $4.500 $6.000 $5.000 $7.000 $0.110 $10.000 $15.000 $6.820 $6.200 $8.000 $6.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 2,811.000 $5.500 $2.010 $5.500 $8.000 $5.000 $6.000 $0.110 $8.000 $18.000 $4.400 $4.000 $6.000 $7.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 3,009.000 $1.000 $1.100 $1.000 $1.000 $1.000 $1.000 $0.110 $2.000 $5.000 $1.430 $1.300 $1.500 $1.250
CONC CURB (TY F1)
LF 823.000 $70.000 $200.000 $100.000 $50.000 $180.000 $148.000 $219.520 $105.000 $100.000 $100.000 $94.600 $40.000 $260.000
DRIVEWAYS (CONC)
SY 753.000 $100.000 $29.890 $95.000 $120.000 $113.000 $110.000 $123.710 $115.000 $85.000 $110.000 $199.700 $126.000 $140.000
CONC SIDEWALKS (4")
SY 1,483.000 $80.000 $21.640 $80.000 $90.000 $74.000 $95.000 $117.570 $100.000 $85.000 $100.000 $103.500 $99.000 $120.000
CURB RAMPS (TY 1)
EA 7.000 $3,000.000 $652.040 $2,700.000 $3,000.000 $1,500.000 $3,000.000 $2,671.160 $2,800.000 $3,250.000 $4,000.000 $2,134.500 $3,500.000 $3,500.000
CURB RAMPS (TY 7)
EA 9.000 $3,200.000 $727.510 $2,400.000 $3,000.000 $1,500.000 $3,000.000 $2,265.830 $2,800.000 $3,250.000 $4,000.000 $1,736.000 $3,500.000 $3,500.000
CONC SIDEWALKS (SPECIAL)
SY 30.000 $150.000 $174.280 $175.000 $200.000 $350.000 $315.000 $458.980 $200.000 $85.000 $1,000.000 $2,010.000 $250.000 $2,500.000
ALUMINUM SIGNS (TY A)
SF 22.000 $40.000 $15.350 $50.000 $50.000 $35.000 $35.000 $38.500 $100.000 $50.000 $3.300 $42.000 $60.000 $50.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 8.000 $700.000 $416.790 $850.000 $600.000 $850.000 $800.000 $825.000 $925.000 $1,500.000 $1,500.000 $1,445.000 $1,000.000 $1,047.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 1.000 $600.000 $256.950 $750.000 $300.000 $350.000 $650.000 $825.000 $650.000 $1,100.000 $1,500.000 $871.000 $900.000 $924.000
PREFAB PM TY B (W)(24")(SLD)
LF 152.000 $18.000 $10.070 $42.500 $40.000 $10.000 $45.000 $66.000 $85.000 $20.000 $66.000 $60.000 $75.000 $80.000
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
EA 2.000 $8,500.000 $256.950 $7,500.000 $10,000.000 $10,000.000 $9,500.000 $13,475.000 $12,500.000 $15,000.000 $13,475.000 $14,112.000 $10,000.000 $11,100.000
Totals: $542,394.200 $481,999.996 $530,538.990 $534,840.000 $589,641.000 $648,460.700 $663,125.435 $687,343.750 $692,045.500 $697,613.030 $732,028.950 $757,478.000 $1,149,052.250
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $5,410.06
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $10,820.13
Total: $16,230.19