Show Job Controls
Bid Cobra

HUNT SH 276 (0641-01-038)

Items: 96

County: HUNT
Length: 2.6200 MILES
Highway: SH 276
District: PARIS
Control Number: 0641-01-038
DBE Goal: 0.0%
Project: C 641-1-38
Guaranty: $100,000.00
Time: 163 WORKING DAYS
Engineer's Estimate: $8,048,585.92
Date: 03/05/2025 (1 year ago)
Contract Number: 3253217
Type: HAZARD ELIMINATION & SAFETY
Project ID: A00195145
Project Description: ADD CONTINUOUS TWO WAY TURN LANE
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
JAMES ATKINS
WILLIE BOLDEN
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$8,048,585.92
1
$7,646,072.84
Over/Under Est: -5% -$402,513.08
Over/Under Est: 16.12% $1,297,476.67
Amt Left: 22.23% $1,699,989.75
Over/Under Est: 21.76% $1,750,979.08
Amt Left: 28.16% $2,153,492.16
Delta: -4.85% -$453,502.41
Subcontractor Percentage Amount
BAHENA CONSTRUCTION CO., INC. 13.04% $997,047.90
A. K. GILLIS & SONS, LLC 12.20% $932,820.89
INDUSTRIAL FABRICS, INC. 2.37% $181,211.93
TEXOP CONSTRUCTION 1.32% $100,928.16
STRIPING TECHNOLOGY, L.P. 1.29% $98,634.34
J. H. ODEN CONTRACTING COMPANY 1.23% $94,046.70
DUSTIN ALLEN, INC. 0.92% $70,343.87
CATOCON, INC. 0.90% $68,814.66
MARCOM'S MOWING SERVICE, LLC 0.44% $33,642.72
PANOLA SIGN & BARRICADE, INC. 0.24% $18,350.57
SURFACE PREPARATION TECHNOLOGIES, LLC 0.14% $10,704.50
Total: 34.09% $2,606,546.24

Bid Items & Bid Tabulations

96 Total 0 of 96
HUNT  |  SH 276  |  PARIS  |  0641-01-038  |  03/05/2025  |  $8,048,585.92  |  C 641-1-38  |  HAZARD ELIM & SAFETY  |  163 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
RK HALL, LLC
TEXAS MATERIALS GROUP, INC.
GREY SKY CONSTRUCTION LLC
PREPARING ROW
STA 138.580 $2,300.000 $677.330 $2,243.000 $5,755.000
REMOV CONC (DRIVEWAYS)
SY 331.000 $32.500 $12.720 $65.000 $50.000
RMV (0"-6") TRT/UNTRT BASE & ASPH PAV
SY 2,838.000 $12.000 $14.500 $19.000 $20.000
EXCAV (ROADWAY)
CY 9,683.000 $20.000 $18.000 $12.000 $20.000
EXCAV (CHANNEL)
CY 12.000 $80.000 $170.400 $65.000 $50.000
EMBANK (FNL)(OC)(TY B)
CY 15,601.000 $24.000 $21.400 $25.000 $35.000
EMBANK (VEH)(OC)(TY B)
CY 49.000 $51.670 $83.350 $45.000 $50.000
BACKFILL (TY A)
STA 7.960 $355.000 $333.210 $1,000.000 $250.000
ROAD GRADER WORK (ORD COMP)
STA 7.960 $250.000 $365.380 $870.000 $250.000
BROADCAST SEED (TEMP_WARM)
SY 58,053.000 $0.160 $0.140 $0.140 $0.500
BROADCAST SEED (TEMP_COOL)
SY 58,053.000 $0.160 $0.140 $0.140 $0.500
STRAW/HAY MLCH SEED(PERM_RURAL_CLAY)
SY 116,106.000 $0.450 $0.410 $0.430 $0.500
VEGETATIVE WATERING
TGL 697.000 $42.000 $67.450 $60.000 $30.000
SOIL RET BLKT(SL_STEEP_CLAY_LONG)
SY 200.000 $5.500 $4.240 $4.300 $15.000
SOIL RET BLKT(CHAN_TEMP_2 PSF)
SY 200.000 $4.500 $5.300 $5.500 $15.000
PROOF ROLLING
HR 11.130 $215.000 $238.620 $211.000 $150.000
REWORK BS MTL (TY B)(8")(ORD COMP)
SY 28,798.000 $6.500 $9.780 $6.000 $6.000
D-GR HMA TY-B SAC-B PG64-22
TON 20,002.000 $119.000 $118.910 $141.000 $140.000
D-GR HMA TY-D PG64-22 (LEVEL-UP)
TON 500.000 $190.000 $159.540 $190.000 $200.000
SP MIXES SP-C SAC-A PG64-22
TON 9,194.000 $124.000 $128.020 $150.000 $160.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 500.000 $85.000 $80.370 $130.000 $88.000
PLANE ASPH CONC PAV(0" TO 3")
SY 4,201.000 $3.500 $8.490 $4.400 $10.000
CUT & RESTORING PAV
SY 97.000 $225.000 $106.000 $245.000 $200.000
FLOWABLE BACKFILL
CY 164.000 $360.000 $265.000 $385.000 $350.000
TRENCH EXCAVATION PROTECTION
LF 212.000 $12.000 $15.900 $13.200 $10.000
TEMPORARY SPL SHORING
SF 3,742.000 $52.000 $79.500 $33.000 $25.000
RIPRAP (CONC)(4 IN)
CY 12.000 $950.000 $689.000 $935.000 $550.000
RIPRAP (MOW STRIP)(4 IN)
CY 120.000 $715.000 $689.000 $1,045.000 $550.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 85.000 $240.000 $265.000 $192.000 $165.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 200.000 $200.000 $302.100 $313.000 $185.000
CONC BOX CULV (4 FT X 4 FT)
LF 116.000 $1,100.000 $477.000 $990.000 $850.000
CONC BOX CULV (5 FT X 5 FT)(EXTEND)
LF 40.000 $1,308.000 $1,060.000 $1,045.000 $1,250.000
CONC BOX CULV (7 FT X 7 FT)(EXTEND)
LF 12.000 $1,650.000 $1,484.000 $1,320.000 $2,000.000
RC PIPE (CL III)(18 IN)
LF 1,244.000 $90.000 $53.000 $71.500 $80.000
RC PIPE (CL III)(24 IN)
LF 442.000 $110.000 $95.400 $176.000 $125.000
RC PIPE (CL III)(30 IN)
LF 20.000 $147.000 $121.900 $275.000 $165.000
HEADWALL (CH - PW - 0) (DIA= 30 IN)
EA 4.000 $12,184.380 $9,010.000 $7,700.000 $8,500.000
HEADWALL (CH - PW - S) (DIA= 36 IN)
EA 1.000 $19,800.000 $12,720.000 $12,100.000 $12,500.000
WINGWALL (PW - 2) (HW=7 FT)
EA 4.000 $23,000.000 $29,680.000 $27,500.000 $35,000.000
WINGWALL (PW - 2) (HW=9 FT)
EA 2.000 $30,000.000 $37,100.000 $44,000.000 $45,000.000
WINGWALL (PW - 2) (HW=10 FT)
EA 3.000 $45,000.000 $50,880.000 $63,824.000 $55,000.000
WINGWALL (PW - 2) (HW=11 FT)
EA 1.000 $55,000.000 $58,300.000 $68,200.000 $65,000.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 76.000 $1,200.000 $901.000 $1,100.000 $1,250.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 26.000 $1,965.000 $1,696.000 $2,750.000 $2,000.000
SET (TY II) (36 IN) (RCP) (4: 1) (C)
EA 2.000 $3,350.000 $3,816.000 $4,400.000 $3,500.000
THERMOPLASTIC PIPE (PP) (30")
LF 100.000 $175.000 $121.900 $248.000 $500.000
REMOV & RE - LAY PIPE (18 IN)
LF 4.000 $75.000 $31.800 $110.000 $500.000
CLEAN EXIST CULVERTS
EA 1.000 $3,500.000 $1,272.000 $2,750.000 $1,500.000
REMOV STR (SET)
EA 4.000 $320.370 $212.000 $825.000 $500.000
REMOV STR (WINGWALL)
EA 6.000 $1,600.000 $1,060.000 $2,750.000 $2,500.000
REMOV STR (PIPE)
LF 1,449.000 $23.500 $10.600 $55.000 $50.000
MOBILIZATION
LS 1.000 $720,797.000 $382,303.640 $932,989.000 $900,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 11.000 $9,000.000 $22,381.670 $27,000.000 $12,500.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $17,000.000 $8,979.100 $12,000.000 $20,000.000
TMA (STATIONARY)
DAY 122.000 $218.750 $529.900 $390.000 $250.000
TMA (MOBILE OPERATION)
DAY 31.000 $512.500 $1,005.940 $1.000 $550.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 480.000 $48.460 $53.000 $60.000 $50.000
ROCK FILTER DAMS (REMOVE)
LF 480.000 $15.430 $12.720 $13.000 $20.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 300.000 $4.760 $5.300 $5.500 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 300.000 $1.410 $1.060 $1.100 $2.000
DRIVEWAYS (CONC)
SY 259.000 $115.540 $106.000 $275.000 $100.000
DRIVEWAYS (ACP)
SY 262.000 $63.000 $65.030 $140.000 $55.000
DRIVEWAYS (BASE)
SY 1,760.000 $16.000 $51.180 $36.000 $40.000
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
LF 27,716.000 $0.450 $0.210 $0.340 $0.500
FILL MILLED ASPH RUMBLE STRIPS (SHLDR)
LF 1,440.000 $0.500 $5.080 $6.430 $5.000
FILL MILLED ASPH RMBL STRIP(CENTERLINE)
LF 1,440.000 $8.870 $5.080 $6.420 $5.000
MTL W-BEAM GD FEN (STEEL POST)
LF 1,475.000 $32.350 $28.620 $32.000 $35.000
GUARDRAIL END TREATMENT (INSTALL)
EA 10.000 $3,250.000 $3,153.500 $3,600.000 $3,520.000
MAILBOX INSTALL-M (TWG-POST) TY 1
EA 4.000 $720.000 $212.000 $765.000 $1,150.000
MAILBOX INSTALL-S (TWG-POST) TY 2
EA 11.000 $340.000 $318.000 $346.000 $1,150.000
MAILBOX INSTALL-D (TWG-POST) TY 2
EA 7.000 $390.000 $530.000 $390.000 $1,150.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 23.000 $730.000 $1,590.000 $720.000 $1,500.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 8.000 $890.000 $1,590.000 $875.000 $1,500.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 3.000 $1,051.000 $1,590.000 $1,200.000 $1,500.000
REMOVE SM RD SN SUP&AM
EA 33.000 $146.000 $212.000 $87.000 $500.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 16.000 $66.740 $32.860 $28.000 $100.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 22.000 $89.090 $79.500 $60.000 $100.000
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 53,248.000 $0.560 $0.210 $0.220 $0.650
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 96.000 $6.000 $1.060 $1.100 $20.000
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 54,718.000 $0.540 $0.210 $0.220 $0.650
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 6,060.000 $2.300 $2.400 $1.200 $6.000
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 638.000 $4.250 $1.270 $1.300 $6.000
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
LF 96.000 $18.000 $8.480 $8.800 $20.000
REFL PAV MRK TY I (W)(ARROW)(090MIL)
EA 24.000 $193.970 $153.700 $160.000 $250.000
REFL PAV MRK TY I (W)(WORD)(090MIL)
EA 2.000 $246.380 $174.900 $181.000 $250.000
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
EA 4.000 $76.000 $106.000 $110.000 $150.000
REFL PAV MRK TY I (W)6"(BRK)(090MIL)
LF 72.000 $0.780 $1.060 $1.100 $3.000
REFL PAV MRK TY I (W)6"(SLD)(090MIL)
LF 26,712.000 $0.780 $0.660 $0.680 $0.650
REFL PAV MRK TY I (Y)6"(BRK)(090MIL)
LF 6,556.000 $0.750 $0.660 $0.680 $0.650
REFL PAV MRK TY I (Y)6"(SLD)(090MIL)
LF 27,952.000 $0.800 $0.660 $0.680 $0.650
REFL PAV MRKR TY I-C
EA 37.000 $6.360 $5.300 $5.500 $6.000
REFL PAV MRKR TY II-A-A
EA 656.000 $5.470 $5.300 $5.500 $6.000
REFL PAV MRKR TY II-C-R
EA 5.000 $5.750 $5.300 $5.500 $6.000
ELIM EXT PM & MRKS (6")
LF 119,808.000 $0.900 $0.270 $0.280 $0.650
UNDERSEAL COURSE
GAL 20,893.000 $5.800 $6.000 $8.000 $4.500
REINFORMT GRID FOR ASPH PVMT (TY II)
LF 26,124.000 $7.700 $7.430 $10.000 $6.000
Totals: $8,048,585.920 $7,646,072.848 $9,346,062.590 $9,799,565.000
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (NON-PART) $72,080.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (NON-PART) $144,159.00
Total: $216,239.00