HUNT SH 224 (0136-01-066)

Items: 56

County: HUNT
Length: N/A
Highway: SH 224
District: PARIS
Control Number: 0136-01-066
DBE Goal: N/A
Project: BR 2022(388)
Guaranty: N/A
Time: 129 WORKING DAYS
Engineer's Estimate: $2,512,256.40
Date: 03/03/2022 (4 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (4)
E
Engineer's Estimate
$2,512,256.40
$2,620,776.26
Over/Under Est: 4.32% $108,519.86
Over/Under Est: 26.38% $662,672.80
Amt Left: 21.14% $554,152.94
Over/Under Est: 28.11% $706,266.00
Amt Left: 22.81% $597,746.14
Delta: -1.37% -$43,593.20
Over/Under Est: 51.08% $1,283,191.75
Amt Left: 44.82% $1,174,671.89
Delta: -17.93% -$576,925.75
Subcontractor Percentage Amount
PEACHTREE CONSTRUCTION, LTD. 2.80% $73,381.74
DUSTIN ALLEN, INC. 1.26% $33,021.78
FLEX SUPPLY, LLC 0.46% $12,055.57
STRIPING TECHNOLOGY, L.P. 0.38% $9,958.95
HERMANOS STEEL, LLC 0.19% $4,979.47
TEX OP CONSTRUCTION, LP 0.19% $4,979.47
SOUTHEAST GRINDING AND GROOVING LLC 0.17% $4,455.32
CAP RIVER LLC 0.13% $3,407.01
Total: 5.58% $146,239.31

Bid Items & Bid Tabulations

56 Total 0 of 56
HUNT  |  SH 224  |  PARIS  |  0136-01-066  |  03/03/2022  |  $2,512,256.40  |  BR 2022(388)  |  BRIDGE REPL  |  129 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HIGHWAY 19 CONSTRUCTION LLC
HODGES AND SON CONSTRUCTION COMPANY, INC.
STERLING DELAWARE HOLDING COMPANY, INC.
EAST TEXAS BRIDGE, INC.
PREPARING ROW
STA 12.000 $1,000.000 $1,000.000 $4,000.000 $24,400.000 $10,000.000
REMOVING CONC (RIPRAP)
SY 342.000 $9.000 $5.000 $12.000 $42.000 $20.000
REMOVING STAB BASE AND ASPH PAV (3")
SY 318.000 $10.000 $21.000 $30.000 $9.000 $20.000
EXCAVATION (CHANNEL)
CY 2,218.000 $21.000 $5.000 $15.000 $29.000 $20.000
BACKFILL (TY B)
STA 8.000 $250.000 $250.000 $800.000 $635.000 $200.000
ROAD GRADER WORK (ORD COMP)
STA 8.000 $250.000 $250.000 $1,000.000 $250.000 $300.000
BROADCAST SEED (TEMP) (WARM)
SY 2,517.000 $1.000 $0.690 $0.800 $0.400 $0.450
BROADCAST SEED (TEMP) (COOL)
SY 2,517.000 $1.000 $0.690 $0.800 $0.400 $0.450
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
SY 5,033.000 $0.900 $0.680 $1.000 $0.400 $0.450
VEGETATIVE WATERING
MG 30.000 $36.000 $10.000 $1.000 $30.000 $30.000
PROOF ROLLING
HR 4.000 $130.000 $75.000 $50.000 $85.000 $100.000
REWORK BS MTL (TY C)(12"-18")(ORD COMP)
SY 3,495.000 $2.250 $5.250 $8.000 $12.000 $20.000
CEMENT
TON 57.000 $185.000 $200.000 $250.000 $190.000 $200.000
CEMENT TREAT(EXIST MATL)(8")
SY 3,495.000 $2.700 $5.250 $6.000 $5.500 $5.000
ASPH (AC-20-5TR OR AC-20XP)
GAL 1,608.000 $4.000 $5.750 $6.000 $5.750 $7.000
AGGR (TY-B GR-3 OR TY-L GR-3)(SAC-B)
CY 34.000 $110.000 $180.000 $400.000 $350.000 $400.000
CEM STABIL BKFL
CY 245.000 $178.000 $180.000 $200.000 $140.000 $250.000
DRILL SHAFT (18 IN)
LF 210.000 $92.000 $100.000 $80.000 $75.000 $125.000
DRILL SHAFT (36 IN)
LF 890.000 $205.000 $164.840 $170.000 $170.000 $250.000
CL C CONC (ABUT)
CY 105.000 $1,000.000 $882.760 $1,100.000 $1,250.000 $1,500.000
CL C CONC (CAP)
CY 59.000 $1,050.000 $1,284.000 $1,100.000 $1,100.000 $3,000.000
CL C CONC (COLUMN)
CY 210.000 $900.000 $515.850 $1,100.000 $0.010 $1.000
REINF CONC SLAB
SF 17,250.000 $18.000 $24.290 $23.000 $25.000 $38.000
APPROACH SLAB
CY 144.000 $550.000 $503.760 $600.000 $850.000 $600.000
PRESTR CONC GIRDER (TX54)
LF 2,240.000 $140.000 $222.000 $270.000 $250.000 $230.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 3,381.000 $130.000 $120.000 $140.000 $110.000 $135.000
RIPRAP (MOW STRIP)(4 IN)
CY 40.000 $550.000 $400.000 $500.000 $600.000 $500.000
RAIL (TY T223)
LF 826.000 $115.000 $113.770 $135.000 $140.000 $175.000
ARMOR JOINT (SEALED)
LF 260.000 $95.000 $180.000 $100.000 $115.000 $125.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 1.000 $79,000.000 $80,000.000 $135,000.000 $187,334.000 $180,000.000
REMOV STR (RET WALL)
LF 108.000 $92.000 $20.000 $90.000 $34.000 $75.000
MOBILIZATION
LS 1.000 $226,178.000 $250,000.000 $285,000.000 $320,000.000 $350,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 9.000 $2,700.000 $1,998.000 $2,000.000 $5,000.000 $15,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 160.000 $31.000 $45.000 $5.000 $44.000 $50.000
ROCK FILTER DAMS (REMOVE)
LF 160.000 $9.500 $5.000 $5.000 $12.000 $12.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 362.000 $2.300 $3.000 $4.000 $5.000 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 362.000 $1.000 $1.000 $2.000 $1.000 $1.000
DRIVEWAYS (BASE)
SY 165.000 $32.000 $25.000 $60.000 $38.000 $30.000
MTL W-BEAM GD FEN (STEEL POST)
LF 350.000 $28.000 $30.000 $30.000 $28.500 $33.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $1,800.000 $1,900.000 $2,100.000 $2,249.000 $2,300.000
REMOVE METAL BEAM GUARD FENCE
LF 475.000 $3.500 $2.000 $2.500 $2.000 $3.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $2,700.000 $3,150.000 $3,200.000 $2,985.000 $3,500.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $275.000 $200.000 $500.000 $195.000 $300.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 2.000 $540.000 $950.000 $1,000.000 $645.000 $1,200.000
REMOVE SM RD SN SUP&AM
EA 2.000 $75.000 $100.000 $200.000 $250.000 $200.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 53.000 $40.000 $35.000 $30.000 $20.000 $30.000
REFL PAV MRK TY II (W) 4" (SLD)
LF 2,260.000 $0.110 $0.500 $1.000 $0.050 $0.550
REFL PAV MRK TY II (Y) 4" (BRK)
LF 1,130.000 $0.150 $0.500 $1.000 $0.050 $0.550
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 2,260.000 $1.250 $2.000 $1.500 $1.250 $2.500
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 1,130.000 $1.250 $2.000 $1.500 $1.250 $2.500
REFL PAV MRKR TY II-A-A
EA 27.000 $4.500 $20.000 $20.000 $5.500 $30.000
PAV SURF PREP FOR MRK (4")
LF 1,125.000 $0.250 $1.000 $0.500 $0.100 $1.500
D-GR HMA TY-C SAC-A PG64-22(EXEMPT)
TON 385.000 $170.000 $130.000 $130.000 $128.000 $150.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $12,000.000 $5,000.000 $10,000.000 $5,500.000 $50,000.000
TMA (STATIONARY)
DAY 129.000 $200.000 $1.000 $300.000 $80.000 $200.000
TMA (MOBILE OPERATION)
HR 40.000 $45.000 $100.000 $100.000 $48.000 $30.000
Totals: $2,512,256.400 $2,620,776.260 $3,174,929.200 $3,218,522.400 $3,795,448.150