Show Job Controls
Bid Cobra

HUNT IH 30 (0009-13-183)

Items: 71

County: HUNT
Length: N/A
Highway: IH 30
District: PARIS
Control Number: 0009-13-183
DBE Goal: N/A
Project: BR 2022(422)
Guaranty: N/A
Time: 335 WORKING DAYS
Engineer's Estimate: $1,666,573.00
Date: 04/07/2022 (4 years ago)
Contract Number: N/A
Type: BRIDGE MAINTENANCE
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (4)
E
Engineer's Estimate
$1,666,573.00
Over/Under Est: 19.66% $327,632.00
$2,484,371.00
Over/Under Est: 49.07% $817,798.00
Amt Left: 24.58% $490,166.00
Over/Under Est: 58.44% $973,869.70
Amt Left: 32.41% $646,237.70
Delta: -6.28% -$156,071.70
Over/Under Est: 66.61% $1,110,075.50
Amt Left: 39.24% $782,443.50
Delta: -5.16% -$136,205.80

Bid Items & Bid Tabulations

71 Total 0 of 71
HUNT  |  IH 30  |  PARIS  |  0009-13-183  |  04/07/2022  |  $1,666,573.00  |  BR 2022(422)  |  BRIDGE MAINT  |  335 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
BUILT RIGHT CONSTRUCTION OF OKLAHOMA, LLC
CEKRA INC.
GHB EQUIPMENT COMPANY, L.L.C.
GIBSON & ASSOCIATES, INC.
REMOVING CONC (RIPRAP)
SY 467.000 $35.000 $25.000 $20.000 $100.000 $33.000
REMOVING CONC (SIDEWALKS)
SY 18.000 $30.000 $25.000 $50.000 $100.000 $110.000
REMOVING CONCRETE(MOW STRIP)
LF 30.000 $20.000 $25.000 $40.000 $100.000 $110.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 78.000 $35.000 $50.000 $15.000 $200.000 $220.000
BLOCK SODDING
SY 692.000 $10.000 $6.000 $5.000 $10.000 $5.450
VEGETATIVE WATERING
MG 6.000 $10.000 $200.000 $15.000 $500.000 $550.000
CEM STABIL BKFL
CY 179.000 $175.000 $300.000 $100.000 $360.000 $247.500
FLOWABLE BACKFILL
CY 41.000 $250.000 $300.000 $200.000 $400.000 $286.000
TEMPORARY SPL SHORING
SF 700.000 $50.000 $200.000 $240.000 $90.000 $125.000
CONC STR REPAIR(CLEAN & COAT WTH EPOXY)
SF 5.000 $225.000 $450.000 $150.000 $800.000 $250.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 1,103.000 $220.000 $235.000 $500.000 $220.000 $267.000
RIPRAP (CONC)(5 IN)
CY 2.000 $500.000 $800.000 $1,000.000 $4,000.000 $3,300.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 1,277.000 $150.000 $125.000 $110.000 $300.000 $192.500
RIPRAP (STONE PROTECTION)(24 IN)
CY 24.000 $175.000 $145.000 $200.000 $340.000 $203.500
RIPRAP (MOW STRIP)(4 IN)
CY 70.000 $450.000 $650.000 $450.000 $1,000.000 $715.000
ELASTOMERIC BEARING (LAMINATED)
EA 10.000 $500.000 $3,000.000 $1,000.000 $5,000.000 $650.000
CLEANING EXISTING JOINTS
LF 178.000 $30.000 $22.000 $50.000 $40.000 $65.000
RESIZING AND SEALING JOINTS
LF 72.000 $40.000 $65.000 $100.000 $76.000 $95.000
STR STEEL (MISCELLANEOUS BRIDGE)
LB 1,660.000 $8.000 $15.000 $35.000 $25.000 $30.000
CLEAN & PAINT EXIST STR (SYSTEM III-A)
LS 1.000 $77,250.000 $135,000.000 $150,000.000 $110,000.000 $123,000.000
RETROFIT RAIL (TY T223)
LF 394.000 $200.000 $300.000 $280.000 $450.000 $247.500
HEADER TYPE EXPANSION JOINT
CF 60.000 $340.000 $600.000 $500.000 $700.000 $675.000
JOINT SEALANT
LF 178.000 $25.000 $40.000 $15.000 $30.000 $50.000
GABIONS (GALV)
CY 187.000 $250.000 $750.000 $300.000 $400.000 $473.000
PIPE (PVC) (SCH 40) (3 IN)
LF 12.000 $40.000 $100.000 $25.000 $50.000 $600.000
RAISING EXIST STRUCT
LS 1.000 $15,000.000 $85,000.000 $120,000.000 $100,000.000 $16,500.000
MOBILIZATION
LS 1.000 $151,510.000 $225,000.000 $238,000.000 $200,000.000 $275,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 21.000 $10,000.000 $2,200.000 $2,500.000 $2,000.000 $12,500.000
CONSTRUCTION EXITS (INSTALL) (TY 3)
SY 1,000.000 $30.000 $20.000 $30.000 $20.000 $28.000
CONSTRUCTION EXITS (REMOVE)
SY 1,000.000 $8.000 $12.000 $10.000 $8.000 $8.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,400.000 $5.000 $3.000 $3.500 $11.000 $3.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,400.000 $1.000 $1.000 $0.500 $1.000 $0.750
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 5.000 $5,000.000 $3,500.000 $5,000.000 $8,000.000 $7,700.000
PTB(MOVE)(SSCB OR CSB)(TY1)OR(STL)
LF 540.000 $10.000 $7.250 $25.000 $30.000 $7.000
PTB(STKPL)(SSCB OR CSB)(TY1)OR(STL)
LF 810.000 $10.000 $15.000 $90.000 $50.000 $28.000
PTB(DES SRCE)(SSCB OR CSB)(TY1)OR(STL)
LF 810.000 $30.000 $15.000 $90.000 $70.000 $40.000
CONC SIDEWALKS (6")
SY 18.000 $100.000 $250.000 $300.000 $72.000 $660.000
MTL W-BEAM GD FEN (TIM POST)
LF 387.500 $30.000 $30.000 $30.000 $30.000 $29.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,000.000 $2,300.000 $2,000.000 $3,000.000 $1,952.500
REMOVE METAL BEAM GUARD FENCE
LF 400.000 $3.000 $6.000 $10.000 $12.000 $165.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 4.000 $300.000 $200.000 $500.000 $1,000.000 $165.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $2,750.000 $3,200.000 $4,000.000 $4,000.000 $3,382.500
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $300.000 $250.000 $270.000 $1,000.000 $220.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000 $1,500.000 $1,416.750 $2,000.000 $3,000.000 $2,200.000
CRASH CUSH ATTEN (REMOVE)
EA 3.000 $850.000 $687.000 $2,000.000 $2,000.000 $1,650.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 3.000 $10,000.000 $7,550.000 $10,000.000 $11,000.000 $11,000.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 14.000 $20.000 $30.000 $25.000 $27.000 $16.500
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 17.000 $20.000 $30.000 $20.000 $45.000 $27.500
INSTL DEL ASSM (D-SW)SZ 1(WFLX)SRF(BI)
EA 20.000 $30.000 $137.250 $30.000 $45.000 $165.000
WK ZN PAV MRK REMOV (TRAF BTN) TY W
LF 10,370.000 $3.000 $1.000 $1.000 $3.750 $1.050
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
LF 10,530.000 $3.000 $1.000 $1.000 $3.750 $1.050
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 30.000 $8.000 $22.000 $15.000 $22.500 $22.000
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 1,310.000 $0.500 $1.200 $1.000 $6.000 $1.100
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 10,280.000 $0.500 $1.200 $1.000 $3.000 $1.100
REFL PAV MRKR TY II-C-R
EA 66.000 $3.000 $16.000 $6.000 $22.500 $16.500
ELIM EXT PAV MRK & MRKS (4")
LF 11,350.000 $1.000 $1.200 $1.000 $1.050 $1.100
PAV SURF PREP FOR MRK (4")
LF 11,590.000 $0.200 $0.650 $1.000 $0.380 $0.610
REMOVAL OF CONDUIT
LF 84.000 $8.000 $5.000 $15.000 $7.500 $80.000
JT / CRCK ROUT / SEAL(RUBBER - ASPHALT)
LF 3,094.000 $15.000 $2.500 $5.000 $20.000 $3.300
CONCRETE RAIL REPAIR (IN-KIND)
LF 8.000 $500.000 $650.000 $200.000 $1,000.000 $1,100.000
CONC CRCK REPR(DISCRETE)(ROUT AND SEAL)
LF 10.000 $50.000 $155.000 $100.000 $100.000 $150.000
REP STL BRIDGE MEMBER (BEARINGS)
EA 10.000 $250.000 $3,000.000 $15,000.000 $3,400.000 $1,750.000
CARBON FIBER REINF POLYMER PROTECTION
SF 90.000 $125.000 $115.000 $90.000 $250.000 $205.000
REPLACE ELASTOMERIC BEARING PADS
EA 5.000 $3,000.000 $10,000.000 $3,500.000 $10,000.000 $5,500.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 6.000 $10,000.000 $1,500.000 $10,000.000 $12,000.000 $18,000.000
TMA (STATIONARY)
DAY 216.000 $200.000 $220.000 $250.000 $250.000 $230.000
TMA (MOBILE OPERATION)
DAY 5.000 $300.000 $128.000 $500.000 $1,800.000 $1,100.000
REML & DESPL DRIFTWOOD & DEBRIS-SITE 1
LS 1.000 $2,000.000 $15,000.000 $3,000.000 $25,000.000 $15,000.000
REML & DESPL DRIFTWOOD & DEBRIS-SITE 2
LS 1.000 $2,000.000 $15,000.000 $3,000.000 $25,000.000 $15,000.000
REML & DESPL DRIFTWOOD & DEBRIS-SITE 3
LS 1.000 $5,000.000 $15,000.000 $3,000.000 $20,000.000 $139,000.000
REML & DESPL DRIFTWOOD & DEBRIS-SITE 4
LS 1.000 $1,000.000 $15,000.000 $3,000.000 $30,000.000 $215,000.000
Totals: $1,666,573.000 $1,994,205.000 $2,484,371.000 $2,640,442.700 $2,776,648.500