REMOVING CONC (CURB AND GUTTER)
|
LF
|
250.000
|
$6.500
|
$27.500
|
$16.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (2"-6")
|
SY
|
13.000
|
$2.750
|
$47.740
|
$15.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
37.000
|
$6.500
|
$47.940
|
$125.000
|
|
|
BACKFILL (TY A)
|
STA
|
39.310
|
$215.000
|
$226.780
|
$360.000
|
|
|
BLOCK SODDING
|
SY
|
83.000
|
$4.150
|
$9.900
|
$15.000
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
4,819.000
|
$0.080
|
$0.390
|
$0.450
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
4,819.000
|
$0.080
|
$0.390
|
$0.450
|
|
|
STRAW/HAY MLCH SEED(PERM)(RURAL)(CLAY)
|
SY
|
9,637.000
|
$0.230
|
$0.390
|
$0.450
|
|
|
VEGETATIVE WATERING
|
MG
|
28.970
|
$17.000
|
$441.840
|
$65.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(10")
|
SY
|
5,901.000
|
$70.000
|
$83.910
|
$105.000
|
|
|
PLANE ASPH CONC PAV(0" TO 3")
|
SY
|
186,861.000
|
$1.900
|
$2.070
|
$1.900
|
|
|
FULL - DEPTH REPAIR CRCP (8"-14")
|
SY
|
22.000
|
$275.000
|
$1,100.000
|
$925.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
172.100
|
$350.000
|
$825.000
|
$800.000
|
|
|
RAIL (TY T631)
|
LF
|
75.000
|
$62.000
|
$312.400
|
$265.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$339,057.670
|
$196,240.790
|
$504,446.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
8.000
|
$5,000.000
|
$26,650.730
|
$19,176.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
70.000
|
$3.000
|
$7.700
|
$7.500
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
70.000
|
$1.250
|
$7.700
|
$2.200
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
250.000
|
$28.000
|
$82.500
|
$70.000
|
|
|
CONC SIDEWALKS (6")
|
SY
|
37.000
|
$70.000
|
$110.000
|
$158.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
1,950.000
|
$22.000
|
$33.000
|
$42.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
11.000
|
$1,750.000
|
$2,227.500
|
$2,755.000
|
|
|
SHORT RADIUS
|
LF
|
25.000
|
$63.000
|
$66.000
|
$72.000
|
|
|
DRIVEWAY TERMINAL ANCHOR SECTION
|
EA
|
5.000
|
$1,000.000
|
$1,188.000
|
$1,491.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
1.000
|
$150.000
|
$1,386.000
|
$2,480.000
|
|
|
MTL BM GD FEN TRANS (ANCHOR PLATE)
|
EA
|
12.000
|
$650.000
|
$962.500
|
$930.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,875.000
|
$2.500
|
$2.200
|
$3.850
|
|
|
REMOVE DOWNSTREAM ANCHOR TERMINAL
|
EA
|
10.000
|
$140.000
|
$220.000
|
$235.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
18.000
|
$2,575.000
|
$3,300.000
|
$3,400.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
9.000
|
$205.000
|
$275.000
|
$285.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
3.000
|
$450.000
|
$423.500
|
$460.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
4,387.000
|
$0.500
|
$0.390
|
$0.400
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
6,130.000
|
$0.170
|
$0.390
|
$0.400
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
42,709.000
|
$0.200
|
$0.390
|
$0.400
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
3,975.000
|
$1.950
|
$1.990
|
$1.100
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
1,214.000
|
$0.840
|
$0.940
|
$0.920
|
|
REFL PAV MRK TY I (W)12"(SLD)(090MIL)
|
LF
|
875.000
|
$3.000
|
$3.910
|
$4.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
|
LF
|
2,318.000
|
$8.000
|
$6.710
|
$6.550
|
|
REFL PAV MRK TY I (W)(ARROW)(090MIL)
|
EA
|
35.000
|
$150.000
|
$126.500
|
$125.000
|
|
REFL PAV MRK TY I (W)(NUMBER)(090MIL)
|
EA
|
16.000
|
$250.000
|
$154.000
|
$148.000
|
|
REFL PAV MRK TY I (W)(RR XING)(090MIL)
|
EA
|
5.000
|
$1,000.000
|
$627.000
|
$600.000
|
|
REFL PAV MRK TY I (Y)8"(SLD)(090MIL)
|
LF
|
270.000
|
$0.850
|
$1.050
|
$1.050
|
|
REFL PAV MRK TY I (Y)12"(SLD)(090MIL)
|
LF
|
275.000
|
$3.000
|
$3.910
|
$4.000
|
|
REFL PAV MRK TY I (Y)24"(SLD)(090MIL)
|
LF
|
375.000
|
$6.250
|
$6.710
|
$6.550
|
|
REFL PAV MRK TY II (W) 4" (BRK)
|
LF
|
4,387.000
|
$0.150
|
$0.280
|
$0.280
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
58,994.000
|
$0.450
|
$0.430
|
$0.420
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
|
LF
|
6,130.000
|
$0.350
|
$0.430
|
$0.420
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
42,709.000
|
$0.450
|
$0.430
|
$0.420
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
836.000
|
$3.600
|
$5.500
|
$5.250
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
131.000
|
$3.700
|
$5.500
|
$5.250
|
|
|
SP MIXES SP-C SAC-A PG64-22
|
TON
|
22,985.000
|
$88.000
|
$118.000
|
$146.000
|
|
|
UNDERSEAL COURSE
|
GAL
|
46,729.000
|
$4.500
|
$5.500
|
$5.740
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$2,800.000
|
$14,287.050
|
$8,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
82.000
|
$52.000
|
$450.570
|
$335.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
300.000
|
$3.000
|
$102.330
|
$75.000
|
|
Totals: |
$3,729,625.320
|
$4,906,019.957
|
$5,879,656.910
|