Show Job Controls
Bid Cobra

HUDSPETH IH 10 (2121-06-052)

Items: 137

County: HUDSPETH
Length: N/A
Highway: IH 10
District: EL PASO
Control Number: 2121-06-052
DBE Goal: N/A
Project: F 2B24(070)
Guaranty: N/A
Time: 408 WORKING DAYS
Engineer's Estimate: $36,843,188.38
Date: 05/02/2024 (2 years ago)
Contract Number: N/A
Type: CONSTRUCT REST AREA
Mail/Deliver Bids To: N/A
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (1)
E
Engineer's Estimate
$36,843,188.38
1
Rejected
$67,770,417.96
Over/Under Est: 83.94% $30,927,229.58

Bid Items & Bid Tabulations

137 Total 0 of 137
HUDSPETH  |  IH 10  |  EL PASO  |  2121-06-052  |  05/02/2024  |  $36,843,188.38  |  F 2B24(070)  |  CONSTRUCT REST AREA  |  408 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
VEMAC, LLC
PREPARING ROW
AC 46.320 $10,000.000 $36,253.680
EXCAVATION (ROADWAY)
CY 167,672.000 $16.000 $3.560
EXCAVATION (SPECIAL)
CY 1.250 $250.000 $3,564.780
EMBANKMENT (FINAL)(DENS CONT)(TY A)
CY 197,129.000 $10.000 $13.220
BROADCAST SEED (TEMP) (WARM)
AC 10.000 $1,000.000 $1,501.630
BROADCAST SEED (TEMP) (COOL)
AC 10.000 $350.000 $1,501.630
STRAW/HAY MLCH SEED(PERM)(URBAN)(SANDY)
AC 10.000 $1,350.000 $5,485.640
VEGETATIVE WATERING
MG 1,255.000 $15.000 $296.420
IRRIGATION SYSTEM LOCATION A
LS 1.000 $55,000.000 $170,984.780
IRRIGATION SYSTEM LOCATION B
LS 1.000 $55,000.000 $170,984.780
PLANT MATERIAL (1-GAL)
EA 40,436.000 $15.000 $13.090
PLANT MATERIAL (3-GAL)
EA 684.000 $25.000 $67.040
PLANT MATERIAL (5-GAL)
EA 202.000 $35.000 $70.150
PLANT MATERIAL (15-GAL)
EA 287.000 $200.000 $94.580
PLANT MATERIAL (30 GAL) (TREE)
EA 68.000 $350.000 $1,450.390
PLANT MATERIAL (45 GAL) (TREE)
EA 34.000 $500.000 $1,911.440
LANDSCAPE EDGE (TYPE I)
LF 2,206.000 $20.000 $15.590
LANDSCAPE EDGE (TYPE II)
LF 817.000 $25.000 $41.560
LANDSCAPE EDGE (TYPE III)
LF 1,506.000 $10.000 $16.620
CEMENT
TON 415.000 $190.000 $332.490
CEMENT TREAT (SUBGRADE)(6")
SY 98,105.000 $3.000 $7.560
PRIME COAT (MULTI OPTION)
GAL 18,986.000 $6.750 $6.230
CONC PVMT (CONT REINF - CRCP) (8")
SY 14,086.000 $85.000 $130.590
CONC PVMT (CONT REINF - CRCP) (10")
SY 75,974.000 $90.000 $160.440
DRILL SHAFT (42 IN)
LF 75.000 $475.000 $662.900
DRILL SHAFT (48 IN)
LF 60.000 $600.000 $741.870
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 416.000 $380.000 $477.200
CL A CONC (MISC)
CY 88.000 $850.000 $935.120
RETAINING WALL (SPECIAL)
SF 546.000 $45.000 $380.600
RIPRAP (CONC)(4 IN)
CY 7.500 $625.000 $935.120
RIPRAP (CONC)(CL B)
CY 26.000 $550.000 $1,142.930
RIPRAP (STONE COMMON)(DRY)(8 IN)
CY 206.000 $205.000 $194.150
RIPRAP (STONE COMMON)(DRY)(12 IN)
CY 2,409.000 $255.000 $189.940
RIPRAP (MOW STRIP)(4 IN)
CY 103.000 $600.000 $831.220
CONC BOX CULV (6 FT X 3 FT)
LF 964.000 $370.000 $562.370
RC PIPE (CL III)(18 IN)
LF 1,858.000 $88.500 $108.410
RC PIPE (CL III)(24 IN)
LF 628.000 $109.000 $159.700
RC PIPE (CL III)(30 IN)
LF 916.000 $150.000 $183.060
RC PIPE (CL III)(36 IN)
LF 316.000 $182.000 $224.610
RC PIPE (CL III)(48 IN)
LF 61.000 $350.000 $380.850
RC PIPE (CL III)(54 IN)
LF 158.000 $250.000 $413.570
RC PIPE (CL III)(60 IN)
LF 498.000 $495.000 $519.260
RC PIPE (CL IV)(36 IN)
LF 18.000 $240.000 $354.980
INLET (COMPL)(TY S)
EA 1.000 $6,400.000 $4,301.130
MANH (COMPL)(PRM)(48IN)
EA 1.000 $7,500.000 $4,924.540
MANH (COMPL)(PRM)(60IN)
EA 2.000 $8,200.000 $4,560.880
JCTBOX(COMPL)(PJB)(4FTX4FT)
EA 3.000 $7,000.000 $5,854.690
INLET (COMPL)(PCO)(3FT)(NONE)
EA 2.000 $6,800.000 $4,815.670
INLET (COMPL)(PCO)(3FT)(LEFT)
EA 10.000 $7,000.000 $5,542.990
INLET (COMPL)(PCO)(3FT)(RIGHT)
EA 11.000 $6,700.000 $5,542.990
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
EA 7.000 $6,500.000 $5,859.670
INLET (COMPL)(ARMOR CURB SLOT)
EA 7.000 $7,175.000 $2,938.690
HEADWALL (CH - FW - 0) (DIA= 36 IN)
EA 6.000 $18,000.000 $6,234.160
HEADWALL (CH - FW - 15) (DIA= 36 IN)
EA 2.000 $8,500.000 $7,792.700
HEADWALL (CH - FW - 15) (DIA= 60 IN)
EA 1.000 $14,000.000 $24,936.650
HEADWALL (CH - FW - 30) (DIA= 48 IN)
EA 2.000 $12,000.000 $18,702.490
HEADWALL (CH - FW - 30) (DIA= 54 IN)
EA 2.000 $13,000.000 $20,572.730
HEADWALL (CH - PW - 0) (DIA= 36 IN)
EA 1.000 $7,500.000 $6,234.160
HEADWALL (CH - PW - 0) (DIA= 60 IN)
EA 1.000 $20,000.000 $16,624.430
WINGWALL (PW - 1) (HW=5 FT)
EA 4.000 $20,500.000 $10,390.270
SET (TY II) (18 IN) (RCP) (6: 1) (C)
EA 1.000 $2,200.000 $2,078.050
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 2.000 $2,200.000 $2,078.060
SET (TY II) (30 IN) (RCP) (3: 1) (C)
EA 2.000 $2,250.000 $4,156.110
CLEAN EXIST CULVERTS
EA 4.000 $4,000.000 $18,702.490
REMOV STR (HEADWALL)
EA 7.000 $2,000.000 $2,968.650
MOBILIZATION
LS 1.000 $2,336,518.570 $6,262,734.580
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 23.000 $10,000.000 $7,896.600
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 1,535.000 $100.000 $76.650
ROCK FILTER DAMS (REMOVE)
LF 1,535.000 $20.000 $25.650
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 156.000 $32.000 $63.610
CONSTRUCTION EXITS (REMOVE)
SY 156.000 $12.000 $25.650
EMBANK (EROSN & SEDMT CONT, IN PLACE)
CY 2,261.000 $29.000 $15.590
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
LF 8,580.000 $7.910 $12.270
PORT CTB (STKPL)(F-SHAPE)(TY 1)
LF 8,580.000 $5.490 $12.270
CONC CURB (MONO) (TY I)
LF 229.000 $24.000 $10.390
CONC CURB (MONO) (TY II)
LF 13,771.000 $25.000 $16.620
CONC SIDEWALKS (4")
SY 372.000 $75.000 $114.290
CONC SIDEWALKS (5")
SY 1,178.000 $90.000 $197.420
CURB RAMPS (TY 2)
EA 2.000 $2,200.000 $2,909.280
CURB RAMPS (TY 10)
EA 3.000 $1,800.000 $2,909.280
CURB RAMPS (TY 20)
EA 3.000 $3,000.000 $4,363.910
CURB RAMPS (TY 21)
EA 1.000 $2,600.000 $3,324.890
MTL W-BEAM GD FEN (STEEL POST)
LF 1,649.000 $41.000 $37.400
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 7.000 $2,000.000 $2,221.440
REMOVE METAL BEAM GUARD FENCE
LF 400.000 $10.000 $3.120
GUARDRAIL END TREATMENT (INSTALL)
EA 7.000 $3,500.000 $4,255.850
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000 $400.000 $335.610
CRASH CUSH ATTEN (REMOVE)
EA 6.000 $1,100.000 $1,870.250
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 6.000 $12,700.000 $10,047.390
WIRE FENCE (TY A)
LF 12,427.000 $20.000 $19.220
IN RD IL (TY SA) 40T-12 (250W EQ) LED
EA 52.000 $6,000.000 $6,849.470
CONDT (PVC) (SCH 40) (2")
LF 12,135.000 $25.000 $34.540
CONDT (PVC) (SCH 40) (2") (BORE)
LF 570.000 $36.000 $56.680
ELEC CONDR (NO.6) INSULATED
LF 31,216.000 $3.250 $3.270
ELEC CONDR (NO.2) INSULATED
LF 8,899.000 $5.000 $5.150
GROUND BOX TY A (122311)W/APRON
EA 20.000 $1,675.000 $2,301.440
ELC SRV TY D 120/240 060(NS)GS(N)GC(O)
EA 1.000 $9,000.000 $10,598.070
ELC SRV TY D 120/240 100(NS)GS(N)GC(O)
EA 2.000 $9,200.000 $11,319.160
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 52.000 $1,000.000 $1,248.910
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 4.000 $1,160.000 $1,723.750
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 4.000 $1,360.000 $1,758.030
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
EA 2.000 $1,800.000 $2,063.510
IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL)
EA 10.000 $1,500.000 $3,794.940
INS OH SN SUP(30 FT BAL TEE)
EA 2.000 $53,500.000 $69,525.570
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 582.000 $2.500 $2.180
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,983.000 $1.900 $2.390
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 538.000 $3.500 $2.910
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 4.000 $230.000 $181.830
REF PAV MRK TY I(W)18"(YLD TRI)(100MIL)
EA 34.000 $56.000 $57.150
RE PM TY I (ACC PRK)(WHT)(SYMBOL ONLY)
EA 4.000 $650.000 $57.150
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 23,220.000 $0.900 $1.000
REF PROF PAV MRK TY I(W)6"(SLD)(100MIL)
LF 15,786.000 $1.250 $1.920
REF PROF PAV MRK TY I(Y)6"(SLD)(100MIL)
LF 12,360.000 $1.400 $1.920
REFL PAV MRKR TY I-A
EA 529.000 $5.000 $4.520
REFL PAV MRKR TY I-C
EA 627.000 $6.000 $4.520
REFL PAV MRKR TY II-C-R
EA 169.000 $7.000 $4.520
LANDSCAPE AMENITY (TY 1)
EA 38.000 $500.000 $405.220
LANDSCAPE AMENITY (TY 2)
EA 71.000 $250.000 $405.220
LANDSCAPE AMENITY (TY 3)
EA 195.000 $100.000 $405.220
LANDSCAPE AMENITY (TY 4)
EA 1.000 $6,680.000 $20,780.540
LANDSCAPE AMENITY (TY 5)
EA 2.000 $8,400.000 $10,390.270
LANDSCAPE AMENITY (TY 6)
EA 2.000 $93,000.000 $10,390.270
LANDSCAPE AMENITY (TY 7)
EA 2.000 $24,300.000 $10,390.270
LOOSE AGGR FOR GROUNDCOVER (TYPE I)
CY 40.000 $250.000 $598.480
LOOSE AGGR FOR GROUNDCOVER (TYPE II)
CY 65.000 $100.000 $534.060
LOOSE AGGR FOR GROUNDCOVER (TYPE III)
CY 75.000 $280.000 $592.250
D-GR HMA TY-B PG64-22
TON 20,706.000 $133.000 $144.680
WHEEL STOPS
EA 4.000 $136.000 $1,039.030
SAFETY REST AREA
LS 1.000 $10,846,802.110 $30,008,285.000
PATCHING MILLED CONCRETE RUMBLE STRIPS
LF 3,365.000 $50.000 $46.760
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $9,560.000 $15,585.410
CCTV FIELD EQUIP (DIGITAL) (INSTL ONLY)
EA 3.000 $3,200.000 $1,511.780
INSTALL DMS (POLE MTD CABINET)
EA 2.000 $31,000.000 $54,487.610
ITS POLE (55 FT)(90 MPH)
EA 3.000 $26,250.000 $33,014.040
ITS POLE MNT CAB (TY 2)(CONF 2)
EA 3.000 $7,600.000 $6,787.960
SYSTEM INTEGRATION
LS 1.000 $100,000.000 $39,483.020
INSTALLATION OF CELLULAR MODEM
EA 5.000 $2,200.000 $1,326.840
Totals: $36,843,188.380 $67,770,417.973